A breakdown of, and supporting documentation for, the total construction cost of the treatment works is required, including intercepting sewers and pumping stations which are integral parts of the treatment facilities, the cost of land and rights of way acquired after September 1, 1937, total engineering costs covering the preparation of plans and specifications, supervision and inspection of construction, legal and financial expenses, and interest during construction with a basis for proration of the costs ascribed to eligible facilities. Supporting documentation shall include, but not be limited to:
25 Pa. Code § 103.32
The provisions of this §103.32 amended under the act of August 20, 1953 (P. L. 1217, No. 339) (35 P. S. §§ 701-703); The Clean Streams Law (35 P. S. §§ 691.1-691.1001); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20).