N.Y. Comp. Codes R. & Regs. tit. 16 § 255.1003

Current through Register Vol. 46, No. 41, October 9, 2024
Section 255.1003 - General requirements of a GDPIM plan
(a) Unless exempted in subdivision (b) of this section, sections 255.1003 through 255.1015 of this Part prescribe the minimum requirements for a GDPIM program for any gas distribution pipeline covered under this Part, including liquefied petroleum gas systems. A gas distribution operator, other than a master operator or small LPG operator, must follow the requirements in sections 255.1005 through 255.1013 of this Part. A master operator or small LPG operator of a gas distribution pipeline must follow the requirements in section 255.1015 of this Part.
(b)Exceptions.

Sections 255.1003 through 255.1015 of this Part do not apply to an individual service line directly connected to a transmission, gathering, or production pipeline.

N.Y. Comp. Codes R. & Regs. Tit. 16 § 255.1003