PURPOSE: This rule contains the new options for release detection for the previously deferred field-constructed tanks and airport hydrant fuel distribution piping systems.
Maximum Detectable Leak Rate Per Test Section Volume | ||
Test Section Volume (Gallons) | Biannual Test Maximum Detectable Leak Rate (Gallons Per Hour) | Annual Test Maximum Detectable Leak Rate (Gallons Per Hour) |
< 50,000 | 1.0 | 0.5 |
>= 50,000 to < 75,000 | 1.5 | 0.75 |
>= 75,000 to < 100,000 | 2.0 | 1.0 |
>= 100,000 | 3.0 | 1.5 |
10 CSR 26-2.047