Current through Register Vol. 54, No. 45, November 9, 2024
Section 145.146 - Recordkeeping(a) The owner or operator of a Portland cement kiln shall maintain an operating log for each Portland cement kiln. The operating log must include the following on a monthly basis: (1) The total hours of operation.(2) The type and quantity of fuel used.(3) The quantity of clinker produced.(b) The records maintained by the owner or operator of a Portland cement kiln must include the following: (1) Source tests and operating parameters established during the initial source test and subsequent testing.(2) The date, time and duration of any start-up, shutdown or malfunction of a Portland cement kiln or emissions monitoring system.(3) The date and type of maintenance, repairs or replacements performed on the kilns, control devices and emission monitoring systems.(c) The owner or operator of a Portland cement kiln shall maintain the records required under this section onsite for 5 years. The records shall be made available to the Department upon request. The provisions of this §145.146 adopted June 18, 2010, effective 6/19/2010, 40 Pa.B. 3346.The provisions of this §145.146 issued under section 5(a)(1) of the Air Pollution Control Act (35 P.S. § 4005(a)(1)).
This section cited in 25 Pa. Code § 129.97 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule); and 25 Pa. Code § 129.112 (relating to presumptive RACT requirements, RACT emission limitations and petition for alternative compliance schedule).