Effluent Limitations
Pollutant | Requirement |
(i) Iron, total | May not exceed baseline loadings (as defined by appendix B of this part). |
(ii) Manganese, total | May not exceed baseline loadings (as defined by appendix B of this part). |
(iii) Acidity, net | May not exceed baseline loadings (as defined by appendix B of this part). |
(iv) TSS | During remining and reclamation, may not exceed baseline loadings (as defined by appendix B of this part). Prior to bond release, the pre-existing discharge must meet the applicable standards for TSS or SS contained in subpart E.1 |
1 A pre-existing discharge is exempt from meeting standards in subpart E of this part for TSS and SS when the permitting authority determines that subpart E standards are infeasible or impractical based on the site-specific conditions of soil, climate, topography, steep slopes, or other baseline conditions provided that the operator demonstrates that significant reductions of TSS and SS will be achieved through the incorporation of sediment control BMPs into the Pollution Abatement Plan as required by paragraph (a) of this section.
40 C.F.R. §434.72