Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards

Download PDF
Federal RegisterOct 25, 2013
78 Fed. Reg. 63877 (Oct. 25, 2013)

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

EPA is approving a State Implementation Plan (SIP) revision submitted by the State of Delaware. The SIP revision addresses the infrastructure elements of the Clean Air Act (CAA), necessary to implement, maintain, and enforce the 2010 nitrogen dioxide (NO2) national ambient air quality standard (NAAQS). EPA is approving this SIP revision in accordance with the requirements of the CAA.

DATES:

This final rule is effective on November 25, 2013.

ADDRESSES:

EPA has established a docket for this action under Docket ID Number EPA-R03-OAR-2013-0392. All documents in the docket are listed in the www.regulations.gov Web site. Although listed in the electronic docket, some information is not publicly available, i.e., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy for public inspection during normal business hours at the Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the Delaware Department of Natural Resources and Environmental Control, 89 Kings Highway, P.O. Box 1401, Dover, Delaware 19903.

FOR FURTHER INFORMATION CONTACT:

Rose Quinto, (215) 814-2182, or by email at quinto.rose@epa.gov.

SUPPLEMENTARY INFORMATION:

I. Background

On August 14, 2013 (78 FR 49409), EPA published a notice of proposed rulemaking (NPR) for the State of Delaware. In the NPR, EPA proposed approval of Delaware's submittal that provides the basic elements specified in section 110(a)(2) of the CAA, necessary to implement, maintain, and enforce the 2010 NO2 NAAQS.

II. Summary of SIP Revision

On March 27, 2013, the Delaware Department of Natural Resources and Environmental Control (DNREC) submitted a SIP revision that addresses the infrastructure elements specified in section 110(a)(2) of the CAA, necessary to implement, maintain and enforce the 2010 NO2 NAAQS. This submittal addressed the following infrastructure elements of section 110(a)(2): (A), (B), (C), (D), (E), (F), (G), (H), (I), (J), (K), (L), and (M).

Specific requirements of section 110(a)(2) of the CAA and the rationale for EPA's proposed action to approve the SIP submittal are explained in the NPR and the technical support document (TSD) and will not be restated here. No public comments were received on the NPR.

III. Final Action

EPA is approving Delaware's submittal which provides the basic program elements specified in section 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M) of the CAA, necessary to implement, maintain, and enforce the 2010 NO2 NAAQS, as a revision to the Delaware SIP. This rulemaking action is being taken under section 110 of the CAA. This rulemaking action does not include approval of Delaware's submittal for section of 110(a)(2)(I) of the CAA which pertains to the nonattainment requirements of part D, Title I of the CAA, since this element is not required to be submitted by the 3-year submission deadline of section 110(a)(1) of the CAA, and will be addressed in a separate process.

IV. Statutory and Executive Order Reviews

A. General Requirements

Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

  • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);
  • does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
  • is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
  • does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
  • does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
  • is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
  • is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
  • is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
  • does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

B. Submission to Congress and the Comptroller General

The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by December 24, 2013. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action.

This action pertaining to Delaware's section 110(a)(2) infrastructure elements for the 2010 NO2 NAAQS, may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

  • Environmental protection
  • Air pollution control
  • Incorporation by reference
  • Nitrogen dioxide
  • Reporting and recordkeeping requirements

Dated: September 24, 2013.

W.C. Early,

Acting Regional Administrator, Region III.

40 CFR part 52 is amended as follows:

PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

1. The authority citation for part 52 continues to read as follows:

Authority: 42 U.S.C. 7401 et seq.

Subpart I—Delaware

2. In § 52.420, the table in paragraph (e) is amended by adding an entry for Section 110(a)(2) Infrastructure Requirements for the 2010 NO 2 NAAQS at the end of the table to read as follows:

§ 52.420
Identification of plan.

(e) * * *

Name of non-regulatory SIP revision Applicable geographic or nonattainment area State submittal date EPA approval date Additional explanation
*         *         *         *         *         *         *
Section 110(a)(2) Infrastructure Requirements for the 2010 NO2 NAAQS Statewide 3/27/13 10/25/13 [Insert Federal Register page number where the document begins and date] This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M).

[FR Doc. 2013-25025 Filed 10-24-13; 8:45 am]

BILLING CODE 6560-50-P