Ind. Code § 13-15-9-3

Current through P.L. 171-2024
Section 13-15-9-3 - Environmental feasibility report

A person proposing to construct:

(1) a nuclear powered generating facility; or
(2) a nuclear fuel reprocessing plant;

shall file with the board an environmental feasibility report, on a form prescribed by the board, concurrently with the filing of the preliminary safety analysis required to be filed with the United States Atomic Energy Commission.

IC 13-15-9-3

Pre-1996 Recodification Citation: 13-7-9-2.

Amended by P.L. 133-2012, SEC. 105, eff. 1/1/2013.
As added by P.L. 1-1996, SEC.5.