From Casetext: Smarter Legal Research

TWN of Monroe v. Underground Cons. Surv.

Connecticut Superior Court, Judicial District of Fairfield at Bridgeport
Apr 16, 2002
2002 Ct. Sup. 4585 (Conn. Super. Ct. 2002)

Opinion

No. CV01 038 47 54 S

April 16, 2002


MEMORANDUM OF DECISION RE: MOTION TO STRIKE (MOTION NO. 101)


Defendant Underground Construction Survey, Inc. moves to strike both counts of complaint filed by the plaintiff, Town of Monroe, on the ground that count one is barred by General Statutes § 52-576 and count two by General Statutes § 52-584. The town contends that its claims are saved by General Statutes § 52-577c. For the reasons set forth below, the motion to strike is denied.

The Town of Monroe seeks to recover compensation for losses it incurred as the result of an oil leak on its high school premises. The town commenced this action on July 12, 2001. In the first count of its complaint, the town alleges the following. On or about December 6, 1989, the town and Underground Construction entered into a written contract pursuant to which Underground Construction agreed to remove and replace an underground fuel storage tank and related piping at Masuk High School. On or about January 15, 1990, Underground Construction completed the work and was paid in full. On or about November 2, 1999, fuel oil was discovered on the grounds of Masuk High School, requiring costly and emergency reparative measures, including the removal of the oil tank, the removal of approximately 12,000 gallons of fuel from the fuel oil tank grave, and the removal of oil from the surrounding soil and septic system. A subsequent investigation revealed that the leak was caused by corroded pipes in the underground fuel oil return system, which pipes Underground Construction was to have replaced pursuant to the contract. The town asserts that the defendant breached the contract.

In the second count, the town alleges that Underground Construction was negligent in failing to replace all of the old underground piping with new piping as provided for in its agreement with the town and that Underground Construction knew or should have known that the old piping did not meet contemporary industry standards and, therefore, was likely to fail. The town also alleges that Underground Construction was negligent in failing to install a proper sleeve around the underground piping to prevent oil leaks in the event of a piping failure.

Underground Construction moves pursuant to Practice Book § 10-39 to strike each count on the ground the claims are time barred. "A claim that an action is barred by the lapse of the statute of limitations must be pleaded as a special defense, not raised by a motion to strike." Forbes v. Ballaro, 31 Conn. App. 235, 239, 624 A.2d 389 (1993); see also Practice Book § 10-50. When litigants agree that the complaint sets forth all the pertinent facts, a statute of limitations issue may be raised by a motion to strike. Forbes v. Balarro, supra, 31 Conn. App. 239-40. While Underground Construction claims that all the pertinent facts are alleged in the complaint, the town does not agree.

Underground Construction claims that the first count is barred by General Statutes § 52-576 and the second count by General Statutes § 52-584. The plaintiff, on the other hand, claims that General Statutes § 52-577c is the applicable statute of limitations. This latter statute allows an action "for personal injury or property damage caused by exposure to a hazardous substance or mixture or hazardous pollutant released into the environment" to be brought within two years of discovery of the injury. The plaintiff's claims are time barred unless § 52-577c is applicable.

General Statutes § 52-576 provides in relevant part: "(a) No action for an account, or any simple or implied contract, or on any contract in writing, shall be brought but within six years after the right of action accrues. . . ."

General Statutes § 52-584 provides in relevant part: "Limitation of action for injury to person or property. No action to recover damages for injury to the person, or to real or personal property, caused by negligence, or by reckless or wanton misconduct . . . shall be brought but within two years from the date when the injury is first sustained or discovered, and except that no such action may be brought more than three years from the date of the act or omission complained of. . . ."

General Statutes § 52-577c provides in relevant part: "(b) Notwithstanding the provisions of sections 52-577 and 52-577a, no action to recover damages for personal injury or property damage caused by exposure to a hazardous chemical substance or mixture or hazardous pollutant released into the environment shall be brought but within two years from the date when the injury or damage complained of is discovered or in the exercise of reasonable care should have been discovered."

"General Statutes § 52-577c . . . is the applicable statute of limitations for personal injury or property damages caused by exposure to a hazardous pollutant, "whether based on negligence or some other theory." Goldblum v. The Pittson Co., Superior Court, judicial district of Stamford-Norwalk at Stamford, Docket No. 126252 (April 24, 1996, Stevens, J.) ( 16 Conn.L.Rptr. 512); Millbrook Owner's Association v. Hamilton Std., Superior Court, judicial district of Hartford-New Britain at Hartford, Docket No. 556416 (June 11, 1996, Hennessy, J.) ( 17 Conn.L.Rptr. 178). The legislative history of § 52-577c indicates that the purpose of this statute "was to extend the statute of limitations for suits to recover damages caused by toxic waste pollution." Goldblum v. The Pittson Co., supra, 16 Conn.L.Rptr. 512."Blackburn v. Miller-Stephenson Chemical Co., Superior Court, Judicial District of Danbury, Docket No. 314089 (September 11, 1998, Leheny, J.) (holding § 52-577c governs negligence claims).

Contamination by a petroleum product was excluded from § 52-577c until 1998, when the legislature changed the definition of "hazardous substance." The definition now includes "petroleum" or "petroleum products." This change was procedural in light of the fact § 52-577c does not establish a right to sue for personal injury or property damage but merely extends the limitation period for claims where damage is caused by exposure to hazardous substances. The contamination in this case was discovered after the statute was amended.

The motion to strike is denied.

THIM, J.


Summaries of

TWN of Monroe v. Underground Cons. Surv.

Connecticut Superior Court, Judicial District of Fairfield at Bridgeport
Apr 16, 2002
2002 Ct. Sup. 4585 (Conn. Super. Ct. 2002)
Case details for

TWN of Monroe v. Underground Cons. Surv.

Case Details

Full title:TOWN OF MONROE v. UNDERGROUND CONSTRUCTION SURVEY, INC

Court:Connecticut Superior Court, Judicial District of Fairfield at Bridgeport

Date published: Apr 16, 2002

Citations

2002 Ct. Sup. 4585 (Conn. Super. Ct. 2002)
31 CLR 721