Haw. Code R. § 11-20-25

Current through September, 2024
Section 11-20-25 - Consideration of an exemption request

In the director's consideration of whether the public water system is unable to comply due to compelling factors, the director shall consider such factors as the director determines to be relevant, including the following:

(1) Construction, installation, or modification of treatment equipment or public water systems;
(2) The time needed to put into operation a new treatment facility to replace an existing system which is not in compliance; and
(3) Economic feasibility of compliance.

Haw. Code R. § 11-20-25

[Eff 12/26/81; am and comp 3/7/92; am and comp 1/2/93; comp 12/15/94; comp 10/13/97; comp 9/7/99; comp 11/30/02; am and comp 12/16/05; comp 11/28/11; comp MAY 02 2014 ] (Auth: HRS §§ 340E-2, 340E-9) (Imp: HRS §§ 340E-2, 340E-3, 340E-9; 42 U.S.C. §§ 300g-1, 300g-2, 300g-5; 40 C.F.R. Parts 141, 142, § 141.4, § 142.10, § 142.20 )
Comp 12/28/2017
Comp 10/29/2020