Current through the 2024 Legislative Session.
Section 32132.7 - Use of design-build procedure at Modoc Medical Center(a) Notwithstanding Section 32132 or any other law, upon approval by the board of directors of the Last Frontier Health Care District, the design-build procedure described in Chapter 4 (commencing with Section 22160) of Part 3 of Division 2 of the Public Contract Code may be used to assign contracts for the construction of a building or improvements directly related to construction of a hospital or health facility building at the Modoc Medical Center.(b) For purposes of this section, all references in Chapter 4 (commencing with Section 22160) of Part 3 of Division 2 of the Public Contract Code to "local agency" shall mean the Last Frontier Health Care District and its board of directors.(c) A hospital building project utilizing the design-build process authorized by subdivision (a) shall be reviewed and inspected in accordance with the standards and requirements of the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Chapter 1 (commencing with Section 129675) of Part 7 of Division 107).Ca. Health and Saf. Code § 32132.7
Added by Stats 2014 ch 18 (SB 268),s 2.5, operative on the date that Senate Bill 785 takes effect if Senate Bill 785 is also enacted and takes effect on or before January 1, 2015, in which case Section 2 of this bill shall become inoperative on the date that Senate Bill 785 takes effect.