Md. Code Regs. 21.05.11.02

Current through Register Vol. 51, No. 20, October 4, 2024
Section 21.05.11.02 - Determination on Use of the Design-Build Method

Before the solicitation is issued, the procurement officer shall prepare a written determination justifying the use of the design-build method which addresses some or all of the following criteria:

A. The extent to which the unit can adequately define the project requirements;
B. Time constraints for delivery of the project;
C. Capability and experience of prospective contractors with the design-build method or similar experience;
D. Suitability of the project for use of the design-build method of project delivery with respect to time, schedule, costs, and quality factors; and
E. Capability of the agency to manage the project.

Md. Code Regs. 21.05.11.02