This account shall include the cost in place of structures and improvements used in connection with local storage of gas within or adjacent to distribution areas. (See gas plant instruction 7.)
220 CMR, 50, 361
This account shall include the cost in place of structures and improvements used in connection with local storage of gas within or adjacent to distribution areas. (See gas plant instruction 7.)
220 CMR, 50, 361