From Casetext: Smarter Legal Research

Lindemann Props., Ltd. v. Campbell

COURT OF APPEALS SECOND DISTRICT OF TEXAS FORT WORTH
Dec 8, 2016
NO. 02-15-00392-CV (Tex. App. Dec. 8, 2016)

Opinion

NO. 02-15-00392-CV

12-08-2016

LINDEMANN PROPERTIES, LTD. APPELLANT v. WARD A. CAMPBELL APPELLEE


FROM THE 97TH DISTRICT COURT OF ARCHER COUNTY
TRIAL COURT NO. 2013-0050A-CV

OPINION

I. INTRODUCTION

Appellant Lindemann Properties, Ltd. sued Appellee Ward A. Campbell for a declaration that Campbell's radio-transmission tower easement terminated when he removed the original tower and replaced it with a new one. The trial court ultimately signed a take-nothing judgment in favor Campbell, concluding that the easement had not terminated, and awarded him attorney's fees. In what we construe as three issues, Lindemann challenges the trial court's findings and conclusions regarding the easement, the denial of its related request for injunctive relief, and the award of attorney's fees. We will affirm in part and reverse and remand in part.

II. BACKGROUND

On March 7, 1977, Howell E. Smith d/b/a Muleshoe Cattle Company granted, sold, and conveyed to Campbell's father, A.O. Campbell, Jr., "an easement or right for the installation of a radio-transmission tower, consisting of the tower itself and guy wires as necessary to support the same." The easement expressly granted the following rights:

Together with the right of ingress and egress over my adjacent lands to or from said easement for the purpose of inspecting, maintaining, constructing and removing said radio transmission tower and appurtenances.

TO HAVE AND TO HOLD the above described easement and rights unto the said A.O. Campbell, Jr., his successors and assigns, perpetually, until said radio transmission tower shall be abandoned and/or removed.

The easement did not specify the tower's height or size, but it stated the following regarding its location:

Said radio transmission tower will be located on a tract 500 feet by 500 feet, the center of which to be determined by the actual
location when installed on the following tract of land located in the County of Archer, State of Texas, to-wit:

Situated on Lot No. One (1), Block No. Seventy-five (75) ATNC Subdivision, Archer County, Texas.

Grantor recognizes that the general location as above described is based on a preliminary survey only and hereby agrees the easement hereby granted shall apply to the actual location of said radio transmission tower when located.

The original tower was built in 1977 on the Archer County property referenced in the easement (the "Property"). It measured 400 feet tall and 18 inches wide, it used 1.5 gauge tubing and multiple guy wires, and it was serviced by a small building located directly adjacent to its base. A pipe fence was constructed to enclose the 500' x 500' easement tract.

Lindemann, a family limited partnership formed in 2009, owns the Property on which the easement is located. The Property was burdened by the easement when the Lindemann family acquired it in 1983.

When the original tower was completed, Campbell's father's company, Haigood and Campbell, used it to facilitate two-way radio transmissions between a fleet of vehicles. Over the ensuing years, Haigood and Campbell allowed a number of tenants to mount "a dish or an antenna or something" on the tower for their own broadcast purposes, including the Archer County Sheriff's Department, the Archer County Volunteer Fire Department, Jenson Well Service, Bridwell Oil Company, Burns Operating, Motorola Communications, and SkyBeam Texas. Some paid rent; some did not.

Campbell, a successor-in-interest under the easement contract, became responsible for the original tower in 1990. Although he had it painted, its light bulbs changed, and its guy wires inspected and tightened, he never had a structural analysis of the tower performed, including before several of the tenants began using it.

In early November 2011, Campbell was contacted by Chris Mayo at Site Property Company (SPC), a broker who was working on behalf of LKCM Radio Group, L.P. to find a location for LKCM's broadcasting equipment. After some initial communications about the tower and LKCM's requirements, SPC hired an engineer to perform a structural analysis of the tower to determine whether it could support the additional proposed loading. The results indicated that it would not; the tower was overloaded and in "terrible" condition. SPC then requested a structural report for the existing loads on the tower, hoping to use it to negotiate favorable terms for a potential "drop & swap," a procedure in which an existing tower is removed and replaced with "an equivalent tower as far as configuration and height but meeting current standards." The report indicated that the tower was not in compliance with the International Building Code; noted that "during the field mapping, the tower mast was observed to be visually 'snaking' with significant frame bending around each guy pull-off level above elev. 200ft"; and recommended that the tower be replaced "since the strengthening modifications required [were] too extensive and not feasible."

Campbell did not remedy any of the tower's structural issues after obtaining the engineering report, and it continued in operation. However, soon thereafter, in early 2012, Campbell began soliciting bids for the construction of a new tower and negotiating a lease with LKCM to install its broadcasting equipment on the new tower. In April 2012, Campbell and LKCM entered into a lease agreement involving a new tower, and in June 2012, Campbell accepted a quote for the construction of a new tower.

LKCM's engineers consulted on the design of the new tower. Campbell agreed that construction on the new tower would not have begun until LKCM's engineers approved its design.

Construction on the new tower began in October 2012 and concluded on or about November 8, 2012. The new tower stands 420 feet tall, measures 36 inches wide at its widest point, uses 2.5 gauge tubing, and is located within the same pipe fence that was originally constructed to enclose the easement tract. Whereas the original tower used six guy-wire anchors, the new tower uses only three, and the wires are located closer to the tower's base. As was the original tower, the new tower is serviced by a small building located directly adjacent to its base.

The original tower remained in place and in operation while the new tower was being constructed. Thus, although the new tower is located within the same pipe fence as the original tower, it is not located in the exact same location as the original tower. The following image shows the location of the new tower (on the right) in relation to where the original tower stood (on the left):

Image materials not available for display.

Campbell hired Gordon Parkey to construct the new tower and to remove the original tower. According to Parkey, the new tower "went live" on November 14, 2012. Around the same time, Parkey also told Tim Lindemann, Lindemann's representative, that a single antenna continued to operate on the original tower and that he would not transfer it to the new tower until he returned from performing another job and taking a trip to Colorado. Parkey's absence consequently "drug the time frame out of how long" both towers stood—and apparently operated—simultaneously. Parkey deconstructed and removed the original tower sometime in December 2012.

Lindemann sued Campbell in April 2013 and sought a declaration that the easement had terminated, a permanent mandatory injunction ordering Campbell to remove the new tower and all appurtenances thereto, and attorney's fees. During the bench trial that ensued, Tim Lindemann testified that the easement had terminated because Campbell had built a new tower, abandoned the original tower, removed the original tower, and simultaneously used both the original and new towers. Campbell agreed that the easement provides for the installation of a single radio-transmission tower, but he opined that his right to maintain the tower allowed him to remove the original tower and to construct the new one. The trial court sided with Campbell. It signed a final judgment that Lindemann take nothing on its claims and awarded Campbell attorney's fees through trial in the amount of $56,106.19 and conditional appellate attorney's fees. The trial court entered the following findings of fact, among others:

13. The Original Tower remained standing until it was replaced and removed in 2012 due to evidence of structural instability.
. . . .

16. Replacement of the Original Tower was necessary to maintain a functional tower in the Tract.

17. The Original Tower was removed after it was replaced by the New Tower.

18. The Original Tower was removed as soon as was practicable after all transmission equipment was relocated to the New Tower.

19. The Original Tower was removed only after it was no longer transmitting.

20. The New Tower does not increase the burden on the surface estate.

21. The New Tower does not exceed the scope of the Easement.

22. The building of the New Tower does not effect a termination of the Easement.

23. No actions of [Campbell] in connection with the maintenance of the Easement effected a termination of the Easement.

24. The Easement has not terminated and is still in existence.
The trial court entered the following conclusions of law, among others:
7. The New Tower does not increase the burden on the surface estate.

8. The New Tower does not exceed the scope of the Easement.
9. The building of the New Tower does not effect a termination of the Easement.

. . . .

11. [Campbell's] right to maintain included his right to replace the Original Tower with the New Tower.

12. The removal of the Original Tower after replacement with the New Tower does not effect a termination of the Easement.

13. The Original Tower was not abandoned; it was replaced.

14. No actions of Campbell in connection with the maintenance of the Easement effected a termination of the Easement.

15. The Easement has not terminated and is still in existence.

III. EASEMENT TERMINATION

Lindemann argues in its first issue that the easement automatically terminated when Campbell either removed or abandoned the original tower. It contends that the plain terms of the easement authorized the placement of only a single radio-transmission tower on the Property, that the parties to the easement objectively intended that it would terminate upon the original tower's removal or abandonment, and that the evidence conclusively demonstrates that Campbell removed or abandoned the original tower. Lindemann also disputes the trial court's decision to construe the term "maintaining," as it is used in the easement, to include the right to remove the original tower and to replace it with a new one. Alternatively, Lindemann contends that the easement terminated because Campbell improperly exceeded its scope.

Campbell responds that the right to maintain the original tower includes the right to replace it when necessary and that the new tower did not exceed the easement's scope.

A. Standards of Review

A trial court's findings of fact have the same force and dignity as a jury's answers to jury questions and are reviewable for legal and factual sufficiency of the evidence to support them by the same standards. Catalina v. Blasdel, 881 S.W.2d 295, 297 (Tex. 1994); Anderson v. City of Seven Points, 806 S.W.2d 791, 794 (Tex. 1991); see also MBM Fin. Corp. v. Woodlands Operating Co., 292 S.W.3d 660, 663 n.3 (Tex. 2009). We may sustain a legal sufficiency challenge only when (1) the record discloses a complete absence of evidence of a vital fact, (2) the court is barred by rules of law or of evidence from giving weight to the only evidence offered to prove a vital fact, (3) the evidence offered to prove a vital fact is no more than a mere scintilla, or (4) the evidence establishes conclusively the opposite of a vital fact. Ford Motor Co. v. Castillo, 444 S.W.3d 616, 620 (Tex. 2014); Uniroyal Goodrich Tire Co. v. Martinez, 977 S.W.2d 328, 334 (Tex. 1998), cert. denied, 526 U.S. 1040 (1999). When reviewing an assertion that the evidence is factually insufficient to support a finding, we set aside the finding only if, after considering and weighing all of the evidence in the record pertinent to that finding, we determine that the credible evidence supporting the finding is so weak, or so contrary to the overwhelming weight of all the evidence, that the answer should be set aside and a new trial ordered. Pool v. Ford Motor Co., 715 S.W.2d 629, 635 (Tex. 1986) (op. on reh'g); Cain v. Bain, 709 S.W.2d 175, 176 (Tex. 1986); Garza v. Alviar, 395 S.W.2d 821, 823 (Tex. 1965). We defer to unchallenged findings of fact that are supported by some evidence. Tenaska Energy, Inc. v. Ponderosa Pine Energy, LLC, 437 S.W.3d 518, 523 (Tex. 2014).

We may review conclusions of law to determine their correctness based upon the facts, but we will not reverse because of an erroneous conclusion if the trial court rendered the proper judgment. City of Austin v. Whittington, 384 S.W.3d 766, 779 n.10 (Tex. 2012) (citing BMC Software Belgium, N.V. v. Marchand, 83 S.W.3d 789, 794 (Tex. 2002)); H.E.B., L.L.C. v. Ardinger, 369 S.W.3d 496, 513 (Tex. App.—Fort Worth 2012, no pet.).

B. Express Easements and Construction

An easement is a nonpossessory interest that authorizes a holder's use of property for only a particular purpose. Marcus Cable Assocs., L.P. v. Krohn, 90 S.W.3d 697, 700 (Tex. 2002). The easement holder's rights are limited to those that are expressed in the grant. DeWitt Cty. Elec. Coop., Inc. v. Parks, 1 S.W.3d 96, 103 (Tex. 1999). It follows that we apply basic principles of contract construction and interpretation when considering an express easement's terms. Marcus Cable, 90 S.W.3d at 700. We give the terms their plain and ordinary meaning when they are not expressly defined, and we read the terms of an easement as a whole to determine the parties' intentions and to carry out the purpose for which the easement was created. Id. at 701; DeWitt Cty. Elec. Coop., 1 S.W.3d at 101. We assume that the parties intended for every clause to have some effect. Koelsch v. Indus. Gas Supply Corp., 132 S.W.3d 494, 498 (Tex. App.—Houston [1st Dist.] 2004, pet. denied).

C. "Maintaining" Includes Replacement When Necessary

If the facts of this case were that Campbell had removed the original tower and done nothing else, then Lindemann's simple argument that the easement terminated pursuant to the habendum clause would control the outcome. But the facts are not that clear-cut, nor is the analysis. Not only did Campbell remove the original tower, he also constructed a replacement tower within the same fenced area that encloses the easement tract. The question then is whether the easement afforded Campbell the right to replace the original tower with the new tower. See DeWitt Cty. Elec. Coop., 1 S.W.3d at 103. The easement is certainly succinctly worded, but it expressly grants the holder the right to "maintain[]" the radio-transmission tower. We are not the first court to consider whether the term "maintain," as used in an easement contract, may include the right to replace.

In Houston Pipe Line Co. v. Dwyer, Dwyer sought a declaration that a pipeline easement across her land had terminated because Houston Pipe Line had removed an eighteen-inch low pressure pipeline and replaced it with a thirty-inch high pressure pipeline. 374 S.W.2d 662, 663 (Tex. 1964). The easement's granting clause originally gave the easement holder the right "to lay, maintain, operate, repair and remove a Pipe Line for the transportation of gas," but the words "and remove" were struck, although a different part of the instrument authorized removal upon termination of the easement. Id. Dwyer argued that as changed, the easement "authorized the construction, maintenance, operation and repair of one pipeline only, and did not authorize its replacement or removal except upon termination of the easement as provided in the habendum clause." Id. at 664. Houston Pipe Line countered that even after deleting the term "and remove," the remaining terms were "consistent with the right to remove and replace the original pipe when conditions make it necessary." Id. The supreme court agreed with Houston Pipe Line, reasoning in part,

If plaintiffs are correct in their contention, then defendant's rights and easement under the 1926 agreement would terminate simply by removing and replacing the original pipe, regardless of its condition, with pipe of any size. The agreement in question does not compel such an unreasonable result. We hold that the terms 'operate' and 'maintain' in the granting clause are at least broad enough to include the right to remove and replace the original pipe with pipe of the same size when necessary.
Id. (emphases added). The supreme court thus held that if the condition of a pipeline easement is such that in order to maintain it, replacement is necessary, then the term "maintain," as expressly used in the easement, was broad enough to include removal and replacement.

Lindemann's arguments are indistinguishable from Dwyer's. Like the supreme court, we decline to unreasonably construe the term "maintain[]" without any regard for the condition of the easement. We therefore review the evidence to determine whether the condition of the original tower rendered its removal and replacement necessary. See id.

The original tower was approximately thirty-five years old and in very poor condition when it was removed and replaced. Further, although the structural analysis that SPC had an engineer perform in December 2011 was not for the specific purpose of assessing the original tower's condition, the tests nonetheless revealed that it had numerous structural issues, including snaking of the mast and frame bending around the guy wires. Indeed, the original tower was designated a "Class II" tower, but it could not even pass the test for a "Class I" tower without some manipulation of the data. The engineer recommended that the original tower be replaced:

A structural Class II "translates back to a 50-year recurrence on the environmental loading criteria, which is the wind and so on," while a structural Class I "translates to a 25-year wind return period."

Q. Based on your analysis, correct me if I'm wrong, but you do not find any way in which the tower that you did the analysis on could be beefed up, fixed to where it wouldn't -- where you didn't have these failures, correct?
A. We stated such.

Q. Okay. So in your professional opinion, the only appropriate remedy for this tower was a replacement?

A. Correct.

Citing public policy that a wrongdoer should not benefit from his wrongdoing, Lindemann argues that the evidence is conclusive that Campbell failed to inspect and maintain the structural integrity of the original tower and, therefore, that his own "misconduct" did not create a necessity warranting removal and replacement of the original tower. The public policy on which Lindemann relies is completely inapposite because there is no evidence that Campbell intentionally, illegally, or fraudulently overloaded the original tower for the purpose of creating a necessity to justify its removal and replacement. See Kulubis v. Tex. Farm Bureau Underwriters Ins. Co., 706 S.W.2d 953, 954-55 (Tex. 1986) (disavowing rule that illegal or fraudulent acts by one co-insured prevented recovery under insurance policy by the other co-insured). Campbell acknowledged that he did not have the original tower inspected, but he also testified that he performed some maintenance of the original tower (by having it painted, its light bulbs changed, and its guy wires tightened); that he was never made aware of anything regarding the original tower's condition that caused him any concern; and that after receiving the engineering report in December 2011, he "moved as fast as [he] could move" to address the issues that it raised. In light of this and the entire record, we cannot agree that Campbell's behavior over the years warrants application of the above policy.

Lindemann also argues that by implying the right to replace the original tower into the meaning of "maintaining" and then authorizing the original tower to be removed if it was being replaced, the trial court "rendered the plain and unqualified meaning of both of the terminating events meaningless" and "effectively rewrote the habendum clause to add an exception or limitation." The trial court's construction did neither. "When provisions in an agreement appear to be in conflict, the court should examine and consider the entire writing, seeking to harmonize and reconcile the conflicting provisions to the greatest extent possible." Derr Constr. Co. v. City of Hous., 846 S.W.2d 854, 862 (Tex. App.—Houston [14th Dist.] 1992, no writ). If the tower is removed and replaced—because to maintain the tower, its condition rendered removal and replacement necessary—the terminating clause is simply not triggered because the easement holder merely exercised his rights to remove and maintain the tower as expressly granted by the ingress-egress clause. However, if the tower is removed and not replaced, or removed and replaced when it was not necessary to maintain the tower, then the habendum clause is triggered. The easement's terms are thus reconcilable, and the terminating events continue to have meaning, even without the purported improper addition of any language thereto.

Lindemann further contends that the plain meaning of "replace"—"to take the place of esp. as a substitute or successor"—contradicts the plain meaning of "maintain"—"to keep in an existing state (as of repair, efficiency, or validity)." It argues that while the easement holder may maintain the tower by replacing its parts, "'maintaining' cannot mean intentionally removing and replacing the entire Original Tower because it would be the opposite of preserving the existing condition of the Original Tower." [Emphasis added.] Lindemann disregards a well-established standard for construing easements—one that the supreme court expressly evoked in Dwyer. An easement "carries with it the right to do such things as are reasonably necessary for the full enjoyment of the easement," Cent. Power & Light Co. v. Holloway, 431 S.W.2d 436, 439 (Tex. Civ. App.—Corpus Christi 1968, no writ) (emphasis added), although it cannot be forgotten that the rights reasonably necessary for full enjoyment "do not encompass rights foreign to the purpose for which the easement is granted." State v. Brownlow, 319 S.W.3d 649, 656 (Tex. 2010). As explained, the supreme court in Dwyer concluded that it would be unreasonable not to consider the condition of the pipeline when determining whether the term "maintain," which was expressly included in the easement, was broad enough to include removal and replacement. 374 S.W.2d at 664. The supreme court did so because, simply enough, a pipeline may be in such a condition that replacement is necessary to maintain it. The same holds true for the radio-transmission tower here. Construing the term "maintaining" to allow replacement of only parts of the tower, but not the entire tower when necessary, is unreasonable and could effectively preclude Campbell from fully enjoying the easement.

Finally, Lindemann seeks to factually distinguish Dwyer by arguing that unlike the easement in this case, the easement there "did not expressly state that [it] would terminate upon removal of the pipeline"; "[t]he Dwyer court simply would not have implied a right to remove and replace had the agreement expressly said that removal would terminate the easement." This is pure speculation. Moreover, as explained, we can reconcile the ingress-egress and habendum removal provisions without rendering one meaningless.

We conclude and hold that the term "maintaining," as used in the easement, is broad enough to include the right to replace the tower when necessary; that the evidence is both legally and factually sufficient to show that the original tower's replacement was necessary; and that the easement did not terminate when Campbell removed the original tower and replaced it with the new tower. See id.; see also Marcus Cable, 90 S.W.3d at 700. The evidence is therefore legally and factually sufficient to support the trial court's findings of fact 13, 16, 22, 23, and 24, and conclusions of law 9, 11, 12, 13, and 14 are not erroneous. See Ford Motor Co., 444 S.W.3d at 620; Pool, 715 S.W.2d at 635. We overrule this part of Lindemann's first issue.

D. Scope of Easement

In the other part of what we construe as its first issue, Lindemann argues that even if Campbell had the right to replace the original tower, the easement nevertheless terminated because Campbell exceeded its scope by moving the location of the new tower, by constructing a substantially larger new tower, and by operating both towers simultaneously. Lindemann finds its support in the second half of Dwyer's analysis, in which the supreme court considered whether Houston Pipe Line could replace the original eighteen-inch pipeline with a substantially larger thirty-inch pipeline. See 374 S.W.2d at 664-66. The supreme court reasoned that because the easement contained no limitation on the size of the pipeline, "when [Houston Pipe Line] constructed its 18-inch pipeline with the consent and acquiescence of [Dwyer], the extent of [Houston Pipe Line's] easement rights under the 1926 agreement became fixed and certain." Id. at 666. Consequently, Houston Pipe Line "was not authorized to remove th[e] 18-inch line initially constructed and replace it with a line of substantially greater size." Id. Lindemann employs the same rationale here—the easement did not specify the height, the size, or the precise location of the radio-transmission tower, so when Campbell's predecessor constructed the original tower, those terms became fixed, and when Campbell constructed the new tower, which deviated from those fixed terms, he improperly exceeded the easement's scope. Assuming that the easement's height, size, and location became fixed when the original tower was constructed, we cannot agree that Campbell exceeded the easement's scope.

Regarding the size of the new tower, the proper inquiry is whether it is of a "substantially greater size" than the original tower. See id. at 665-66 (using the description "substantially greater size" twice). The original tower stood 400 feet tall. The new tower stands 420 feet tall. The 20-foot difference represents a 5% increase in height. In Dwyer, the thirty-inch pipeline represented a 66% increase in width over the 18-inch pipeline. The 5% height increase is undoubtedly insubstantial. Lindemann points out that the new tower is twice as wide (thirty-six inches compared to eighteen inches) and uses larger tubing (2.5 gauge compared to 1.5 gauge) than the original tower—respectively, a 100% and 66% increase in those sizes. But those figures should be attributed much less weight and significance than the height difference because like the width of the pipeline in Dwyer, which directly corresponded to its primary function—the amount of gas that the pipeline was capable of transporting—the height of the radio-transmission tower directly corresponds to the ability of its appurtenances to successfully broadcast their signals—the new tower's primary function. All that considered, the new tower is not substantially larger than the original tower. In fact, mathematics and primary purpose aside, the naked eye alone is fully capable of arriving at the very same conclusion:

Image materials not available for display.

Under the easement, the location of the original tower fixed the center point for determining the location of the 500' x 500' easement tract. Lindemann argues that by constructing the new tower eighteen feet from the original tower's location, Campbell changed the center point of the 500' x 500' easement tract and, therefore, the location of the entire easement. Lindemann contends that Campbell should have first removed the original tower and then constructed the new tower in the exact same location. Lindemann is concerned that if Campbell was not required to construct the new tower in the exact same location as the original tower, then he could "continually erect 'replacement' towers in new locations, every one of which will change the location of the easement."

In Harris v. Phillips Pipe Line Co., the court of appeals agreed with the trial court that Phillips had acted within the terms of its easement when it replaced and relocated a pipeline parallel to and fifteen feet away from its original location. 517 S.W.2d 361, 363-65 (Tex. Civ. App.—Austin 1974, writ ref'd n.r.e.). Phillips relocated the new pipeline because construction would have been hazardous at any less distance from the old pipeline, which remained in operation during the construction of the new pipeline. Id. at 363. The evidence showed that if Phillips had shut down the old pipeline, it would have been required to shut down its refinery, twenty gasoline plants, and more than 200 gas wells that supplied the plants. Id. In light of those facts, the court of appeals reasoned that "[t]o require Phillips to cease use of the pipe line in order to replace it with a new line would deny Phillips a right expressly given by the grant, the right to use, maintain, and operate the pipe line." Id. at 364-65.

Campbell proceeded just like Phillips did with its easement in Harris. Constructing the new tower less than twenty feet from the original tower allowed Campbell's tenants to continue to broadcast uninterrupted during the new tower's construction. Although permitting the original tower to continue to operate while the new tower was being constructed did not avoid a three-month shut down of numerous gasoline plants and gas wells, it did involve a potentially more important purpose: the safety and welfare of the residents of Archer County. Both the Archer County Sheriff's Department and the Archer County Volunteer Fire Department utilized the original tower for radio communications. There can be no doubt that requiring Campbell to remove the original tower so that the new tower could be constructed in the exact same location would have required these public-service entities to find an alternative broadcast location for at least some period of time. The potential disruption in these vital services is more than enough reason to justify locating the new tower less than twenty feet away from the original tower—but still within the same 500' x 500' fenced easement tract—so that these tenants could continue to broadcast uninterrupted during the new tower's construction. Campbell's attorney made this important point during his cross-examination of Tim Lindemann:

Tim Lindemann agreed that it was not physically possible to build the new tower in the exact same location of the original tower while the original tower was still standing.

Q. Do you believe that the Archer County Sheriff's Department and the Archer County Volunteer Fire Department's ability to transmit is important for public safety?

A. Yes.
Q. And would you agree with me that that is of such importance that it could be a factor in the method and manner in which you handle those two transmission attempts, correct?

A. Be more specific. Am I handling the antennas now?

Q. Let me back up. With that importance to public safety, it would be a very significant important factor in the way that a person, a reasonable person would handle those two antennas when dealing with this tower, correct?

A. I'm sorry. I still don't understand what you're asking.

Q. I think my point is made.

We do not share Lindemann's concern about Campbell continually erecting replacement towers in new locations, moving the easement tract here and there and to and fro. Campbell located the new tower within the same 500' x 500' fenced easement tract in which the original tower was located. Given his actions, if Campbell were somehow inclined to replace the new tower with an even newer tower, it is just as likely, if not more likely, that he would construct it where the original tower was located—still within the 500' x 500' fenced tract—rather than in some other random location. After all, the evidence showed that the easement tract is located on a hilltop, an ideal spot to operate a radio-transmission tower.

As for Lindemann's contention that Campbell exceeded the easement's scope by operating both towers simultaneously, the evidence showed that the lone antenna that remained operating on the original tower during Parkey's absence from the jobsite belonged to "one of the Archer County services tenants." Our reasoning immediately above is therefore equally applicable here. The uninterrupted operation of the public-service entities' radio transmissions justified the relatively brief but simultaneous operation of both towers.

The easement did not terminate because Campbell did not exceed its scope. The evidence is legally and factually sufficient to support the trial court's findings of fact 21 and 24, and conclusions of law 8 and 15 are not erroneous. See Ford Motor Co., 444 S.W.3d at 620; Pool, 715 S.W.2d at 635. We overrule the remainder of Lindemann's first issue.

E. Response to the Dissent

Each of the dissent's three primary arguments can be traced back to a faulty reading of Dwyer. Relying on the easement's terms "a" and "said," the dissent first contends that the only reasonable construction of the easement is that it permitted the placement of one radio transmission only—the tower that was built in 1977. The supreme court rejected the very same argument over fifty years ago when it construed a pipeline easement that permitted the installation of only "a" pipeline but that also granted its holder the right to "maintain" and to "operate" the pipeline—much like the easement here. See Dwyer, 374 S.W.2d at 664 ("[Respondents] contend that the agreement . . . authorized the construction, maintenance, operation and repair of one pipeline only, and did not authorize its replacement or removal except upon termination of the easement as provided in the habendum clause." (emphasis added)). The supreme court held that it would be unreasonable to simply conclude—just like the dissent does here—that the easement terminated upon the pipeline's removal and replacement without additionally considering whether the pipeline was in such a condition that its removal and replacement was necessary to "maintain" it. Id. at 664. Thus, the only reasonable construction of the easement is the majority's, not the dissent's. See Plains Expl. & Prod. Co. v. Torch Energy Advisors Inc., 473 S.W.3d 296, 305 (Tex. 2015) ("We 'construe contracts from a utilitarian standpoint bearing in mind the particular business activity sought to be served,' and avoiding unreasonable constructions when possible and proper.").

The dissent next argues that our construction of the easement "eviscerates the habendum clause and its specific language making the Easement determinable and rewrites the Easement to make it perpetual," but as we already explained, the habendum clause's termination provision continues to have meaning when the tower is removed and not replaced or when the tower is removed and replaced when it was not necessary to maintain the tower.

Finally, the dissent contends that insofar as Dwyer "may be construed as authorizing replacement under the guise of maintenance," it held that the object to be removed must be replaced with another object of the "same size." The supreme court certainly used the phrase "same size" once, see id. at 664, but in the actual analysis of respondents' argument that the petitioner had exceeded the scope of the easement by replacing the eighteen-inch pipeline with a thirty-inch pipeline, the supreme court used the description "substantially greater size" twice. See id. at 665, 666. Further, the supreme court did not hold that "the easement terminated because the petitioner failed to replace the eighteen-inch pipeline with a pipeline of the same size." Rather, it held that the petitioner "was not authorized to remove this 18-inch line initially constructed and replace it with a line of substantially greater size," expressly referencing the standard that it mentioned earlier in its analysis of the same subissue, not the standard that it mentioned when considering whether the easement's terms were broad enough to include removal and replacement. Compare id. at 664 with id. at 666. Contrary to the dissent's accusation that we are "contraven[ing] established law," we are simply trying to follow and apply our high court's precedent. See, e.g., Orange Cty., Inc. v. Citgo Pipeline Co., 934 S.W.2d 472, 476 (Tex. App.—Beaumont 1996, writ denied) (construing Dwyer to hold that "where the easement did not provide for the size of the pipe under the easement that the size became fixed when the pipeline was constructed and could not thereafter be replaced with a substantially larger pipe").

IV. INJUNCTIVE RELIEF

In its second issue, Lindemann argues that because the trial court erred in concluding that the easement did not terminate, it also abused its discretion by failing to grant Lindemann's request for permanent injunctive relief. Because Lindemann's first issue challenging the trial court's findings and conclusions regarding the easement's termination was unpersuasive, this contingent issue seeking injunctive relief is also unpersuasive. We overrule Lindemann's second issue.

V. ATTORNEY'S FEES

Lindemann's third and final issue challenges the trial court's award of attorney's fees to Campbell. Lindemann first contends that reversal is required because it was entitled to judgment on its declaratory-judgment claim, and the trial court clearly intended to award attorney's fees to the prevailing party. Having overruled Lindemann's first issue, we overrule this part of its third issue.

In the other part of its third issue, Lindemann argues that the trial court abused its discretion by awarding unsegregated attorney's fees. Lindemann maintains that some portion of Campbell's attorney's services were directed towards the defense of Lindemann's trespass claim—e.g., "extensive portions of Tim Lindemann's deposition were focused solely on potential monetary damages, which relate only to the trespass claim"—and that fees are not recoverable for trespass. More importantly, Lindemann challenges the trial court's conclusion of law 6, which provides that the fees incurred in defending Lindemann's trespass claim were intertwined with the fees incurred in defending against Lindemann's declaratory-judgment claim insofar as they relate to Campbell's contention that the new tower did not increase the burden on Lindemann's surface estate:

6. Necessary legal services performed for Defendant on Lindemann's trespass claim are indistinguishable from necessary legal services performed for Defendant to create and sustain its arguments regarding the surface burden of the Original and New Towers. [Emphasis added.]
Campbell directs us to conclusion of law 6 and responds that the trial court acted within its discretion to award unsegregated attorney's fees.

We have previously set out the standards for fees segregation:

Parties seeking attorney's fees under Texas law "have always been required to segregate fees between claims for which they are recoverable and claims for which they are not." Tony Gullo Motors I, L.P. v. Chapa, 212 S.W.3d 299, 311 (Tex. 2006). The supreme court recognized an exception to this rule in Stewart Title Guaranty Co. v. Sterling: attorney's fees need not be segregated when "the fees rendered are in connection with claims arising out of the same transaction and are so interrelated that their prosecution or defense entails proof or denial of essentially the same facts." 822 S.W.2d 1, 11-12 (Tex. 1991). But in Chapa, the supreme court held that "[t]o the extent Sterling suggested that a common set of underlying facts necessarily made all claims arising therefrom 'inseparable' and all legal fees recoverable, it went too far" and flooded the courts of appeals with claims that recoverable and unrecoverable fees are inextricably intertwined. 212 S.W.3d at 312. The supreme court therefore held as follows:

Accordingly, we reaffirm the rule that if any attorney's fees relate solely to a claim for which such fees are unrecoverable, a claimant must segregate recoverable from unrecoverable fees. Intertwined facts do not make tort fees recoverable; it is only when discrete legal services advance both a recoverable and unrecoverable claim that they are so intertwined that they need not be segregated. We modify Sterling to that extent.

Id. at 313-14 (emphasis added).
AMX Enters., L.L.P. v. Master Realty Corp., 283 S.W.3d 506, 521 (Tex. App.—Fort Worth 2009, no pet.) (op. on reh'g).

As Lindemann observed in another part of its brief, the supreme court has reasoned that "the threshold inquiry [in construing an easement] is not whether the proposed use results in a material burden, but whether the grant's terms authorize the proposed use." Marcus Cable, 90 S.W.3d at 703. This is because "if a use does not serve the easement's express purpose, it becomes an unauthorized presence on the land whether or not it results in any noticeable burden to the servient estate." Id. (emphasis added). Because the relevant inquiry is whether the easement authorized the use and not whether the servient estate suffered any more or less burden, and because the trial court's conclusion of law 6 is premised upon this very basis, we agree with Lindemann that the fees that Campbell incurred defending against Lindemann's trespass claim did not also advance Campbell's defense to Lindemann's declaratory-judgment claim regarding the easement's construction. We hold that the trial court abused its discretion by awarding Campbell unsegregated attorney's fees, and we sustain this part of Lindemann's third issue.

When segregation is required, a claimant's failure to segregate fees does not mean that the claimant cannot recover any fees; unsegregated attorney's fees for the entire case are some evidence of what the segregated amount should be, and remand is required to calculate the segregated award. Tony Gullo Motors I, 212 S.W.3d at 314-15. --------

VI. CONCLUSION

Having overruled Lindemann's first and second issues, we affirm the part of the trial court's judgment ordering that Lindemann take nothing on its claims against Campbell. But having sustained part of Lindemann's third issue, we reverse the part of the trial court's judgment awarding Campbell attorney's fees and remand this cause to the trial court for a new trial on only the issue of attorney's fees.

/s/ Bill Meier

BILL MEIER

JUSTICE PANEL: WALKER, MEIER, and SUDDERTH, JJ. DELIVERED: December 8, 2016 WALKER, J., filed a dissenting opinion.


Summaries of

Lindemann Props., Ltd. v. Campbell

COURT OF APPEALS SECOND DISTRICT OF TEXAS FORT WORTH
Dec 8, 2016
NO. 02-15-00392-CV (Tex. App. Dec. 8, 2016)
Case details for

Lindemann Props., Ltd. v. Campbell

Case Details

Full title:LINDEMANN PROPERTIES, LTD. APPELLANT v. WARD A. CAMPBELL APPELLEE

Court:COURT OF APPEALS SECOND DISTRICT OF TEXAS FORT WORTH

Date published: Dec 8, 2016

Citations

NO. 02-15-00392-CV (Tex. App. Dec. 8, 2016)