Ill. Admin. Code tit. 35 § 306.403

Current through Register Vol. 48, No. 41, October 11, 2024
Section 306.403 - Critical Review
a) Critical review means the Agency's determination that a sewer is approaching hydraulic capacity or a sewage treatment plant is approaching design capacity and, as a result, additional sewer connection permit applications will require close scrutiny to determine whether issuance would result in a violation of the Act or regulations.
b) Notification of Critical Review is a warning that Restricted Status is imminent unless corrective action is taken. A facility may be placed on Critical Review whenever, based upon information available to it, the Agency determines that the organic or hydraulic loading of any facility is greater than 80% of the permitted or designed capacity of that facility, as defined in Section 306.402.

Ill. Admin. Code tit. 35, § 306.403

Section 306.403 was renumbered from Section 306.105(c) at 7 Ill. Reg. 5682, effective April 19, 1983

Amended at 47 Ill. Reg. 4641, effective 3/23/2023