38 C.F.R. § 20.504

Current through August 31, 2024
Section 20.504 - Rule 504. Extension of time for filing a Substantive Appeal in simultaneously contested claims

An extension of the 30-day period to file a Substantive Appeal in simultaneously contested claims may be granted if good cause is shown. In granting an extension, consideration will be given to the interests of the other parties involved. A request for such an extension must be in writing and must be made prior to expiration of the time limit for filing the Substantive Appeal.

38 C.F.R. §20.504

57 FR 4109, Feb. 3, 1992. Redesignated and amended at 84 FR 183, Jan. 18, 2019

Authority: 38 U.S.C. 7105A(b) (2016)

84 FR 183, 2/19/2019