Wash. Admin. Code § 51-11R-10200

Current through Register Vol. 24-21, November 1, 2024
Section 51-11R-10200 - Section R102-Alternative materials, design and methods of construction and equipment

R102.1 General. The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved. The code official shall have the authority to approve an alternative material, design or method of construction upon the written application of the owner or owner's authorized agent. The code official shall first find that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that the material, method or work offered is, for the purpose intended, not less than the equivalent of that prescribed in this code for strength, effectiveness, fire resistance, durability, energy efficiency and safety. The code official shall respond in writing, stating the reason why the alternative was approved or was not approved.

Wash. Admin. Code § 51-11R-10200

Amended by WSR 16-02-127, Filed 1/6/2016, effective 7/1/2016
Amended by WSR 20-01-047, Filed 12/9/2019, effective 7/1/2020
Amended by WSR 23-02-060, Filed 1/3/2023, effective 7/1/2023

Statutory Authority: RCW 19.27A.020, 19.27A.045 and chapters 19.27 and 34.05 RCW. 13-04-055, § 51-11R-10200, filed 2/1/13, effective 7/1/13.