Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:9A-11.1 - Site/soil requirements(a) Seepage pits shall not be approved except as specified in 7:9A-7.6. When a seepage pit is approved, the following site/soil requirements shall be met: 1. The bottom of any seepage pit shall be a minimum of eight feet above any hydraulically restrictive horizon or substratum not fully penetrated or any massive rock substratum.2. The bottom of any seepage pit shall be a minimum of four feet above any fractured rock substratum.3. The bottom of any seepage pit shall be a minimum of four feet above the level of the seasonally high water table.N.J. Admin. Code § 7:9A-11.1