The operator of a solution well shall submit a plan to monitor cavity size and shape for approval by the director. The plan shall include frequency of monitoring and shall include a description of the method used to determine the size and shape of the cavity.
N.D. Admin Code 43-02-02.4-26
General Authority: NDCC 38-12-02
Law Implemented: NDCC 38-12-02