Specific inspections and tests of the BOPE may be made by the Division. The Division shall be notified at least 48 hours prior to the commencement of a BOPE test. The requirements for tests will be included in the Division's answer to the notice of the intention to drill. The operator shall test the equipment for the prevention of a blowout under pressure. The operator shall submit to the Division the pressure data and supporting information for the equipment for the prevention of a blowout as soon as practicable after the conclusion of the testing. All blowout preventers and related equipment that may be exposed to well pressure must be tested first to a low pressure and then to a high pressure:
The Division may waive the requirement for installation of a logging unit on evidence that the owner or operator has engaged a qualified mud engineer to monitor, log and record the data specified in the above subparagraphs a. through d. The drilling rate required in subparagraph e shall be logged with standard industry recording devices, and hydrogen sulfide monitoring and safety equipment shall be provided whenever needed to satisfy the requirement of subparagraph f.
The following requirements are for exploratory areas, unstable areas containing fumaroles, geysers, hot springs, mud pots, and for fields with a history of lost circulation, a blowout, or zone pressures less than 1000 psi. These requirements may be reduced by the State Engineer where the geothermal formations are known to be shallow and of low pressure and temperature.
The following requirements are for areas where it is known that dry steam exists at depth or formation pressures are less than hydrostatic:
Utah Admin. Code R655-1-3