Section 340-248-0205 - Emission Standards and Procedural Requirements: General Provisions
(1) A person may not openly accumulate friable asbestos material or asbestos-containing waste material.
(2) Contractors working on asbestos abatement projects at secure facilities must ensure that all security clearance requirements are completed before asbestos abatement projects at secure facilities start so that DEQ inspectors may gain immediate access to perform required asbestos project inspections.
(3) A person may not sand, grind, saw, or abrade asbestos-containing material unless during such activity the material is handled and disposed of as friable asbestos material as this division provides.
(4) The content of asbestos in asbestos-containing material must be determined using the method specified by the Environmental Protection Agency as listed in EPA/600/R-93/116, July 1993, "Method for the Determination of Asbestos in Bulk Building Materials" or another substantially similar method approved by DEQ. Bulk samples must not be composited for analysis.

Or. Admin. R. 340-248-0205

DEQ 1-2002, f. & cert. ef. 2-4-02; DEQ 19-2002(Temp), f. & cert. ef. 12-23-02 thru 6-21-03; DEQ 9-2003, f. 5-21-03, cert. ef. 6-21-03; DEQ 195-2018, amend filed 11/15/2018, effective 11/15/2018

To view tables referenced in rule text, click here to view rule.

Statutory/Other Authority: ORS 468.020, 468A.025, 468A.135 & 468A.745

Statutes/Other Implemented: ORS 468A.700 - 468A.760