N.J. Admin. Code § 14:2-5.1

Current through Register Vol. 56, No. 18, September 16, 2024
Section 14:2-5.1 - General markout provisions
(a) When an operator is required pursuant to N.J.A.C. 14:2-4.2(b) to mark out a site, the operator shall perform the markout in accordance with this subchapter.
(b) When more than one underground facility of the same type is located within a rigid structure or envelope such as a concrete pipe or a conduit, the markout shall indicate the envelope and not the individual underground facilities inside the envelope.
(c) If an excavator has marked the perimeter of a proposed excavation or demolition site with white in accordance with N.J.A.C. 14:2-3.2(c), (d), and (e), an operator shall mark out all of the operator's facilities that lie within the white perimeter marking, and in addition all facilities outside the white perimeter that are within 10 feet of the white marking.
(d) All facilities newly installed by the operator shall be back flagged and marked according to N.J.A.C. 14:2-5.2, upon completion of the installation. If there is a valid notice of intent to excavate in accordance with N.J.A.C. 14:2-3.1 in the scope of the work area where the facilities have been installed, that has not yet reached its "start by" date, the excavator must be notified about the newly installed facilities. This shall be done by updating the positive response.

N.J. Admin. Code § 14:2-5.1

Administrative Change, 52 N.J.R. 533(a).
Amended by 54 N.J.R. 1417(a), effective 7/18/2022