Drawbridge Operation Regulations: Passaic River, NJ

Download PDF
Federal RegisterJun 26, 2002
67 Fed. Reg. 42997 (Jun. 26, 2002)

AGENCY:

Coast Guard, DOT.

ACTION:

Temporary final rule.

SUMMARY:

The Coast Guard is establishing a temporary final rule governing the operation of the Route 7 (Rutgers Street) Bridge, at mile 8.9, across the Passaic River at Belleville, New Jersey. This rule allows the bridge to remain in the closed position from June 15, 2002 through September 3, 2002. This action is necessary to facilitate structural work at the bridge.

DATES:

This temporary final rule is effective from June 15, 2002 through September 3, 2002.

ADDRESSES:

Material received from the public, as well as documents indicated in this preamble as being available in the docket, are part of docket (CGD01-02-060) and are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts, 02110, 6:30 a.m. to 3 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT:

Mr. Joe Arca, Project Officer, First Coast Guard District, (212) 668-7165.

SUPPLEMENTARY INFORMATION:

Regulatory Information

The Coast Guard has determined that good cause exists under the Administrative Procedure Act (5 U.S.C. 553) for not publishing a NPRM with comment and for making this rule effective in less than thirty days after publication in the Federal Register. The Coast Guard believes notice and comment are unnecessary because the only vessel operator upstream from the bridge can pass under the bridge without a bridge opening. In view of the historic absence of bridge opening requests and the demonstrated need to complete structural work at the bridge, any delay encountered in this regulation's effective date would be unnecessary and contrary to the public interest.

Background

The Route 7 (Rutgers Street) Bridge, at mile 8.9, across the Passaic River, has a vertical clearance of 8 feet at mean high water, and 13 feet at mean low water in the closed position. The existing drawbridge operating regulations are listed at 33 CFR 117.739(k) require the bridge to open on signal if at least four-hours notice is given.

The Route 7 Bridge has been replaced with a new Route 7 Bridge located at the same alignment on the waterway and with the same vertical clearance as the old structure. The final phase of bridge construction involves installation of the roadway deck. During this installation the bridge will not be able to open for vessel traffic. Presently there is only one vessel operator upstream from this bridge and that vessel can pass under the bridge without a bridge opening.

The bridge owner, New Jersey Department of Transportation, requested a temporary regulation to facilitate final structural work at the bridge. The Coast Guard believes this rule is reasonable because no vessel traffic will be precluded from transiting this bridge as a result of this bridge closure.

Regulatory Evaluation

This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866 and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Transportation (DOT) (44 FR 11040; February 26, 1979). This conclusion is based on the fact that no known vessel traffic will be prevented from transiting the bridge as a result of this bridge closure.

Small Entities

Under the Regulatory Flexibility Act (5 U.S.C. 601-612) we considered whether this rule would have a significant economic impact on a substantial number of small entities. “Small entities” comprises small businesses, not-for profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations less than 50,000.

The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities. This conclusion is based on the fact that no known vessels will be prevented from transiting this bridge as a result of this bridge closure.

Assistance for Small Entities

Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they could better evaluate its effects on them and participate in the rulemaking process. Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247).

Collection of Information

This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).

Federalism

We have analyzed this rule under Executive Order 13132 and have determined that this rule does not have implications for federalism under that Order.

Unfunded Mandates Reform Act

The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) governs the issuance of Federal regulations that require unfunded mandates. An unfunded mandate is a regulation that requires a State, local, or tribal government or the private sector to incur direct costs without the Federal Government's having first provided the funds to pay those unfunded mandate costs. This rule will not impose an unfunded mandate.

Taking of Private Property

This rule will not effect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

Civil Justice Reform

This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

Protection of Children

We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.

Environment

The Coast Guard considered the environmental impact of this rule and concluded that under figure 2-1, paragraph (32)(e) of Commandant Instruction M16475.1C, this rule is categorically excluded from further environmental documentation because promulgation of changes to drawbridge regulations have been found to not have a significant effect on the environment. A written “Categorical Exclusion Determination” is not required for the temporary final rule.

Indian Tribal Governments

This final rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it does not have substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

Energy Effects

We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. It has not been designated by the Administrator of the Office of Information and Regulatory Affairs as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

List of Subjects in 33 CFR Part 117

  • Bridges

Regulations

For the reasons set out in the preamble, the Coast Guard amends 33 CFR part 117 as follows:

PART 117—DRAWBRIDGE OPERATION REGULATIONS

1. The authority citation for part 117 continues to read as follows:

Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 117.255 also issued under the authority of Pub. L. 102-587, 106 Stat. 5039.

2. From June 15, 2002 through September 3, 2002, § 117.739 is temporarily amended by suspending paragraph (k) and adding a new paragraph (q) to read as follows:

Passaic River

(q) The draw of the Route 7 (Rutgers Street) Bridge, mile 8.9, need not open for the passage of vessel traffic from June 15, 2002 through September 3, 2002.

Dated: May 31 2002.

J.L. Grenier,

Captain, U.S. Coast Guard Acting Commander, First Coast Guard District.

[FR Doc. 02-16130 Filed 6-25-02; 8:45 am]

BILLING CODE 4910-15-P