3 Alaska Admin. Code § 52.630

Current through September 25, 2024
Section 3 AAC 52.630 - Standards for nonfuel costs

Nonfuel costs used in the calculation of power cost equalization per kilowatt-hour are subject to the following standards:

(1) depreciation rates must be in accordance with the guidelines established by the Rural Electrification Administration that were in effect as of January 1, 1988, or, if different, the standards established by the commission;
(2) depreciation expense is not allowed on plant funded with grants, contributions in aid of construction, or other nonutility money; and
(3) unless the commission authorizes a different method of cost recovery appropriate to the overhaul, costs for major overhauls on equipment must be amortized over an appropriate period approved by the commission.

3 AAC 52.630

Eff. 10/28/89, Register 112; am 9/11/2004, Register 171

Authority:AS 42.05.141

AS 42.05.151

AS 42.45.110

AS 42.45.130

AS 42.45.160

AS 42.45.170