Application to Export Electric Energy; Royal Bank of Canada

Download PDF
Federal RegisterJul 16, 2013
78 Fed. Reg. 42512 (Jul. 16, 2013)

AGENCY:

Office of Electricity Delivery and Energy Reliability, DOE.

ACTION:

Notice of application.

SUMMARY:

Royal Bank of Canada (RBC) has applied to renew its authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act.

DATES:

Comments, protests, or motions to intervene must be submitted on or before August 15, 2013.

ADDRESSES:

Comments, protests, or motions to intervene should be addressed to: Lamont Jackson, Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585-0350. Because of delays in handling conventional mail, it is recommended that documents be transmitted by overnight mail, by electronic mail to Lamont.Jackson@hq.doe.gov, or by facsimile to 202-586-8008.

FOR FURTHER INFORMATION CONTACT:

Lamont Jackson (Program Office) at 202-586-0808, or by email to Lamont.Jackson@hq.doe.gov.

SUPPLEMENTARY INFORMATION:

Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)).

On September 4, 2008, DOE issued Order No. EA-342, which authorized RBC to transmit electric energy from the United States to Canada as a power marketer for a five-year term using existing international transmission facilities. That authority expires on September 4, 2013. On July 3, 2013, RBC filed an application with DOE for renewal of the export authority contained in Order No. EA-342 for an additional five-year term.

In its application, RBC states that it does not own, operate or control any electric generating or transmission facilities nor does the applicant have a franchised service area. The electric energy that RBC proposes to export to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies, and other entities within the United States. The existing international transmission facilities to be utilized by RBC have previously been authorized by Presidential permits issued pursuant to Executive Order 10485, as amended, and are appropriate for open access transmission by third parties.

Procedural Matters: Any person desiring to be heard in this proceeding should file a comment or protest to the application at the address provided above. Protests should be filed in accordance with Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of Practice and Procedures (18 CFR 385.211). Any person desiring to become a party to these proceedings should file a motion to intervene at the above address in accordance with FERC Rule 214 (18 CFR 385.214). Five copies of such comments, protests, or motions to intervene should be sent to the address provided above on or before the date listed above.

Comments on the RBC application to export electric energy to Canada should be clearly marked with OE Docket No. EA-342-A. An additional copy is to be provided directly to Matthew S. Arnold, Senior Counsel, Royal Bank of Canada, 200 Bay Street, 14th Floor, North Tower, Toronto, Ontario, Canada M5J 2J5 and Elizabeth Jordan, Director, Compliance, RBC Capital Markets, 200 Bay Street, 9th Floor, South Tower, Toronto, Ontario, Canada M5J 2J2. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to DOE's National Environmental Policy Act Implementing Procedures (10 CFR part 1021) and after a determination is made by DOE that the proposed action will not have an adverse impact on the sufficiency of supply or reliability of the U.S. electric power supply system.

Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at http://energy.gov/node/11845,, or by emailing Angela Troy at Angela.Troy@hq.doe.gov.

Issued in Washington, DC, on July 9, 2013.

Brian Mills,

Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.

[FR Doc. 2013-17004 Filed 7-15-13; 8:45 am]

BILLING CODE 6450-01-P