Current through Register Vol. XLI, No. 45, November 8, 2024
Section 47-57B-4 - Groundwater Protection Standards and Preventative Action Limits4.1. Groundwater protection standards, preventative action limits and compliance monitoring stations are hereby established in Table 57B-4 and for the following individual constituents: beryllium, cadmium, chromium, nickel, and lead.4.2. The groundwater protection standards and preventative action limits are established for the coal storage site at the variance applicable area referenced in Section 3 of this rule. The variance shall not pertain to any other activities or areas at the facility.4.3. Compliance with preventative action limits shall also be determined at the same monitoring stations as the groundwater protection standards.4.4. If any groundwater protection standard (GWPS) or preventative action limit (PAL) is exceeded, the Secretary shall cause such action to be taken as specified in Section 5 of this rule, "Terms and Conditions" to assure that standards of purity and quality are not violated.W. Va. Code R. § 47-57B-4