Current through Register No. 44, October 31, 2024
Section Ed 321.15 - Total Cost of School Building Construction(a) For purposes of calculating school building aid, total eligible costs include: (1) The costs for acquisition of land and site development;(3) Planning and design costs, including:c. Project manager fees if required by RSA 198:15-cIV;(4) Purchase of furniture, fixtures, and equipment necessary for the completion of a building, including commissioning fees, computers and software necessary to operate the security, HVAC, or other building system components, fire retardant window treatments, seating, lockers, clock systems, sound systems, and other equipment that is integral to the building and educational services; and(5) Purchase or lease-purchase of mechanical, structural, or electrical equipment, including the cost of installation of such equipment, which is designed to improve energy efficiency or indoor air quality in buildings.(b) Costs related to financing such as bonding charges and interest shall not be included in the total cost of school building construction and shall not be eligible for inclusion in the calculation of school building aid.(c) Costs for construction work that is not located on school property shall not be eligible for inclusion in the calculation of school building aid. This shall include, but not be limited to, costs for construction of municipally owned sidewalks, costs for improvements to municipally owned roadways, costs for installation of traffic control devices, and costs to construct or improve utility plant to bring service to the school.N.H. Admin. Code § Ed 321.15
#8265, eff 1-22-05; ss by #10363, eff 6-15-13
Amended by Volume XL Number 28, Filed July 9, 2020, Proposed by #13054, Effective 6/12/2020, Expires 6/12/2030.