(a) Final grades must be designed and maintained to reduce impacts to health and safety and take into consideration any postclosure land use. [Note: for final grading requirements concerning water quality protection, see section § 21090(b).](b) Subsequent to the creation and submittal of the initial postclosure topographic map, pursuant to § 21090(e)(1), the EA shall require the owner and/or operator to produce five- yearly iso settlement maps meeting the requirements of § 21090(e)(2)and(3) only if:(1) the RWQCB does not require such maps (for the purpose of water quality protection at the landfill); and(2) the EA finds that such maps are needed for reasons other than water quality protection.Cal. Code Regs. Tit. 27, § 21142
1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25). Note: Authority cited: Sections 40502 and 43020, Public Resources Code; and Section 66796.22(d), Government Code. Reference: Sections 43021, 43103 and 44100, Public Resources Code; and Section 66796.22(d), Government Code.
1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25).