Application for a special authorization to engage in surface-mining as an incident to the development of land for commercial, residential, industrial or civic use shall be made in writing on forms prescribed by the director and shall be signed and verified by the applicant. The application shall be accompanied by:
The application for the special authorization shall also beaccompanied by a bond, or cash or collateral securities or certificates of the same type, in the form as prescribed by the director and in the minimum amount of two thousand dollars per acre, for a maximum disturbance of five acres.
The bond shall be payable to the state of West Virginia and conditioned that the applicant complete the site preparation for the proposed commercial, residential, industrial or civic use of said land. At the conclusion of the site preparation, in accordance with the site preparation plan submitted with the application, the bond conditions are satisfied and the bond and any cash, securities or certificates furnished with said bond may be released and returned to the applicant. The filing fee for the special authorization is five hundred dollars. The special authorization is valid for two years.
Only eligible persons may secure special authorization to engage in incidental and necessary coal extraction pursuant to a government-financed reclamation contract. Any eligible person who proposes to engage in coal extraction pursuant to a government-financed reclamation contract may request and secure special authorization from the director to conduct such activities under this section. A special authorization can only be obtained if a clause is inserted in a government-financed reclamation contract authorizing such extraction and the person requesting such authorization has affirmatively demonstrated to the director's satisfaction that he or she has satisfied the provisions of this section. A special authorization shall only be granted by the director prior to the commencement of coal extraction on a project area. In order to be considered for a special authorization by the director, an eligible person must meet the permit eligibility requirements of this article and demonstrate at a minimum that:
Prior to commencing coal extraction pursuant to a government-financed reclamation project, the contractor shall file with the director a performance bond conditioned upon the contractor's performance of all the requirements of the government-financed reclamation contract pursuant to this article. For a no cost reclamation contract, the criteria for establishing the amount of the performance bond shall be the engineering estimate, determined by the director: Provided, That the director may establish a lesser bond amount for long term, no cost reclamation projects in which the reclamation schedule extends beyond two years. In these contracts, the director may in the alternative establish a bond amount which reflects the cost of the proportionate amount of reclamation which will occur during a specified period. The performance bond which is provided by the contractor under a federally financed or state financed reclamation contract shall be deemed to satisfy the requirements of thissection: Provided, however, That the amount of such bond is equivalent to or greater than the amount determined by the criteria set forth in this subsection.
W. Va. Code § 22-3-28