Mich. Comp. Laws § 125.3514

Current through Public Act 151 of the 2024 Legislative Session
Section 125.3514 - Wireless communications equipment as permitted use of property; application for special land use approval; approval or denial; authorization by local unit of government; definitions; applicability to small cell wireless communications facilities
(1) Wireless communications equipment is a permitted use of property and is not subject to special land use approval or any other approval under this act if all of the following requirements are met:
(a) The wireless communications equipment will be collocated on an existing wireless communications support structure or in an existing equipment compound.
(b) The existing wireless communications support structure or existing equipment compound is in compliance with the local unit of government's zoning ordinance or was approved by the appropriate zoning body or official for the local unit of government.
(c) The proposed collocation will not do any of the following:
(i) Increase the overall height of the wireless communications support structure by more than 20 feet or 10% of its original height, whichever is greater.
(ii) Increase the width of the wireless communications support structure by more than the minimum necessary to permit collocation.
(iii) Increase the area of the existing equipment compound to greater than 2,500 square feet.
(d) The proposed collocation complies with the terms and conditions of any previous final approval of the wireless communications support structure or equipment compound by the appropriate zoning body or official of the local unit of government.
(2) Wireless communications equipment that meets the requirements of subsection (1)(a) and (b) but does not meet the requirements of subsection (1)(c) or (d) is a permitted use of property if it receives special land use approval under subsections (3) to (6).
(3) An application for special land use approval of wireless communications equipment described in subsection (2) shall include all of the following:
(a) A site plan as required under section 501, including a map of the property and existing and proposed buildings and other facilities.
(b) Any additional relevant information that is specifically required by a zoning ordinance provision described in section 502(1) or 504.
(4) After an application for a special land use approval is filed with the body or official responsible for approving special land uses, the body or official shall determine whether the application is administratively complete. Unless the body or official proceeds as provided under subsection (5), the application shall be considered to be administratively complete when the body or official makes that determination or 14 business days after the body or official receives the application, whichever is first.
(5) If, before the expiration of the 14-day period under subsection (4), the body or official responsible for approving special land uses notifies the applicant that the application is not administratively complete, specifying the information necessary to make the application administratively complete, or notifies the applicant that a fee required to accompany the application has not been paid, specifying the amount due, the running of the 14-day period under subsection (4) is tolled until the applicant submits to the body or official the specified information or fee amount due. The notice shall be given in writing or by electronic notification. A fee required to accompany any application shall not exceed the local unit of government's actual, reasonable costs to review and process the application or $1,000.00, whichever is less.
(6) The body or official responsible for approving special land uses shall approve or deny the application not more than 60 days after the application is considered to be administratively complete. If the body or official fails to timely approve or deny the application, the application shall be considered approved and the body or official shall be considered to have made any determination required for approval.
(7) Special land use approval of wireless communications equipment described in subsection (2) may be made expressly conditional only on the wireless communications equipment's meeting the requirements of other local ordinances and of federal and state laws before the wireless communications equipment begins operation.
(8) If a local unit of government requires special land use approval for wireless communications equipment that does not meet the requirements of subsection (1)(a) or for a wireless communications support structure, subsections (4) to (6) apply to the special land use approval process, except that the period for approval or denial under subsection (6) is 90 days.
(9) A local unit of government may authorize wireless communications equipment as a permitted use of property not subject to a special land use approval.
(10) This section does not apply to an activity or use that is regulated by the small cell wireless communications facilities deployment act.
(11) As used in this section:
(a) "Colocate" means to place or install wireless communications equipment on an existing wireless communications support structure or in an existing equipment compound. "Collocation" has a corresponding meaning.
(b) "Equipment compound" means an area surrounding or adjacent to the base of a wireless communications support structure and within which wireless communications equipment is located.
(c) "Wireless communications equipment" means the set of equipment and network components used in the provision of wireless communications services, including, but not limited to, antennas, transmitters, receivers, base stations, equipment shelters, cabinets, emergency generators, power supply cables, and coaxial and fiber optic cables, but excluding wireless communications support structures.
(d) "Wireless communications support structure" means a structure that is designed to support, or is capable of supporting, wireless communications equipment, including a monopole, self-supporting lattice tower, guyed tower, water tower, utility pole, or building.

MCL 125.3514

Amended by 2018, Act 366,s 2, eff. 3/12/2019.
Added by 2012, Act 143,s 1, eff. 5/24/2012.