40 C.F.R. § 52.1670

Current through October 31, 2024
Section 52.1670 - Identification of plan
(a)Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for New York under section 110 of the Clean Air Act, as amended, 42 U.S.C. 7401 et seq., and 40 CFR part 51 to meet National Ambient Air Quality Standards.
(b)Incorporation by reference.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 . Material is incorporated as it exists on the date of the approval, and notification of any change in the material will be published in the FEDERAL REGISTER. Entries in paragraphs (c) and (d) of this section with an EPA approval date after August 1, 2015, will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 2 certifies that the rules/regulations provided by the EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations, which have been approved as part of the SIP as of August 1, 2015.
(3) Copies of the materials incorporated by reference may be inspected at the Environmental Protection Agency, Region 2, Air Programs Branch, 290 Broadway, New York, New York 10007; and the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: www.archives.gov/federal-register/cfr/ibr-locations.html.
(c)EPA approved regulations.

EPA-Approved New York State Regulations and Laws

State citation Title/subjectState effective dateEPA approval date Comments
Title 6, Part 200, Subpart 200.1General Provisions, Definitions2/25/202110/1/2021[.] EPA is approving definitions that are not already federally enforceable.
[.] EPA approval finalized at 86 FR 54375.
Title 6, Part 200, Subpart 200.6General Provisions, Acceptable ambient air quality2/25/20004/22/2008[.] EPA approval finalized at 73 FR 21548.
Title 6, Part 200, Subpart 200.7General Provisions, Maintenance of equipment2/25/20004/22/2008[.] EPA approval finalized at 73 FR 21548.
Title 6, Part 200, Subpart 200.9General Provisions, Referenced material3/18/20228/25/2022[.] EPA is approving referenced materials that previously were not Federally enforceable.
[.] EPA approval finalized at 87 FR 52337.
Title 6, Part 201Permits and Registrations4/4/199310/3/2005[.] This action removes subpart 201.5(e) from the State's Federally approved SIP.
[.] EPA approval finalized at 70 FR 57511.
Title 6, Part 201, Subpart 201-2.1(b)(21)Permits and Registrations, Definitions10/15/201112/27/2016EPA is including the definition of "Major stationary source or major source or major facility" with the understanding that the definition applies only to provisions of Part 231.
Revisions are approved except for changes to the definitions in 201-2.1(b)(21)(i) and 201-2.1(b)(21)(v) withdrawn by NYSDEC as per July 28, 2016 letter to EPA Region 2.
EPA approval finalized at 81 FR 95049
Title 6, Part 201, Subpart 201-7.1Permits and Registrations, Federally Enforceable Emission Caps7/7/199610/3/2005[.] EPA approval finalized at 70 FR 57511.
Title 6, Part 201, Subpart 201-7.2Permits and Registrations, Emission Capping Using Synthetic Minor Permits7/7/199610/3/2005[.] EPA approval finalized at 70 FR 57511.
Title 6, Part 202Emissions Testing, Sampling and Analytical Determinations3/24/197911/12/1981[.] EPA approval finalized at 46 FR 55690.
Title 6, Part 202, Subpart 202-2Emission Statements12/18/202012/28/2023[.] EPA approval finalized at 88 FR 89593.
Title 6, Part 203Oil and Natural Gas Sector3/18/20228/25/2022[.] EPA approval finalized at 87 FR 52337.
Title 6, Part 204NOX Budget Trading Program2/25/20005/22/2001[.] Incorporates NOX SIP Call and NOX Budget Trading Program for 2003 and thereafter.
[.] EPA approval finalized at 66 FR 28063.
Title 6, Part 205Architectural and Industrial Maintenance Coatings1/11/202210/3/2022[.] EPA approval finalized at 87 FR 59695.
Title 6, Part 207Control Measures for an Air Pollution Episode2/22/197911/12/1981[.] EPA approval finalized at 46 FR 55690.
Title 6, Part 211General Prohibitions1/1/20113/8/2012[.] Section 211.1 (previously numbered 211.2) is not part of the approved plan. (see 11/27/1998, 63 FR 65559).
[.] EPA approval finalized at 77 FR 13974.
Title 6, Part 212Process Operations2/25/202110/1/2021[.] EPA approval finalized at 86 FR 54375.
Title 6, Part 213Contaminant Emissions from Ferrous Jobbing Foundries5/1/19729/22/1972[.] EPA approval finalized at 37 FR 19814.
Title 6, Part 214By-Product Coke Oven Batteries9/22/19947/20/2006[.] EPA approval finalized at 71 FR 41163.
Title 6, Part 215Open Fires6/16/19729/22/1972[.] EPA approval finalized at 37 FR 19814.
Title 6, Part 216Iron and/or Steel Processes9/22/19947/20/2006[.] EPA approval finalized at 71 FR 41163.
Title 6, Part 217, Subpart 217-1Motor Vehicle Emissions, Motor Vehicle Enhanced Inspection and Maintenance Program Requirements Until December 31, 201012/5/20102/28/2012[.] EPA approval finalized at 77 FR 11742.
Title 6, Part 217, Subpart 217-4Motor Vehicle Emissions, Inspection and Maintenance Program Audits Until December 31, 201012/5/20102/28/2012[.] EPA approval finalized at 77 FR 11742.
Title 6, Part 217, Subpart 217-6Motor Vehicle Emissions, Motor Vehicle Enhanced Inspection and Maintenance Program Requirements Beginning January 1, 201112/5/20102/28/2012[.] EPA approval finalized at 77 FR 11742.
Title 6, Part 218, Subpart 218-1Emission Standards for Motor Vehicles and Motor Vehicle Engines, Applicability and Definitions12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 218, Subpart 218-2Emission Standards for Motor Vehicles and Motor Vehicle Engines, Certification and Prohibitions12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 218, Subpart 218-3Emission Standards for Motor Vehicles and Motor Vehicle Engines, Fleet Average12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 218, Subpart 218-4Emission Standards for Motor Vehicles and Motor Vehicle Engines, Zero Emissions Vehicle Sales Mandate5/28/19921/6/1995[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 60 FR 2025.
Title 6, Part 218, Subpart 218-5Emission Standards for Motor Vehicles and Motor Vehicle Engines, Testing12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 218, Subpart 218-6Emission Standards for Motor Vehicles and Motor Surveillance12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 218, Subpart 218-7Emission Standards for Motor Vehicles and Motor Vehicle Engines, Aftermarket Parts12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 218, Subpart 218-8Emission Standards for Motor Vehicles and Motor Vehicle Engines, Severability12/28/20001/31/2005[.] EPA's approval of part 218 only applies to light-duty vehicles.
[.] EPA approval finalized at 70 FR 4773.
Title 6, Part 219Incinerators3/14/20206/2/2022[.] EPA approval finalized at 87 FR 33438.
Title 6, Part 220Portland Cement Plants and Glass Plants7/11/20107/12/2013[.] SIP revisions submitted in accordance with § 220-1.6(b)(4) and 220-2.3(a)(4) are effective only if approved by EPA.
[.] EPA approval finalized at 78 FR 41846.
Title 6, Part 222Distributed Generation Sources3/25/20206/2/2022[.] EPA approval finalized at 87 FR 33438.
Title 6, Part 223Petroleum Refineries8/9/19847/19/1985[.] EPA approval finalized at 50 FR 29382.
Title 6, Part 224Sulfuric and Nitric Acid Plants5/10/19847/19/1985[.] Variances adopted by the State pursuant to Part 224.6(b) become applicable only if approved by EPA as SIP revisions.
[.] EPA approval finalized at 50 FR 29382.
Title 6, Part 225, Subpart 225-1Fuel Composition and Use-Sulfur Limitations4/5/20138/23/2018[.] Exceptions or Variances adopted by the State pursuant to §§ 225.1.3 and 1.4(b) become applicable only if approved by EPA as SIP revisions (40 CFR 52.1675(e) ).
[.] EPA approval finalized at 83 FR 42589.
Title 6, Part 225, Subpart 225-2Fuel Composition and Use-Waste Fuel7/28/19838/2/1984[.] EPA approval finalized at 49 FR 30936.
Title 6, Part 225, Subpart 225-3Fuel Composition and Use-Gasoline11/4/20019/8/2005[.] The Variance adopted by the State pursuant to section 225-3.5 becomes applicable only if approved by EPA as a SIP revision.
[.] EPA approval finalized at 70 FR 53304.
Title 6, Part 226Solvent Cleaning Processes and Industrial Cleaning Solvents11/1/20195/13/2020
Title 6, Part 227, Subpart 227.2(b)(1)Stationary Combustion Installations5/1/19729/22/1972[.] 1972 version.
[.] EPA approval finalized at 37 FR 19814.
Title 6, Part 227, Subpart 227-1Stationary Combustion Installations2/25/20216/5/2023[.] EPA approved finalized at 6/5/2023, 88 FR 36481
Title 6, Part 227, Subpart 227-2Stationary Combustion Installations, Reasonably Available Control Technology (RACT) For Major Facilities of Oxides of Nitrogen (NOX)7/8/20107/12/2013[.] SIP revisions submitted in accordance with § 227-2.3(c) are effective only if approved by EPA.
[.] EPA approval finalized at 78 FR 41846.
Title 6, Part 227, Subpart 227-3Ozone Season Oxides of Nitrogen (NOx) Emission Limits for Simple Cycle and Regenerative Combustion Turbines1/16/20208/11/2021, 86 FR 43956 EPA approval finalized at 86 FR 43956
Title 6, Part 228Surface Coating Processes, Commercial and Industrial Adhesives, Sealants and Primers6/5/20133/4/2014[.] EPA approval finalized at 79 FR 12082.
Title 6, Part 229Petroleum and Volatile Organic Liquid Storage and Transfer4/4/199312/23/1997[.] SIP revisions submitted in accordance with Section 229.3(g)(1) are effective only if approved by EPA.
[.] EPA approval finalized at 62 FR 67006.
Title 6, Part 230Gasoline Dispensing Sites and Transport Vehicles2/12/20212/9/2023EPA approval finalized at 88 FR 8371.
Title 6, Part 231New Source Review for New and Modified Facilities10/15/201112/27/2016Full approval except for certain revisions to 231-5.5(b)(3), 231-6.6(b)(3), 231-10.1(d), 231-12.4(a)(1), 231-12.7, and 231-13.5 Table 5 withdrawn by NYSDEC as per July 28, 2016 NYSDEC letter to EPA Region 2.
The PM2.5 Significant Monitoring Concentration (SMC) is approved as 0 [MICRO]g/m3 in 231-12.4(a)(1).
EPA approval finalized at 81 FR 95049
Title 6, Part 232Dry Cleaning8/11/19836/17/1985[.] EPA has not determined that § 232.3(a) provides for reasonably available control technology.
[.] EPA approval finalized at 50 FR 25079.
Title 6, Part 233Pharmaceutical and Cosmetic Manufacturing Processes4/4/199312/23/1997[.] SIP revisions submitted in accordance with Section 223.3(h)(1) are effective only if approved by EPA.
[.] EPA approval finalized at 62 FR 67006.
Title 6, Part 234Graphic Arts7/8/20103/8/2012[.] SIP revisions submitted in accordance with § 234.3(f) are effective only if approved by EPA.
[.] EPA approval finalized at 77 FR 13974.
Title 6, Part 235Consumer Products2/11/20219/16/2022[.] EPA approval finalized at 87 FR 56893.
Title 6, Part 236Synthetic Organic Chemical Manufacturing Facility Component Leaks1/12/19927/27/1993[.] Variances adopted by the State pursuant to Part 236.6(e)(3) become applicable only if approved by EPA as a SIP revision.
[.] EPA approval finalized at 58 FR 40059.
Title 6, Part 239Portable Fuel Container Spillage Control7/30/20095/28/2010[.] The specific application of provisions associated with alternate test methods, variances and innovative products, must be submitted to EPA as SIP revisions.
[.] EPA approval finalized at 75 FR 29897.
Title 6, Part 240, Subpart 240-1Transportation Conformity, Transportation Conformity General Provisions9/13/20137/29/2014[.] EPA approval finalized at 79 FR 43945.
Title 6, Part 240, Subpart 240-2Transportation Conformity, Consultation9/13/20137/29/2014[.] EPA approval finalized at 79 FR 43945.
Title 6, Part 240, Subpart 240-3Transportation Conformity, Regional Transportation-Related Emissions and Enforceability9/13/20137/29/2014[.] EPA approval finalized at 79 FR 43945.
Title 6, Part 241Asphalt Pavement and Asphalt Based Surface Coating1/1/20113/8/2012[.] EPA approval finalized at 77 FR 13974.
Title 6, Part 243CSAPR NOX Ozone Season Group 2 Trading Program1/2/20198/8/2019[.] EPA approval finalized at 84 FR 38878.
Title 6, Part 244CSAPR NOX Annual Trading Program1/2/20198/8/2019[.] EPA approval finalized at 84 FR 38878.
Title 6, Part 245CSAPR SO2 Group 1 Trading Program1/2/20198/8/2019[.] EPA approval finalized at 84 FR 38878.
Title 6, Part 249Best Available Retrofit Technology (BART)5/6/20108/28/2012[.] EPA approval finalized at 77 FR 51915.
Title 15, Part 79, Subparts 79.1-79.15, 79.17, 79.20, 79.21, 79.24, 79.25Motor Vehicle Inspection Regulations12/29/20102/28/2012[.] EPA approval finalized at 77 FR 11742.
Title 19, Part 937Access To Publicly Available Records8/27/20126/20/2013[.] Only subpart 937.1(a) is approved into the SIP and is for the limited purpose of satisfying Clean Air Act Section 128(a)(2).
[.] EPA approval finalized at 78 FR 37124.
Section 19-0325Environmental Conservation Law, Sulfur reduction requirements7/15/20108/28/2012[.] EPA approval finalized at 77 FR 51915.
Section 73-aPublic Officers Law, Financial disclosure8/15/20116/20/2013[.] Only subsections 73-a(2)(a)(i) and (ii) are approved into the SIP and are for the limited purpose of satisfying Clean Air Act Section 128(a)(2).
[.] EPA approval finalized at 78 FR 37124.

(d)EPA approved State source-specific requirements.

EPA-Approved New York Source-Specific Provisions

Name of source Identifier No.State effective dateEPA approval date Comments
Dunlop Tire and Rubber CorporationConsent Order 81-36, 9-04208/19/19811/26/1984[.] Part 212 VOC RACT Compliance Plan.
[.] Green tire spraying, bead dipping, and under tread and tread end cementing processes.
[.] EPA approval finalized at 49 FR 3436.
Dunlop Tire and Rubber CorporationConsent Order 81-36, 9-0420, Amendment Letter 11/29/19821/26/1984[.] Part 212 VOC RACT Compliance Plan.
[.] Green tire spraying, bead dipping, and under tread and tread end cementing processes.
[.] EPA approval finalized at 49 FR 3436.
Dunlop Tire and Rubber CorporationConsent Order 81-36, 9-0420, Amendment Letter 23/3/19821/26/1984[.] Part 212 VOC RACT Compliance Plan.
[.] Green tire spraying, bead dipping, and under tread and tread end cementing processes.
[.] EPA approval finalized at 49 FR 3436.
Morton International Inc.A563203003500027C9/1/19959/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission point 00027.
[.] EPA approval finalized at 62 FR 49617.
Morton International Inc.A563203003500027C, Special Conditions8/23/19959/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission point 00027.
[.] EPA approval finalized at 62 FR 49617.
University of Rochester8-2614-00548/00006-04/25/19969/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission points 00003 and 0005.
[.] EPA approval finalized at 62 FR 49617.
University of Rochester8-2614-00548/00006-0, Special Conditions3/19/19969/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission points 00003 and 0005.
[.] EPA approval finalized at 62 FR 49617.
Algonquin Gas Transmission Company3-3928-1/9-09/23/19919/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission Points R0100, R0200, R0300, and R0400.
[.] Permit and Special Conditions.
[.] EPA approval finalized at 62 FR 49617.
Algonquin Gas Transmission Company3-3928, Special Conditions3/18/19969/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission Points R0100, R0200, R0300.
[.] EPA approval finalized at 62 FR 49617.
Algonquin Gas Transmission Company3-3928-00001/000133/29/19969/23/1997[.] Part 227-2, NOX RACT determination.
[.] Emission Point R0400.
[.] EPA approval finalized at 62 FR 49617.
Algonquin Gas Transmission Company3-39228-00001/00010,11,12,138/8/19969/23/1997[.] Permit Correction.
[.] Part 227-2, NOX RACT determination.
[.] Emission Points R0100, R0200, R0300, and R0400.
[.] EPA approval finalized at 62 FR 49617.
Tenneco Gas Corporation's (also known as Tenneco Gas Pipeline Company and Tennessee Gas Pipeline Company)1440008/22/19957/21/2003[.] Part 227-2, NOX RACT determination.
[.] Compressor Station 229.
[.] Emission Points 0001A through 0006A.
[.] EPA approval finalized at 68 FR 42981.
Tenneco Gas Corporation's (also known as Tenneco Gas Pipeline Company and Tennessee Gas Pipeline Company)215600, Special Conditions2/24/19977/21/2003[.] Part 227-2, NOX RACT determination.
[.] Compressor Station 245.
[.] Emission Points 00001 through 00006.
[.] EPA approval finalized at 68 FR 42981.
Tenneco Gas Corporation's (also known as Tenneco Gas Pipeline Company and Tennessee Gas Pipeline Company)10260010/4/19957/21/2003[.] Part 227-2, NOX RACT determination.
[.] Compressor Station 254.
[.] Emission Points 00001 through 00006.
[.] EPA approval finalized at 68 FR 42981.
Tenneco Gas Corporation's (also known as Tenneco Gas Pipeline Company and Tennessee Gas Pipeline Company)102600,Special Conditions9/15/19957/21/2003[.] Part 227-2, NOX RACT determination.
[.] Compressor Station 254.
[.] Emission Points 00001 through 00006.
[.] EPA approval finalized at 68 FR 42981.
General Chemical Corporation7-3132-00009/0001212/16/19977/1/2004[.] Part 212, NOX RACT determination. 6/23/05 letter informing NYSDEC that the approval will automatically convert to a disapproval.
[.] Emission Points 0SN1A and 0SN1B.
[.] EPA approval finalized at 69 FR 39858.
ALCOA Massena Operations (West Plant)6-4058-000033/20/20128/28/2012[.] Part 249 BART.
[.] Emission Points Potline S-00001, Baking furnace S-00002, Package Boilers B-00001.
[.] EPA approval finalized at 77 FR 51915.
Arthur Kill Generating Station, NRG2-6403-000143/20/20128/28/2012[.] Part 249 BART.
[.] Boiler 30.
[.] EPA approval finalized at 77 FR 51915.
Bowline Generating Station, GenOn3-3922-000036/28/20128/28/2012[.] Part 249 BART.
[.] Boilers 1 and 2.
[.] EPA approval finalized at 77 FR 51915.
Con Edison 59th Street Station2-6202-000323/20/20128/28/2012[.] Part 249 BART.
[.] Steam Boilers 114 and 115.
[.] EPA approval finalized at 77 FR 51915.
EF Barrett Power Station, NG1-2820-005533/27/20128/28/2012[.] Part 249 BART.
[.] Boiler 2.
[.] EPA approval finalized at 77 FR 51915.
International Paper Ticonderoga Mill5-1548-000083/19/20128/28/2012[.] Part 249 BART.
[.] Power Boiler and Recovery Furnace.
[.] EPA approval finalized at 77 FR 51915.
Kodak Operations at Eastman Business Park, Kodak8-2614-002055/25/20128/28/2012[.] Part 249 BART.
[.] Boilers 41, 42 and 43.
[.] EPA approval finalized at 77 FR 51915.
Lafarge Building Materials4-0124-000017/19/20118/28/2012[.] Condition 12-14.
[.] Kilns 1 and 2.
[.] EPA approval finalized at 77 FR 51915.
Lehigh Northeast Cement, Lehigh Cement5-5205-000137/5/20128/28/2012[.] Part 220 and Part 249 BART.
[.] Kiln and Clinker cooler.
[.] EPA approval finalized at 77 FR 51915.
Northport Power Station, NG1-4726-001303/27/20128/28/2012[.] Part 249 BART.
[.] Boilers 1, 2, 3, and 4.
[.] EPA approval finalized at 77 FR 51915.
Oswego Harbor Power, NRG7-3512-000305/16/20128/28/2012[.] Part 249 BART.
[.] Boilers 5 and 6.
[.] EPA approval finalized at 77 FR 51915.
Owens-Corning Insulating Systems Feura Bush, Owens Corning4-0122-000045/18/20128/28/2012[.] Part 249 BART.
[.] EU2, EU3, EU12, EU13, and EU14.
[.] EPA approval finalized at 77 FR 51915.
Ravenswood Generating Station, TC2-6304-000244/6/20128/28/2012[.] Part 249 BART.
[.] Boilers 10, 20, 30.
[.] EPA approval finalized at 77 FR 51915.
Ravenswood Steam Plant, Con Edison2-6304-013783/20/20128/28/2012,[.] Part 249 BART.
[.] Boiler 2.
[.] EPA approval finalized at 77 FR 51915.
Roseton Generating StationNYSDEC Facility No. 3334600007512/5/20162/16/2018Best Available Retrofit Technology (BART) emission limits for SO2 pursuant to 6 NYCRR part 249 for Units 1 and 2.
Samuel A Carlson Generating Station, James town Board of Public Utilities9-0608-000532/8/20128/28/2012[.] Part 249 BART.
[.] Boiler 12.
[.] EPA approval finalized at 77 FR 51915.
Syracuse Energy Corporation [GDF Suez]7-3132-000525/24/20128/28/2012[.] Part 249 BART.
[.] Boiler 1.
[.] EPA approval finalized at 77 FR 51915.
Danskammer Energy LLC, Danskammer Generating StationNYSDEC Facility No. 333460000112/25/201512/4/2017Best Available Retrofit Technology (BART) emission limits for NOX, SO2, and PM pursuant to 6 NYCRR part 249 for Unit 4 and the requirement to combust only natural gas.
Finch Paper LLC5-5205-00005/00059 Mod 11/12/20225/16/2024RACT emission limits for condition 1-1, condition 47, and condition 60.
Sylvamo Ticonderoga Mill5-1548-00008/0008111/23/20229/19/2024, 89 FR 76742RACT emission limits for condition 52, 78, and 85.

(e)EPA approved nonregulatory and quasi-regulatory provisions.

EPA-Approved New York Nonregulatory and Quasi-Regulatory Provisions

Action/SIP element Applicable geographic or nonattainment areaNew York submittal dateEPA
approval date
Explanation
SIP revision for carbon monoxide concerning the oxyfuel programNew York-Northern New Jersey-Long Island carbon monoxide nonattainment area8/30/19994/19/2000, 65 FR 20909
Stage II gasoline vapor recovery comparability planUpstate portions of New York State4/18/20009/29/2000, 65 FR 58364
The 1990 base year emission inventory (Volatile organic compounds (VOC), Nitrogen oxides (NOX) and Carbon monoxide (CO))Areas designated nonattainment for ozone since 1991 in New York State2/2/19995/10/2001, 66 FR 23851
1996 and 1999 ozone projection year emission inventoriesNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area2/2/19995/10/2001, 66 FR 23851
Photochemical assessment monitoring stations networkNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area2/2/19995/10/2001, 66 FR 23851
Enforceable commitments for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area2/2/19995/10/2001, 66 FR 23851
15 Percent Rate of Progress Plan and the 9 Percent Reasonable Further Progress Plan for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area2/2/19995/10/2001, 66 FR 23851
2002, 2005 and 2007 ozone projection year emission inventoriesNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area11/27/19982/4/2002, 67 FR 5194
Reasonable Further Progress Plans for milestone years 2002, 2005 and 2007 for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area11/27/19982/4/2002, 67 FR 5194
Contingency measures for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area11/27/19982/4/2002, 67 FR 5194
Reasonably Available Control Measure Analysis for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area10/1/20012/4/2002, 67 FR 5194
Attainment demonstration for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area11/27/1998, supplemented on 4/15/1999, and 4/18/20002/4/2002, 67 FR 5194
Enforceable commitments for future actions associated with attainment of the 1-hour ozone national ambient air quality standardNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area4/18/20002/4/2002, 67 FR 5194
SIP revision to the carbon monoxide maintenance planOnondaga County6/22/20049/8/2005, 70 FR 53304
1990 and 2007 conformity emission budgets for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area1/29/2003, amended on
6/29/2003 and 1/18/2005
9/13/2005, 70 FR 53944
Revised commitment to perform a mid-course review for ozoneNew York portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment area1/29/20039/13/2005, 70 FR 53944
New York reasonably available control technology (RACT) analysis for ozoneStatewide and to the New York portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT and the Poughkeepsie 8-hour ozone moderate nonattainment areas9/1/06, supplemented on 2/8/2008 and 9/16/20087/23/2010, 75 FR 43069
Reasonably available control measure (RACM) analysis for ozoneNew York portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT 8-hour ozone moderate nonattainment area2/8/20087/23/2010, 75 FR 43069
2002 base year emissions inventory;
2008 projection year emissions inventories;
2008 motor vehicle emissions budgets used for planning purposes;
2008 ozone reasonable further progress (RFP) plan; and
2008 RFP Plan contingency measures.
New York portion of the New York-Northern New Jersey-Long Island 8-hour ozone nonattainment area2/8/2008 supplemented
on 12/28/2009 and 1/26/2011
August 18, 2011
2002 base year emissions inventoryPoughkeepsie 8-hour ozone moderate nonattainment area2/8/2008 supplemented
on 12/28/2009 and 1/26/2011
August 18, 2011
2002 base year emissions inventoryState-wide2/8/2008 supplemented
on 12/28/2009 and 1/26/2011
August 18, 2011
Implementation Plan for Regional HazeStatewide3/15/20008/28/2012, 77 FR 51915The plan is approved except for the BART determinations for Danskammer Generating Station Unit 4 and Roseton Generating Station Units 1 and 2. See 40 CFR 52.1686 .
Regional Haze plan-Fuel Oil Sulfur ContentStatewide4/16/20128/28/2012, 77 FR 51915
Regional Haze Plan-BART Permit modificationsStatewide4/16/20128/28/2012, 77 FR 51915
Regional Haze Plan-BART Permit modificationsStatewide7/2/20128/28/2012, 77 FR 51915
1997 8-hour Ozone-Attainment DemonstrationNew York portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT 8-hour ozone moderate nonattainment area2/8/20082/11/2013, 78 FR 9596
1997 8-hour Ozone-Attainment DemonstrationPoughkeepsie 8-hour ozone moderate nonattainment area2/8/20082/11/2013, 78 FR 9596
Section 110(a)(2) Infrastructure Requirements for the 1997 8-hour ozone and the 1997 and 2006 PM2.5 NAAQSStatewide12/13/2007, 10/2/2008,
3/15/2010 and supplemented on 5/23/2013
6/20/2013, 78 FR 37122This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) prongs 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Maintenance plan for the 1997 and 2006 PM2.5 National Ambient Air Quality Standards. 2007 attainment year emissions inventory. 2009, 2017, and 2025 motor vehicle emissions budgetNew York portion of the 1997 and 2006 New York-Northern New Jersey-Long Island, NY-NJ-CT, PM2.5 nonattainment area6/27/2013 and supplemented on 9/18/2013 and 2/27/20144/18/2014, 79 FR 21857
Approval of CO maintenance plan, CO motor vehicle budgets, and 2007 CO base year emissions inventoryNew York portion of the New York-Northern New Jersey-Long Island (NYCMA) CO area5/9/20135/30/2014, 79 FR 31045This is the 2nd 10-year CO maintenance plan for the New York portion of the NYCMA.
Section 110(a)(2) Infrastructure Requirements for the 2010 Primary Nitrogen Dioxide NAAQSStatewide5/8/2013, and supplemented on 5/23/20139/12/2014, 79 FR 54619This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M).
Section 110(a)(2) Infrastructure Requirements for the 2008 Primary Pb NAAQSStatewide10/13/2011, and supplemented on 2/24/20126/1/2015, 80 FR 30940This action addresses the following CAA elements: 110(a)(2)(A), (B), (D)(i)(I) prongs 1 and 2, D(i)(II) prong 4, (E), (F), (G), (H), (K), (L), and (M).
Limited off-street parking programNew York County-Central Business District10/5/20126/12/2015, 80 FR 33425Removing reference to program from SIP.
Section 110(a)(2) Infrastructure Requirements for the 2008 ozone NAAQSStatewide4/4/20138/26/2016, 81 FR 58854This action addresses the following CAA element: 110(a)(2)(D(i)(II) prong 4.
Section 110(a)(2) Infrastructure Requirements for the 2008 ozone NAAQSStatewide4/4/201312/27/2016, 81 FR 95049This action addresses the following CAA elements: 110(a)(2)(C), (D)(i)(II) prong 3, and (J).
Section 110(a)(2) Infrastructure Requirements for the 2008 Pb NAAQSStatewide10/13/2011, and supplemented on 2/24/201212/27/2016, 81 FR 95049This action addresses the following CAA elements: 110(a)(2)(C), (D)(i)(II) prong 3, and (J).
Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 NAAQSStatewide10/3/201312/27/2016, 81 FR 95049This action addresses the following CAA elements: 110(a)(2)(C), (D)(i)(II) prong 3, and (J).
Regional Haze Five-Year Progress ReportState-wide6/16/20159/29/2017, 82 FR 45499
2008 8-hour Ozone RACT analysisStatewide and to the New York portion of the New York-Northern New Jersey-Long Island (NY-NJ-CT) and the Jamestown 8-hour ozone nonattainment areas12/22/201412/12/2017[.] Full approval as it applies to non-CTG major sources of VOCs and to major sources of NOX.
[.] Conditional approval as it applies to CTG for VOC major sources.
2008 8-hour Ozone Nonattainment New Source Review RequirementsStatewide and to the New York portion of the New York-Northern New Jersey-Long Island (NY-NJ-CT) and the Jamestown 8-hour ozone nonattainment areas12/22/201412/12/2017[.] Full approval.
Section 185 fee programState-wide1/31/2014, supplemented on 4/7/2014, 10/13/2016, and 4/3/20184/2/2019, 84 FR 12511Approval of the Low Emissions Vehicle Program (LEV II) as an alternative section 185 fee program
Section 110(a)(2) Infrastructure Requirements for the 2008 Ozone NAAQSStatewide4/4/201310/10/2019, 84 FR 54502This action addresses the following CAA elements: 110(a)(2)(A), (B), (D)(ii), (E), (F), (G), (H), (K), (L) and (M).
Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 NAAQSStatewide10/3/201310/10/2019, 84 FR 54502This action addresses the following CAA elements: 110(a)(2)(A), (B), (D)(i)(II) prong 4, (D)(ii), (E), (F), (G), (H), (K), (L) and (M).
Section 110(a)(2) Infrastructure Requirements for the 2012 PM2.5 NAAQSStatewide11/30/201610/10/2019, 84 FR 54502This action addresses the following CAA elements: 110(a)(2)(A), (B), (C) [enforcement measures and PSD program for major sources], (D)(i)(II) prong 3, (D)(ii), (E), (F), (G), (H), (J) [for consultation, public notification and prevention of significant deterioration] (K), (L) and (M).
2008 8-hour Ozone RACT Analysis and CertificationStatewide and to the New York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/13/2017 as supplemented on 11/05/20195/13/2020, 85 FR 28490[.] Full approval.
[.] Addresses the 12/22/2014 conditional approval as it applies to CTG for VOC major sources.
[.] Certifies New York has met the RACT requirements as it applies to non-CTG major sources of VOCs, all CTG sources of VOCs, other than the 2016 oil and natural gas CTG, and to major sources of NOX for the Moderate 2008 8-hour Ozone New York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area.
2008 8-hour Ozone Specific Nonattainment New Source Review Requirements CertificationNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/13/20175/13/2020, 85 FR 28490[.] Full approval.
2008 8-hour Ozone Nonattainment Emission Statement Program CertificationNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/13/20175/13/2020, 85 FR 28490[.] Full approval.
2008 8-hour Ozone Nonattainment Motor Vehicle Enhanced Inspection and Maintenance (I/M) Program CertificationNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/13/20175/13/2020, 85 FR 28490[.] Full approval.
Section 110(a)(2) Infrastructure Requirements for the 2012 PM2.5 NAAQS, Interstate Transport ProvisionsStatewide11/30/20167/22/2020, 85 FR 44209This action addresses the following CAA elements: 110(a)(2)(D)(i)(I) prongs 1 and 2.
1997 8-hour Ozone-Attainment DemonstrationNew York portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT 8-hour ozone moderate nonattainment area11/13/20179/2/2021, 86 FR 49249[.] Full approval.
[.] This action addresses the attainment demonstration requirements of the May 4, 2016 SIP Call (81 FR 26697).
Section 110(a)(2) Infrastructure Requirements for the 2015 Ozone NAAQSStatewide9/25/20189/2/2021, 86 FR 49252Full approval. This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (H), (J), (K), (L), (M).
Section 110(a)(2)(G) Infrastructure Requirements for the 2015 Ozone NAAQSStatewide7/10/20199/2/2021, 86 FR 49252Full approval.
2011 base year emissions inventoryState-wide11/13/201710/1/2021, 86 FR 54377[.] Full approval.
[.]The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
2011 VOC, NOX and CO ozone summer season and annual emission inventory.New York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour serious ozone nonattainment area11/13/201710/1/2021, 86 FR 54377[.] Full approval.
[.]The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
2011 VOC, NOX and CO ozone summer season and annual emission inventory.Jamestown 8-hour marginal ozone nonattainment area11/13/201710/1/2021, 86 FR 54377[.] Full approval.
[.]The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
2008 8-hour Ozone Reasonable Further Progress Plan (RFP) for milestone year 2017; 2017 motor vehicle emission budgets used for planning purposesNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/13/201711/9/2023, 88 FR 77208[.] Full approval.
2008 8-hour Ozone Reasonable Further Progress Plan (RFP) for milestone year 2020; 2020 motor vehicle emission budgets used for planning purposesNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/29/202111/9/2023, 88 FR 77208[.] Full approval.
2008 8-hour Ozone Serious RACT Analysis and CertificationNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area1/29/202111/9/2023, 88 FR 77208[.] Full approval.
[.] Certifies New York has met the RACT requirements as it applies to non-CTG major sources of VOCs, all CTG sources of VOCs, and to major sources of NOX for the Serious 2008 8-hour Ozone New York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area.
2015 8-hour Ozone RACT Analysis and CertificationStatewide and to the New York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area1/29/202111/9/2023, 88 FR 77208[.] Full approval.
[.] Certifies New York has met the RACT requirements as it applies to non-CTG major sources of VOCs, all CTG sources of VOCs, and to major sources of NOX for the Moderate 2015 8-hour Ozone New York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area.
[.] Certifies New York's commitment to meet RACT statewide within the Ozone Transport Region (OTR) for the 2015 Ozone NAAQS.
2008 8-hour Ozone Serious Nonattainment New Source Review Requirements CertificationNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/29/202111/9/2023, 88 FR 77208[.] Full approval.
2008 8-hour Ozone Serious nonattainment emission inventoryNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/29/202111/9/2023, 88 FR 77208[.] Full approval.
2008 8-hour Ozone Clean Fuel for FleetsNew York portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/29/202111/9/2023, 88 FR 77208[.] Full approval.
Regional Haze Plan from 2018-2028State-wide05/12/202008/15/2024, 89 FR 66240. Full Approval. . New York has met the Regional Haze Rule requirements for the 2nd Implementation Period.

40 C.F.R. §52.1670

76 FR 41707 , July 15, 2011
81 FR 23169 , 4/20/2016; 81 FR 58854 , 9/26/2016; 81 FR 95049 , 1/26/2017; 82 FR 45500 , 10/30/2017; 83 FR 33 , 1/2/2018; 82 FR 57129 , 1/3/2018; 82 FR 58346 , 1/11/2018; 83 FR 6972 , 3/19/2018; 83 FR 42591 , 9/24/2018; 84 FR 12513 , 5/2/2019; 84 FR 22981 , 6/20/2019; 84 FR 38881 , 8/8/2019; 84 FR 54506 , 11/12/2019; 85 FR 28492 , 6/12/2020; 85 FR 44210 , 8/21/2020; 86 FR 43959 , 9/10/2021; 86 FR 49251 ,49253, 10/4/2021; 86 FR 54375 , 54377, 11/1/2021; 87 FR 33441 , 7/5/2022; 87 FR 52338 , 9/26/2022; 87 FR 56895 , 10/17/2022; 87 FR 59696 , 11/2/2022; 88 FR 8373 , 3/13/2023; 88 FR 36484 , 7/5/2023; 88 FR 77210 , 12/11/2023; 88 FR 89594 , 1/29/2024; 89 FR 42812 , 6/17/2024; 89 FR 66240 , 9/16/2024; 89 FR 76742 , 10/21/2024

For FEDERAL REGISTER citations affecting § ,52.1670 see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.