Nev. Rev. Stat. § 704.7318

Current through 82nd (2023) Legislative Session Chapter 535 and 34th (2023) Special Session Chapter 1 and 35th (2023) Special Session Chapter 1
Section 704.7318 - Sites used for production of electricity from coal-fired electric generating plant, natural gas electric generating plant or renewable energy facility: Remediation or reuse; regulation of emissions from electric generating plants constructed on certain sites
1. To ensure the remediation and, when possible, the reuse of any site used for the production of electricity from a coal-fired electric generating plant, natural gas electric generating plant or renewable energy facility in this State, the Division of Environmental Protection of the State Department of Conservation and Natural Resources has exclusive jurisdiction to supervise and regulate the remediation of such sites, including, without limitation, exclusive authority to regulate and supervise the remediation of surface water and groundwater and solid-waste disposal operations located at such a site.
2. The Division of Environmental Protection has exclusive authority to regulate emissions from any electric generating plant constructed on a site previously used for the production of electricity from a coal-fired electric generating plant.

NRS 704.7318

Added to NRS by 2013, 3076; A 2015, 2215
Amended by 2015, Ch. 395,§15, eff. 10/1/2015.
Added by 2013, Ch. 490,§10, eff. 6/11/2013.