Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 284.152 - Authority to Require Permit(a) Except as otherwise provided by this chapter, a municipality may require a network provider to obtain one or more permits to install a network node, node support pole, or transport facility in a public right-of-way if the permit: (1) is of general applicability to users of the public right-of-way;(2) does not apply exclusively to network nodes; and(3) is processed on nondiscriminatory terms and conditions regardless of the type of entity submitting the application for the permit.(b) A network provider that wants to install or collocate multiple network nodes inside the territorial jurisdiction of a single municipality is entitled to file a consolidated permit application with the municipality for not more than 30 network nodes and receive permits for the installation or collocation of those network nodes.Tex. Loc. Gov't. Code § 284.152
Added by Acts 2017, Texas Acts of the 85th Leg. - Regular Session, ch. 591,Sec. 1, eff. 9/1/2017.