Authority: IC 8-1-1-3; IC 8-1-22.5-4
Affected: IC 8-1-2; IC 8-1-22.5
Sec. 2.6.
Required Patrols | Leakage surveys |
After the final leak survey to establish the MAOP under this section, at least 1 additional patrol within the following 3 months. | After the final leak survey to establish the MAOP under this section, at least 1 additional leak survey within the following 3 months. |
170 IAC 5-3-2.6