Opinion
No. 13923.
September 24, 1979. En Banc. Rehearing Denied November 6, 1979. Writ Refused January 11, 1980.
APPEAL FROM FIRST JUDICIAL DISTRICT COURT, PARISH OF CADDO, STATE OF LOUISIANA, HONORABLE JAMES E. CLARK, J.
Wilkinson, Carmody Peatross Caverlee by Samuel W. Caverlee, Shreveport, for Plaintiff-appellant.
Nelson Achee, Ltd. by Bobby S. Gilliam, Shreveport, for Barbara Jean Johnson Talley and The First Nat. Bank of Shreveport, Trustee for Brenda Hall.
R.J. Miciotto, Jr., Bossier City, curator ad hoc for Shirley Carol J. Huckabee.
Before PRICE, MARVIN and JONES, JJ.
The plaintiff utility appeals from a judgment denying it the privilege of expropriating a particular right of way across the landowner's property on a finding that the particular right of way sought by the utility would interfere more than is necessary with the convenience of the landowner. LRS 19:2(7); Louisiana Power Light Co. v. Caldwell, 360 So.2d 848 (La. 1978). We affirm for reasons assigned.
The ultimate issue requires our consideration of Caldwell and of our pre- Caldwell case, Claiborne Electric Cooperative, Inc. v. Garrett, 357 So.2d 1251 (La.App. 2d Cir. 1978), in which the Supreme Court denied writs after Caldwell, but before the Supreme Court denied rehearing in Caldwell. A determination of whether a violation of the statutory standard has occurred (an interference more than is necessary with the convenience of the landowner) must be made on the basis of the particular factual circumstances of each case.
In Caldwell, the Supreme Court considered that its opinion overturned an erroneous interpretation of LRS 19:2(7) by intermediate appellate courts and remanded the case for a full trial on the issue of violation of the statutory standard. The only facts mentioned by the Supreme Court revealed that the utility sought to expropriate 29 acres for a 100 foot right of way for a 230 KV electrical transmission line across the landowner's property comprised of woodlands, swamp lands, and lands under cultivation in Terrebonne Parish. The property was burdened with a pipeline servitude belonging to another, apparently running in the same direction as the proposed servitude for the electrical transmission line. The landowner requested that the electrical transmission line be located on or along the gas line servitude. Among other factors, the Supreme Court noted that the utility's expert witness estimated this routing would be one-half to one mile longer than the proposed right of way, but that the expert failed to estimate or compare the dollar amounts necessary for the construction of each route.
In Garrett, this court considered the statutory standard, and held that since the utility offered minimal evidence to show it had considered the inconvenience to the landowner, and since the landowner offered no expert testimony to show major inconvenience, the utility's selection of a route would not be disturbed. There the utility sought a 100 foot right of way for a 69 KV line across properties best suited for growing timber and for rural homesites. It was shown that an alternate route was considered, but rejected by the utility.
Here the utility proposes to connect its Shreveport substations at Hart's Island and at South Shreveport (near Linwood Avenue and the Inner Loop Parkway) with a 138 KV transmission line. Public necessity is not questioned. This map depicts the proposal and the relative location of the landowner's property traversed by Idema Street.
In 1974 the landowner granted a 30 foot servitude along the north side of Idema Street to the utility on which it maintains a 69 KV transmission line. The landowner contends that the proposed 138 KV line and the 69 KV line should be constructed on one servitude, either north or south of Idema Street, of whatever width is necessary to accommodate the facility, but not along both sides of the street. The landowner has no objection to one servitude being temporarily used while the permanent line or lines are being constructed.
The utility contends that the mere urging of inconvenience, without proof to outweigh its proof of specific engineering and economic reasons for its choice of location of the 138 KV line along the south side of Idema is not a legally sufficient basis for the judgment below and that the trial court erred in weighing these factors and in finding more interference than was necessary. The utility further contends that the trial court erred in its interpretation and application of Caldwell, acknowledging, however, that Caldwell requires a determination from evidence that the expropriation of property by an electric utility does not interfere more than is necessary with the convenience of the landowners.
LRS 19:2 reads in part: "When a price cannot be agreed upon with the owner, any of the following may expropriate needed property: * * * "(7) Any domestic or foreign corporation created for the purpose of . . . transmitting . . . electricity . . . The . . . transmission lines . . . for which property was expropriated shall be so located [and] constructed . . . as not to . . . interfere . . . more than is necessary, with the convenience of the landowner. * * *"
Expropriation laws are in derogation of common right and are strictly construed. Louisiana Power and Light Company v. City of Houma, 229 So.2d 202 (La.App. 1st Cir. (1969) writ refused. The burden of proving a statutory condition or prerequisite for expropriation is on the expropriator. Texas Gas Transmission Corporation v. Soileau, 251 So.2d 104 (La.App. 3rd Cir. 1971), writ refused. We hold that the burden of showing that the location of the transmission line servitude interferes no more than is necessary with the landowner is upon the expropriator. See Caldwell, supra.
We interpret the trial court's reasons for judgment as a finding that the utility did not meet its burden of proving that it selected the particular route on a consideration that the location south of the road did not interfere more than is necessary with the convenience of the landowner. The trial court said:
"I found nothing during the testimony which clearly indicated to me in specific words that plaintiff had in fact considered the selection of a route which would cause the least interference with the convenience of the landowner."
The use of the term least interference is not ill chosen in view of the trial court's observation that there is some interference with the landowner's convenience in any expropriation of property for a transmission line. Some [reasonable] interference obviously is permissible, while more than necessary [or unreasonable] interference is not. An exercise in semantics at this juncture, however, would accomplish nothing because each case will present its own peculiar circumstances.
The utility considered a route north of Idema and the selected route south of Idema. The southern route was selected because it also would be located upon an existing drainage servitude owned by the State. Cost, continuity of service, and safety and engineering factors favor the southern route, according to the utility. The utility showed that it would cost approximately $200,000 to double circuit a line along the existing northern servitude with steel poles capable of supporting the two lines as opposed to a cost of approximately $100,000 to construct a single circuit on wood poles south of Idema. The several factors mentioned by the utility experts (engineering, costs, safety, continuity of service), while pertinent, did not expressly include consideration of the comparative interference with the convenience of the landowner which would result from either one dual line or two lines on one side of the street as opposed to having a line on each side of the street or which would result from the line being placed elsewhere on defendant's property. We cannot say the trial court erred in its finding that the utility made its selection of a route without making the consideration required by the statute. Until it is shown that this consideration was made in the selection of the location of a proposed transmission line, as a prerequisite or a condition of expropriation, courts should not become concerned with a balancing or weighing of the factors which establish or negate that the proposed location interferes more than is necessary with the convenience of the landowner.
The burden is on the electric utility to show that it made this determination in compliance with the statute before expropriation is formally sought.
At appellant's cost, judgment is AFFIRMED.
PRICE, J., dissents with written reasons.
I must respectfully dissent from the majority view. The Supreme Court in Caldwell interpreted La.R.S. 9:2(7) to mandate that utility companies which seek to expropriate servitudes for electric power lines must give reasonable consideration to the convenience of the landowner in the selection of the route to be taken. Plaintiff in this case has clearly done so.
In Caldwell the landowner requested that the utility company locate its transmission lines along a preexisting pipe-line servitude rather than creating a new servitude. The Supreme Court found that since the utility company had made no in-depth study of the feasibility of this alternative route and had made no estimation of its relative costs, it had therefore failed to show that the statutorily required consideration for the landowner's convenience had been taken into account in choosing the route it sought to expropriate.
In the present case, defendants' only request was that plaintiff locate this new transmission line along the preexisting servitude on the north side of Idema Street rather than placing a separate line along the south side of the street. Plaintiff showed that it did in fact study and consider this alternative among others but found it impractical for the following reasons:
(1) Although there is sufficient room on the existing right-of-way to accommodate two separate lines, this double circuiting would require replacement of the wooden poles and structures with steel ones at a cost of $1000,000 more than the cost of erecting a new line on wooden poles on the south side of the street.
(2) The existing line, which serves another part of south Shreveport would have to be taken out of service during the replacement of the poles.
(3) Placing two separate transmission lines on single poles substantially increases the risk of power loss due to accident, i. e., damage to a single pole from an automobile accident or high winds would cut off power to two areas of the city rather than one.
It is apparent that plaintiff has afforded defendants' request substantial analysis and consideration of the type the court found notably lacking in Caldwell. While it may be true that plaintiff has failed to show the route it seeks to expropriate is the least inconvenient to the landowners, it has shown that due to the impracticability of the alternative suggested by defendants, the additional interference with their enjoyment of the property is necessary under circumstances at hand. Therefore, I would reverse the judgment and remand to the trial court for further proceedings.