Tex. Nat. Res. Code § 120.001

Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 120.001 - Definitions

In this chapter:

(1) "Bureau" means the Bureau of Economic Geology of The University of Texas at Austin.
(2) "Clean energy project" means a project to construct a coal-fueled, natural gas-fueled, or petroleum coke-fueled electric generating facility, including a facility in which the fuel is gasified before combustion, that will:
(A) have a capacity of at least 200 megawatts;
(B) meet the emissions profile for an advanced clean energy project under Section 382.003(1-a)(B), Health and Safety Code;
(C) capture at least 70 percent of the carbon dioxide resulting from or associated with the generation of electricity by the facility;
(D) be capable of permanently sequestering in a geological formation the carbon dioxide captured; and
(E) be capable of supplying the carbon dioxide captured for purposes of an enhanced oil recovery project.
(3) "Commission" means the Railroad Commission of Texas.
(4) "Sequester" means to inject carbon dioxide into a geological formation in a manner and under conditions that create a reasonable expectation that at least 99 percent of the carbon dioxide injected will remain sequestered from the atmosphere for at least 1,000 years.

Tex. Nat. Res. Code § 120.001

Amended by Acts 2013, 83rd Leg. - Regular Session, ch. 1003,Sec. 3, eff. 6/14/2013.
Added by Acts 2009, 81st Leg., R.S., Ch. 1109, Sec. 3, eff. 9/1/2009.