Wash. Admin. Code § 352-75-070

Current through Register Vol. 24-21, November 1, 2024
Section 352-75-070 - Equipment breakdown

Each financial recipient is responsible for the upkeep or preservation of condition of its sewage pumpout and dump station facility, including cost of ordinary repairs necessary and proper from time to time for that purpose. In the event an equipment breakdown does occur, the financial recipient must notify state parks within two working days of the breakdown. The facility must be repaired and be fully operational within ten days after the breakdown where the breakdown can be cured with normal expected repairs of five hundred dollars or less. For repairs greater than five hundred dollars, the facility must be fully operational within twenty days after the breakdown. A written report for all breakdowns must be submitted to state parks within two weeks of the breakdown describing the problem(s), repair(s), and cost(s). State parks reserves the right to make exceptions to the breakdown repair time limits in extenuating circumstances.

Wash. Admin. Code § 352-75-070

Statutory Authority: Chapters 43.51 and 88.36 RCW. 91-15-103, § 352-75-070, filed 7/24/91, effective 8/24/91. Statutory Authority: RCW 43.51.050. 90-10-052, § 352-75-070, filed 4/30/90, effective 5/31/90.