In addition to responding in accordance with section 753-4.6(a) of this Subpart, the operator shall attend a pre-demolition conference with the excavator upon the excavators request.
N.Y. Comp. Codes R. & Regs. Tit. 16 §§ 753-4.12
In addition to responding in accordance with section 753-4.6(a) of this Subpart, the operator shall attend a pre-demolition conference with the excavator upon the excavators request.
N.Y. Comp. Codes R. & Regs. Tit. 16 §§ 753-4.12