17 Alaska Admin. Code § 15.381

Current through September 25, 2024
Section 17 AAC 15.381 - Utility change orders
(a) Changes in the plans, specifications, or quantities of work for relocating facilities must be authorized by a utility change order issued by the department.
(b) Modified cost estimates, plans, and a scope-of-work statement must include in each utility change order.

17 AAC 15.381

Eff. 5/23/82, Register 82

Authority:AS 02.15.020

AS 02.15.102

AS 02.15.106

AS 19.05.020

AS 19.05.040

AS 19.25.010

AS 19.25.020

AS 19.30.051

AS 19.30.121

AS 19.40.065

AS 35.05.020

AS 35.10.210

AS 35.10.230