Ohio Rev. Code § 4935.10

Current with legislation from 2024 received as of August 15, 2024.
Section 4935.10 - Study to review the condition of reactive power

The public utilities commission shall conduct a study to review the condition of reactive power in the state. The commission shall issue a report of its findings to the general assembly not later than one year after the effective date of this section.

R.C. § 4935.10

Added by 128th General Assembly, SB 232, §1, eff. 6/17/2010. .