Minn. R. agency 167, ch. 7001, SOLID WASTE MANAGEMENT FACILITY PERMITS, pt. 7001.3150

Current through Register Vol. 49, No. 20, November 12, 2024
Part 7001.3150 - CERTIFICATION OF PERMIT APPLICATIONS AND REPORTS

A person who signs a permit application or any portion of it, or any report required by a permit to be submitted to the commissioner or agency must make the certification required by part 7001.0070 and shall make the following additional certification: "I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment." An engineer registered in Minnesota must certify all technical documents, such as design drawings and specifications, engineering reports, and hydrogeologic studies, required to be submitted as part of a permit application or by a permit condition.

The hydrogeologic report and all related ground water and surface water monitoring reports must be signed by a person knowledgeable in the field of hydrogeology. This person must certify the quality of work performed and must have been responsible for the gathering and interpretation of the hydrogeologic data and the preparation of the reports.

Minn. R. agency 167, ch. 7001, SOLID WASTE MANAGEMENT FACILITY PERMITS, pt. 7001.3150

13 SR 1150

Statutory Authority: MS s 115.03; 116.07