In re Calumet Photographic, Inc.

UNITED STATES BANKRUPTCY COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION
Dec 16, 2014
Case No. 14 B 08893 (Bankr. N.D. Ill. Dec. 16, 2014)

Opinion

Case No. 14 B 08893

12-16-2014

In re: CALUMET PHOTOGRAPHIC, INC, ET AL Debtor.


Chapter 7

FINDINGS OF FACT AND CONCLUSIONS OF LAW IN SUPPORT OF ORDER GRANTING APPLICATION OF JENNER & BLOCK, ATTORNEYS FOR TRUSTEE, FOR ALLOWANCE OF INTERIM COMPENSATION AND REIMBURSEMENT OF EXPENSES

TOTAL FEES REQUESTED: $498,384.50
TOTAL FEES REDUCED: $14,822.75
TOTAL FEES ALLOWED: $483,561.75
TOTAL COSTS REQUESTED: $31,029.53
TOTAL COSTS REDUCED: $2,94930
TOTAL COSTS ALLOWED: $28,080.23

TOTAL FEES AND COSTS ALLOWED: $511,641.98

The attached time and expense entries have been underlined to reflect disallowance in whole or in part. The basis for each disallowance is reflected by numerical notations that appear on the left of each underlined entry. The numerical notations correspond to the enumerated paragraphs below.

(1) Improper Allocation of Professional Resources

The Court denies the allowance in part of compensation for the following task since a professional with a lower level of skill and experience or a paraprofessional could have performed the task. In re Pettibone, 74 B.R. 293, 303 (Bankr. N.D. Ill. 1987) ("Senior partner rates will be paid only for work that warrants the attention of a senior partner. A senior partner who spends time reviewing documents or doing research a beginning associate could do will be paid at a rate of a beginning associate. [Citation omitted]. Similarly, non-legal work performed by a lawyer which could have been performed by less costly non-legal employees should command a lesser rate."); In re Wildman, 72 B.R. 700, 710 (Bankr. N.D. Ill. 1987) (same); In re Alberto, 121 B.R. 531, 535 (Bankr. N.D. Ill. 1990) (determining use of partner appropriate where attendant complex legal issues warrant highly experienced practitioner).

(2) Unreasonable Time

The Court denies the allowance in part of compensation for the following task since the professional or paraprofessional expended an unreasonable amount of time on this task in light of the nature of the task, the experience and knowledge of the professional performing the task, and the amount of time previously expended by the professional or another on the task. In re Pettibone, 74 B.R. 293, 306 (Bankr. N.D. Ill. 1987) ("The Court will determine what is the reasonable amount of time an attorney should have to spend on a given project... An attorney should not be rewarded for inefficiency. Similarly, attorneys will not be fully compensated for spending an unreasonable number of hours on activities of little benefit to the estate."); In re Wildman, 72 B.R. 700, 713 (Bankr. N.D. Ill. 1987) (same).

As to the time devoted to the preparation of the fee application itself, the Court denies the allowance of compensation that is disproportionate to the total hours in the main case. In re Wildman, 72 B.R. 700, 711 (Bankr. N.D. Ill. 1987) ("In the absence of unusual circumstances, the hours allowed by this Court for preparing and litigating the attorney fee application should not exceed three percent of the total hours in the main case."); In re Spanjer Bros., Inc., 203 B.R. 85, 93 (Bankr. N.D. Ill. 1996) (compensation limited to 5%). See also In re Pettibone Corp., 74 B.R. 293, 304 (Bankr. N.D. Ill. 1987) (citing Coulter v. State of Tennessee, 805 F.2d 146, 151 (6th Cir. 1986) (in non-bankruptcy cases, compensation for preparation and litigation of fee petitions limited to 3-5% of the hours of the main case)).

(4) Insufficient Description

The Court denies the allowance of compensation for the following task since the description of the time entry fails to identify in a reasonable manner the service rendered. In re Pettibone, 74 B.R. 293, 301 (Bankr. N.D. Ill. 1987) ("A proper fee application must list each activity, its date, the attorney who performed the work, a description of the nature and substance of the work performed, and the time spent on the work. [Citation omitted] Records which give no explanation of the activities performed are not compensable."); In re Wildman, 72 B.R. 700, 708-9 (Bankr. N.D. Ill. 1987) (same).

(5) Duplication of Services

The Court denies the allowance of compensation for services that duplicate those of another professional or paraprofessional. See 11 U.S.C. § 330(a)(4)(A)(i). Reduction in fees is warranted if multiple attorneys from the same firm appear in court on a motion or argument or for a conference, unless counsel adequately demonstrates that each attorney present contributed in some meaningful way. In re Pettibone, 74 B.R. 293, 307 (Bankr. N.D. Ill. 1987) ("A debtor's estate should not bear the burden of duplication of services. If found in the record, such duplication shall be disallowed by the court as unnecessary."). It is also an accepted principle that generally no more than one attorney may bill for time spent in an intra-office conference or meeting absent an adequate explanation. See In re Adventist Living Ctrs., Inc., 137 B.R. 701, 716 (Bankr. N.D. Ill. 1991); In re Pettibone, 74 B.R. at 303.

(7) Lumping

The Court may impose a ten percent penalty for "lumping." In re Wildman, 72 B.R. 700, 709 (Bankr. N.D. Ill. 1987) ("Applicants may not circumvent the minimum time requirement or any of the requirements of detail by "lumping" a bunch of activities into a single entry, [citation omitted]. Each type of service should be listed with the corresponding specific time allotment.").

(11) Overhead Costs are Non-Compensable

The Court denies reimbursement for fees or expenses that are overhead costs. Expenses which are overhead are not compensable because they are built into the hourly rate. See In re Wildman, 72 B.R. 700, 731 (Bankr. N.D. Ill. 1987). Overhead, for bankruptcy purposes, includes "all continuous administrative or general costs or expenses incident to the operation of the firm which cannot be attributed to a particular client or cost." In re Convent Guardian Corp., 103 B.R. 937, 939-40 (Bankr. N.D. Ill. 1989) (quoting In re Thacker, 48 B.R. 161, 164 (Bankr. N.D. Ill. 1985)).

(12) Clerical Work Not Compensable

The court disallows the compensation of clerical or stenographic employees of the professional for the performance of routine clerical or administrative activities in the normal course of the professional's business, such as photocopying, secretarial work, or routine filing. Such activities are not in the nature of professional services and must be absorbed by the applicant's firm as an overhead expense. In re Dimas, LLC, 357 B.R. 563, 577 (Bankr. N.D. Cal. 2006) (citing Missouri v. Jenkins, 491 U.S. 274, 288 n. 10 (1989)). See also In re Chellino, 209 B.R. 106, 114 (Bankr. C.D. Ill. 1996) (Paralegal, but not "clerk" services entitled to compensation at an hourly rate; clerk activities are overhead of the professional); Souza v. Miguel, 32 F.3d 1370, 1375 (9th Cir. 1994) (Trustee not entitled to reimbursement or compensation of overhead expenses such as secretarial, stenographic, clerical, and routine messenger services). Dated: December 16, 2014

/s/________

Janet S. Baer

United States Bankruptcy Judge
CALUMET PHOTOGRAPHIC INC.
C/O CATHERINE STEEGE, TRUSTEE
INVOICE # 9311326
REPLACES VOIDED INVOICE # 9309378
NOVEMBER 14, 2014 CLIENT NUMBER - 54096 FOR PROFESSIONAL SERVICES RENDERED
THROUGH OCTOBER 31, 2014
CASE ADMINISTRATION MATTER NUMBER- 10008

3/17/2014

MMR

2.70

Prepare for meeting with Calumet management and

M. Berkoff re case status (1.0); meeting with same

(1.5); review of insurance policy information (.2).

1,755.00

3/19/2014

MMR

2.00

Met with debtor's management re facts of case.

1,300.00

3/19/2014

MMR

0.50

Confer with Trustee regarding motions to file re

case administration and sale process.

325.00

3/21/2014

LSR

1.00

Drafted motion for joint administration of Calumet

cases.

580.00

3/21/2014

MMR

0.30

Review and finalize joint administration motion.

195.00

3/21/2014

TDH

9.00

Reviewed dockets for Six Calumet cases and

prepared service list and mailing labels consisting of

all attorneys of record, creditors, bidders and

interested parties (6.6); prepared 10 orders - five for

Joint Administration Motion and five for Motion to

Retain Jenner (1.0) ECF filed Joint Administration

and Motion to Retain in each of the six Calumet

cases (1.0) service of same (.4).

2,925.00

3/24/2014

MMR

0.50

Research regarding communications made by

customers/employees regarding bankruptcy filing.

325.00

3/25/2014

MMR

0.70

Review applicable insurance policies in connection

with preparing response to Bankdirect's motion for

adequate protection.

455.00

3/25/2014

MMR

0.60

Respond to email regarding pending litigation in

ND Ill. (.2); review complaint for purposes of

preparation of stay notice (.4).

390.00



4/10/2014

MMR

2.40

Draft motion to permit third party vendors to return

property to customers (.8); confer with C. Steege on

motion and revisions to same (.3); review of email

from E. Masters regarding prepetition repairs and

list of same (.2);]finalize and file motion to return

customer property (.4); draft letter tor Hilco's use

regarding a/r collection (.2); email communiations

with Hilco regarding process of a/r collection (.2);

review of email from J. Russell regarding transfer to

Steege trustee account and Steege response to same

(.3).

1,560.00

4/14/2014

MMR

0.50

Revise order on third party vendor motion (.3);

confer with N. Peterman regarding same and further

revisions (.4).

325.00

4/15/2014

MMR

0.50

Attend hearing on landlord automatic stay motions

and third party vendor motions.

325.00

4/15/2014

MMR

0.90

Negotiations regarding order on third party vendors

and turnover of equipment to customers (.4); phone

call with counsel for Cannon, Hasselbad, and

Debtor regarding same (.5).

585.00

4/15/2014

MMR

0.70

Correspond with Debtor's former CEO (G. Garcia)

regarding customer repair and rental issues (.3);

review of repair data (.4).

455.00

4/15/2014

MMR

0.20

Phone call with D. Joel regarding request from

CalPhoto for rental equipment.

130.00

4/15/2014

TDH

2.00

Worked on locating new addresses for returned

mail.

650.00

4/16/2014

CS

0.10

Telephone conference with Verizon counsel re

executory contracts.

90.00

4/16/2014

TDH

2.00

Obtained schedules and statements for attorney

review (.5); updated service list and corresponding

labels with recent appearances (1.5).

650.00

4/16/2014

MMR

0.20

Revise third party vendor order.

130.00

4/16/2014

MMR

0.40

Respond to Hilco request regarding a/r settlement

level.

260.00

4/16/2014

MMR

0.20

Review of list of customer repairs in connection

with third party return order.

130.00



4/17/2014

TDH

1.00

Worked on locating addresses for returned mail.

325.00

4/17/2014

MMR

0.20

Email correspondence with R. Rosnethal regarding

third party return order and ability of Trustee to

locate certain repair information.

130.00

4/18/2014

MMR

0.80

Email exchange with counsel for Cannon regarding

repair list (.3); follow up with debtors on same (.3);

review of proof of claim regarding potential repair

issue (.1) and forward caller information to R.

Rosenthal (.1).

520.00

4/22/2014

TDH

0.60

Updated service list with corrected addresses.

195.00

4/24/2014

MMR

0.30

Phone call (.2) and letter follow-up to People's Gas

(.1) regarding potential stay violation.

195.00

4/25/2014

MMR

0.20

Redirect proofs of claim received to Bankruptcy

Court.

130.00

4/28/2014

TDH

1.10

Processed vendor invoices for purposes of updating

matrix.

357.50

4/30/2014

MMR

0.30

Review of complaint from Massachusetts attorney

general (.1) and email to Debtor's counsel N. Miller

on same (.2).

195.00

5/1/2014

MMR

0.50

Phone call with Bowrey regarding Visa/MasterCard

settlement with vendor and information needed to

participate in same (.4); review of emails on same

(.1).

325.00

5/1/2014

MMR

0.10

Email to G. Garcia regarding rental issues and

location of property.

65.00

5/2/2014

MMR

0.80

Emails with Hilco to request reconciliation

documents for A/R collections.

520.00

5/5/2014

TDH

2.60

Updated service list and related mailing labels.

845.00

5/6/2014

MMR

0.30

Review of request for worker's comp audit (.1) and

confer with C. Steege and Karyn Kirk regarding

logistics for same (.2).

195.00

5/7/2014

TDH

3.00

Reviewed and readied three motions for ECF filing

(1.0); prepared draft orders re same (1.0); ECF filed

motions via the Court's CM/ECF system (.5);

service of same (.5);.

975.00



5/12/2014

TDH

0.50

Updated service list with parties recent appearances.

162.50

5/15/2014

MMR

0.20

Review of workers comp info to provide to auditor.

130.00

5/20/2014

MMR

1.80

Prepare for Trustee's 341 meeting (.6) and

participate in same (1.2).

1,170.00

5/22/2014

MMR

0.20

Advise parties of continuance of 5/27 hearing.

130.00

5/23/2014

TDH

4.50

Converted five orders to court issued forms for

Motion to Assume and Assign Sleepy's Lease and

four Motions to reject leases (Cedar Riverview,

Eldor First Street, Keeney Family, Square 407 (1.3);

service via overnight mail for same (3.2)

1,462.50

5/23/2014

MMR

1.00

Resolve issues pertaining to IP functionality (.4);

conference with M. Patterson regarding document

removal (.2); coordinate with Hilco regarding status

of stores and cash (.4).

650.00

5/27/2014

LSR

1.30

Attended hearings on various case administration

matters.

754.00

5/27/2014

TDH

0.50

Readied and ECF filed revised order via Court's

CM/ECF system.

162.50

5/28/2014

TDH

2.80

Updated service list with new appearances (1.0);

readied two motions for ECF filing via Court's

LCM/ECF system (1.0); service of same (.8).

910.00

6/2/2014

MMR

0.50

Prepare draft letters to customers holding rental

equipment and demanding return of same.

325.00

6/2/2014

MMR

0.30

Review of May lock box statements (.2) and send

same to Hilco AP team (.1).

195.00

6/2/2014

TDH

0.90

Obtained designated documents for review by M.

Root.

292.50

6/3/2014

MMR

0.60

Reach out to IT regarding protecting client data (.3);

review of Latysis cure amount (.1) and email

regarding same and data storage issues (.2).

390.00

6/4/2014

TDH

0.50

Reviewed docket and updated service list.

162.50

6/5/2014

MMR

1.00

Phone conference with data vendors regarding back

up of vendor (.5); research on same (.3); email to M.

Fenton and review of response to same (.2).

650.00

6/6/2014

MMR

0.20

Follow up correspondence on server issue.

130.00



6/10/2014

MMR

0.60

Conference with data storage vendors regarding

copy issue (.4); email to purchaser on same (.1);

report on same to Trustee (.1).

390.00

6/10/2014

TDH

1.50

Updated case files and archived team emails.

487.50

6/11/2014

MMR

0.40

Phone conference with Latisys and Timesavers

regarding data storage issues (.3); report to Trustee

regarding same (.1).

260.00

6/26/2014

MMR

0.30

Correspond with C. Schram regarding insurance

refund (.1) and review of data received from same

(.2).

195.00

6/26/2014

TDH

3.80

Updated service list (2.0);]readied three motions and

orders for filing via Court's CM/ECF, system;

service of same (1.8)

1,235.00

6/27/2014

MMR

0.30

Phone call with C. Schram regarding insurance

coverage issues (.2) and report on same to C. Steege

(.1).

195.00

7/1/2014

MMR

0.40

Review of lock box statements (.2) and circulate

same to Hilco (.2).

260.00

7/2/2014

MMR

0.10

Email with Hilco regarding receivable issues.

65.00

7/2/2014

MMR

0.20

Email correspondence with Hilco regarding utility

issue.

130.00

7/8/2014

MMR

0.10

Phone conference with Com Ed regarding utility

issue.

65.00

7/11/2014

TDH

1.00

Readied motion and order for ECF filing via the

Court's CM/ECF system (.5); service of same (.5)

325.00

7/15/2014

MXP

1.50

Worked on mailing the Trustee's Motion to Compel Compliance with Sale Order to service list.

300.00

7/15/2014

TDH

2.80

Prepared proposed order form (.6); reviewed and

readied exhibits to motion for ECF filing (1.2); ECF

filed same via Court's CM/ECF system; service of

same (1.0).

910.00

7/16/2014

MMR

0.20

Email to broker holding items at customs.

130.00

7/16/2014

TDH

1.50

Prepared proposed order form (.3); reviewed and

readied exhibits to motion for ECF filing (.6) ECF

filed same via Court's CM/ECF system (.6).

487.50



7/21/2014

TDH

1.50

Readied reply for ECF filing (1.0) and filed same

via Court's CM/ECF system (.5).

487.50

7/23/2014

MMR

0.20

Email with vendors regarding data storage (.1);

follow up with C&A counsel regarding same (.1).

130.00

7/29/2014

MMR

0.10

Review of request from Hilco related to receivables

and email to Chase on same.

65.00

7/30/2014

TDH

0.50

Reviewed docket and updated service list.

162.50

7/31/2014

TDH

2.40

Prepared proposed order (.4); filed motion to

authorize via Court's CM/ECF system (1.0); service

of same; located employee address information for

R. Sinnapan (1.0).

780.00

8/6/2014

MMR

0.80

Revise Latisys contract (.4); prepare motion to

approve same (.4).

520.00

8/7/2014

MMR

0.30

Communications with data service providers

regarding project.

195.00

8/8/2014

MMR

0.70

Review and revise data vendor contracts.

455.00

8/11/2014

MMR

0.50

Review and forward June statements to Hilco.

325.00

8/11/2014

MMR

0.50

Phone call with Latisys regarding documentation of

master services agreement (.4) and follow up emails

on same (.1).

325.00

8/13/2014

MMR

0.40

Review and comment on license agreement (.3) and

correspondence with Timesavers on same (.1).

260.00

8/13/2014

MMR

0.30

Revisions to data storage vendor motion.

195.00

8/14/2014

CS

0.10

Edit motion re data contracts.

90.00

8/14/2014

MMR

0.50

Communications with data services providers

regarding contracts (.4); phone call with IT

department on same (.1).

325.00

8/15/2014

CS

0.30

Telephone conference with Southware re license

terms.

270.00

8/15/2014

MMR

0.40

Revise and file data storage motion.

260.00

8/15/2014

MMR

0.40

Phone conference with SouthWare principal

regarding license amendments.

260.00



8/15/2014

MXP

0.50

Prepared tillable order for filing with the Trustee's

Motion to Approve Payment to Data Service

Providers.

100.00

8/18/2014

MMR

0.30

Conference call with South Ware license attorney

regarding license.

195.00

8/19/2014

MMR

0.20

Phone conference with South Ware counsel

regarding license.

130.00

8/20/2014

MMR

0.90

Attend hearing on data service provider motion (.5);

follow up communications with data service

providers regarding execution of agreements (.4).

585.00

8/21/2014

TDH

2.60

Reviewed docket and updated service list (.2);

readied proposed order and motion for ECF filing

(.8); ECF filed same (.2); retrieved documents for

M Root (.5); prepared and ECF filed team

appearances in adversary mate (.9).

845.00

9/4/2014

MMR

0.10

Review of request from Paycom vendor.

65.00

9/5/2014

MMR

0.50

Communications with data service providers

regarding data project and status.

325.00

9/9/2014

MMR

0.40

Review of emails from data service providers (.2)

and involve Jenner IT team in resolving technical

issues (.2).

260.00

9/12/2014

TDH

0.50

Verified email service of amended Notice.

162.50

9/15/2014

MMR

0.30

Review of correspondence among data service

providers regarding technical issues.

195.00

9/17/2014

MMR

0.20

Email correspondence with data team regarding

status of project.

130.00

9/17/2014

MMR

0.10

Email to Mesirow regarding returned insurance

premium.

65.00

9/18/2014

MMR

0.50

Participate in call with data service provider (.3);

correspond with E. Masters regarding database

access (.1); provide update to C. Steege (.1).

325.00

9/19/2014

MMR

0.30

Review of emails from data service providers regarding status of project (.2); correspond with Z.

Master at J&B regarding same (.1.).

195.00



9/19/2014

MMR

0.30

Review of email from D. Williams regarding

insurance premium (.2) and respond to same (.1).

195.00

9/19/2014

MMR

0.20

Email to bank regarding copies of customer checks

(.1) and respond to Hilco email on same (.1).

130.00

9/19/2014

MMR

0.20

Review of data emails from Latisys (.1) and respond

to same (.1).

130.00

9/22/2014

MMR

0.30

Email correspondence with data service providers

regarding status of project.

195.00

9/22/2014

MMR

0.30

Phone call with S. Ceron regarding Southware data

system.

195.00

9/23/2014

MMR

0.80

Review of Southware system (.4); phone calls with

former employee regarding reports for same (.2);

emails with Timesavers regarding same (.2).

520.00

9/23/2014

MMR

0.10

E-mail to L. Raiford regarding motion to pay

employee expense.

65.00

9/24/2014

MMR

2.50

Review of Southware data system (.5); meeting with

S. Ceron regarding southware data system (2.0).

1,625.00

9/24/2014

MMR

1.00

Phone call with Timesavers regarding southware

system (.4) and run reports through same (.6).

650.00

9/24/2014

LSR

1.00

Drafted motion to pay independent contractor.

380.00

9/25/2014

CS

0.40

Revised independent contractor motion.

360.00

9/25/2014

MMR

0.30

Revise motion to employ independent contractor.

195.00

9/25/2014

MMR

0.50

Follow up work with Timesavers and Z. Masters

(Jenner IT) to make improvements to Southware

system.

325.00

9/25/2014

MMR

0.20

Review of correspondence from D. Strubbe

regarding insurance claim.

130.00

9/25/2014

TDH

1.10

Updated service list and converted proposed order

(.5); readied and ECF filed motion (.6).

357.50

9/25/2014

LSR

0.20

Edited Calumet independent contractor motion.

16.00

9/26/2014

MMR

0.30

Work on Southware reports (.1) and emails with

data providers on same (.2).

195.00.

9/29/2014

MMR

0.20

Emails regarding Southware database usability and

searches.

130.00



9/30/2014

MMR

3.30

Access Southware system and email to Timesavers

regarding data issue (.1); meeting with S. Cedona

regarding same to run reports (1.0); access system

and generate additional reports (1.5); review of

spreadsheets circulated by Hilco regarding invoice

and other data needs (.7).

2,145.00

10/1/2014

ZM

1.00

Set-up a laptop to connect to the Latisys server and

program; coordinated with case team re same.

325.00

10/6/2014

MMR

0.80

Obtain documents to respond to insurance auditors

request for documents.

520.00

10/6/2014

ZM

1.00

Explored options to convert reports into Excel

spreadsheets; converted report to spreadsheet;

coordinated with case team re same.

325.00

10/7/2014

CS

0.20

Email with insurance company re worker's

compensation audit and documents requested.

180.00

10/7/2014

MMR

0.50

Obtain and review interim sales report for auditors.

325.00

10/7/2014

MMR

0.50

Review of invoice detail report for missing

transactions.

325.00

10/7/2014

MMR

0.10

Email to E. Masters regarding documents needed for

audit request.

65.00

10/7/2014

MXP

0.90

Reviewed index to boxes of case files to obtain

financial documents for workers comp audit.

180.00

10/7/2014

AMY

0.50

Reviewed storage index to obtain financial materials

for workers comp audit.

100.00

10/10/2014

TDH

2.00

Communication with clerk re filing(.2);prepared

Notice and Proposed order (.7); readied and ECF

filed Agreed Motion (1.1

650.00

10/13/2014

MMR

0.80

Review of box index list in response to request from

auditors (.3); review of reports created from

southware system related to same (.5).

520.00

10/13/2014

TDH

2.00

Prepared documents for production.

650.00

10/14/2014

TDH

1.30

Finalized documents for production.

422.50

10/21/2014

TDH

1.00

Updated service list (.2) converted order to court's

form (.2); readied exhibits and ECF filed 9019

Motion (.6).

325.00



4/1/2014

CS

0.50

Lengthy telephone conference with M. Berkoff re

sale and APA.

450.00

4/1/2014

CS

0.30

Telephone conference with prospective A/R

collector.

270.00

4/1/2014

MMR

1.60

Phone conferences and emails with M. Berkoff

regarding timing of draft APA (.3); receive APA

and review and comment on same; circulate to C.

Steege (1.3).

1,040.00

4/2/2014

CS

0.50

Telephone conference with M. Berkoff re APA.

450.00

4/2/2014

CS

3.00

Revised APA with insiders.

2,700.00

4/2/2014

CS

0.30

Telephone conference with P. Siddiqui re sale

terms.

270.00

4/2/2014

MMR

2.90

Ongoing negotiations with Debtors regarding APA

and proposed sale motion, including multiple

lengthy teleconferences with Trustee and review of

APA (2.7);Jphone conference with lender's counsel

regarding status of discussions (.2).

1,885.00

4/2/2014

MMR

0.20

Correspondence with National Camera (potential

bidder) regarding terms of expected deal and timing

issues.

130.00

4/3/2014

CS

0.50

Telephone conference with Great American attorney

re bid.

450.00

4/3/2014

CS

0.20

Telephone conference with M. Berkoff re contract

terms.

180.00

4/3/2014

CS

0.20

Telephone conference with B. Noilman re Hilco

agreement.

180.00

4/3/2014

CS

1.50

Revised Hilco agreement.

1,350.00

4/3/2014

MMR

3.50

Negotiations with C. Steege and Debtor regarding

revised proposal (.5); review of revised Hilco bid

and negotiations regarding same (.7); multiple

conferences with Debtor and Hilco regarding

agreements and motions to be filed (.8); phone call

with lender's counsel, Pete Siddiqui, regarding same

(.3); review of draft sale motion and Hilco motions

(1.2).

2,25.00

4/3/2014

LSR

4.00

Drafted motion to sell property (5 locations).

2,320.00



4/3/2014

LSR

1.20

Drafted motion to retain Hilco.

696.00

4/3/2014

TDH

3.60

Reviewed docket and 30 emails from M. Root to

update general and bidders service lists and mailing

labels.

1,170.00

4/4/2014

CS

2.50

Revised insider contract.

2,250.00

4/4/2014

CS

1.00

Revised Hilco agreement.

900.00

4/4/2014

CS

2.50

Telephone conference with CalPhoto group re sales

contract.

2,250.00

4/4/2014

CS

2.00

Revised sale motion (1.0) and order (1.0) re

CalPhoto.

1,800.00

4/4/2014

CS

0.70

Second telephone conference with CalPhoto group

re APA.

630.00

4/4/2014

MMR

1.80

Email correspondence regarding drafts of Hilco

motion and review of same (1.2); confer with C.

Steege regarding interested bidder list and issues

pertaining to Hilco motion (.3); phone call with D.

Rosner regarding motion (.2); email to L. Raiford

regarding landlord contact information (.1).

1,170.00

4/4/2014

VEL

1.40

Edited Hilco motion (.5); office conference with C.

Steege re same (.2); updated revised terms, sale

proposal (.4); edited sale motion (.3).

1,260.00

4/4/2014

MM.R

0.10

Email with representative of National Camera

regarding sale motion.

65.00

4/4/2014

LSR

2.80

Prepared motion to sell property for filing (1.9);

reviewed property leases in connection with same

(.4); worked with T. Elooker on service list

regarding same (.5).

1,624.00

4/4/2014

LSR

1.20

Edited motion to retain Hilco to sell assets.

696.00

4/4/2014

AMY

8.50

Worked on locating email, fax or address contact

information for list of approximately 200 callers ,

employees and parties on service lists for purpose of

providing notice.

1,700.00

4/6/2014

CS

1.20

Revised APA with CalPhoto.

1,080.00

4/6/2014

CS

0.40

Revised APA sale notice.

360.00

4/6/2014

CS

0.40

Revised APA motion.

360.00



4/8/2014

MMR

0.70

Email communications with L. Fournier, potential

bidder for certain assets (.3), located requested

documents and provide to same in addition to

response to questions (.4).

455.00

4/8/2014

AMY

4.00

Worked on service of documents re Notice of

Hearing on sale motion.

800.00

4/8/2014

LSR

0.60

Responded to inquiry regarding service of Hilco

motion.

348.00

4/8/2014

MMR

3.90

Prepare for and attend meeting with Hilco and

Debtor's management to discuss re-opening of nine

stores (2.5); review of Hilco revised declaration and

coordinate filing of same (.2); prepare for 4/9

hearing on Hilco motion and plan termination

motion (1.2).

2,535.00

4/8/2014

MMR

0.20

Review of email from 1). Rosner (landlord)

regarding potential objection to Hilco motion.

130.00

4/8/2014

MMR

0.30

Pull information to respond to D. Rosner (landlord)

questions re sale process.

195.00

4/8/2014

TDH

3.60

Updated service list and related mailing labels (2.0);

follow up re service of Notice; readied affidavit for

ECF filing (1.2)£ECF filed same via court's ECF

CM/ECF system (.4).

1,170.00

4/8/2014

MMR

0.10

Correspond with C. Steege regarding response to

Rosner (landlord) objections to Hilco sale motion.

65.00

4/9/2014

CS

1.00

Attended hearing re Hilco motion.

900.00

4/9/2014

CS

0.50

Telephone conference with Cambridge landlord re

sale process.

450.00

4/9/2014

CS

0.50

Email with Hilco re landlord and order issues.

450.00

4/9/2014

MMR

0.10

Correspond with CalPhoto regarding sale motion

and receipt of earnest deposit.

65.00



4/9/2014

MMR

4.10

Meeting with C. Steege to discuss presentation of

Hilco/plan termination motions (.5); prepare for

hearing on Hilco/plan termination (.6); attend

hearing on Hilco/plan termination/adequate

protection (.8)Jcirculate entered copy of Hilco

retention motion (.2); respond to S. Nerger

questions regarding status of store openings and

employees (.2); respond to issue regarding potential

breach of security at LA store (.8); attend to various

logistics issues pertaining to planned 4/11 opening

of certain stores (1.0).

2,665.00

4/9/2014

LSR

0.40

Responded to inquiry regarding service of Hilco

motion.

232.00

4/9/2014

MMR

1.30

Phone conference with Cambridge landlord regarding potential objection to Hilco motion (.4);

follow up on question regarding service (.4). follow

up with counsel for Cambridge following hearing

regarding timing of lease payment and GOB issues

(.5).

845.00

4/9/2014

TDH

1.00

Reviewed docket and returned mail for purposes of

updating service lists and related mailing labels re

same.

325.00

4/10/2014

CS

0.10

Telephone conference with M. Berkoff re sale

hearing.

90.00

4/10/2014

CS

0.20

Revised sale ad.

180.00

4/10/2014

MMR

1.50

Draft and send email to all potential bidders

regarding process and access to stores for inventory

review (.5); follow up with a number of bidders

regarding individual questions and confirming

opportunities to review assets (1.0).

975.00

4/10/2014

MMR

0.60

Phone calls with M. Wood and I. Fredericks

regarding logistics for 4/11 store opening.

390.00

4/10/2014

MMR

0.20

Correspond with T. Hooker regarding

advertisements to run for sale.

130.00

4/10/2014

TDH

2.00

Communications with vendor re publication of

notice (.5); drafted and filed proof of service for

Motion to sell assets (1.0); drafted certificate of

publication (.5).

650.00



4/24/2014

LTYX

2.50

Worked on e-filing Notice of Cure Cost (.2) :

worked on preparation re filing and service of

Notice of Cure Cost (2.3).

812.50

4/24/2014

MMR

3.60

Review of APA in connection with preparation of

closing documents (.8); participate in call with M.

Berkoff and others regarding Tuesday sale hearing

(.8); review and revise cure schedule (1.3);

correspondence with CalPhoto's counsel regarding

cure schedule (.2); finalize and file same (.5).

2,340.00

4/24/2014

MMR

0.20

Email correspondence with Tony Chang, interested

purchaser, regarding Hollywood property.

130.00

4/24/2014

CS

2.50

Prepared for sale hearing.

2,250.00

4/25/2014

LTYX

1.20

Prepared certificate of service re notice of cure cost

(.3); assembled service list and assembled fax

transmission receipt re same (.6); readied same for

ECF filing (.2); e-filed same (.1).

390.00

4/25/2014

MMR

2.00

Multiple phone calls with M. Fenton regarding

potential bid (1.0); correspondence with P. Siddiqui

regarding same (.5); review of APA in connection

with same (.5).

1,300.00

4/25/2014

CS

0.50

Telephone conference with M. Fenton re offer.

450.00

4/25/2014

CS

0.80

Second telephone conference with M. Fenton and

client re offer.

720.00

4/25/2014

CS

0.70

Telephone conference with P. Siddiqui re offer.

630.00

4/25/2014

CS

0.50

Telephone conference with Hilco re merchant

number.

450.00

4/25/2014

TDH

0.80

Finalized Certificate of Publication re sale hearing

(.6); cf filed same via the court's CM/ECF system

(.2).

260.00

4/28/2014

CS

2.00

Prepared for sale hearing.

1,800.00

4/28/2014

CS

0.20

Telephone conference with M. Berkoff re sale.

180.00



4/28/2014

MMR

4.10

Preparations for sale hearing, including calculating

value of bid, outlining bases for trustee's business

judgment, reviewing landlord objections (2.3);

phone conference with Debtors' counsel regarding

hearing and closing matters (.8); phone conference

with P. Siddiqui regarding other bidders (.2); review

of last C&A Marketing marked up of APA (.8).

2,665.00

4/28/2014

MMR

0.50

Correspond with Hilco regarding store closing sale

issues.

325.00

4/28/2014

TDH

0.40

Obtained designated documents for 4/29/14 sale

hearing as requested by M. Root.

130.00

4/29/2014

CS

2.00

Prepared for sale hearing.

1,800.00

4/29/2014

CS

2.50

Attended sale hearing.

2,250.00

4/29/2014

CS

2.50

Prepared revised APA with C&A Marketing.

2,250.00

4/29/2014

CS

0.30

Telephone conference with M. Fenton re revised

APA with C&A Marketing.

270.00

4/29/2014

CS

1.00

Revised sale order.

900.00

4/29/2014

CS

0.70

Revised sale closing documents.

630.00

4/29/2014

MMR

7.80

Prepare for sale hearing (.6); attend sale hearing and

auction (2.5); revisions to sale order (.8); prepare

drafts of various closing documents (1.2.); review of

amended asset purchase agreement (.8); confer with

Trustee regarding closing details (.5);

communications with purchaser's counsel regarding

closing details (.6); revisions to sale order and

circulate same (.8).

5,070.00

4/29/2014

MMR

0.60

Correspond with Hilco regarding A/R issues and

store closing matters.

390.00

4/30/2014

CS

0.50

Office conference with Hilco re leases/sales.

450.00

4/30/2014

CS

3.00

Worked with landlords re revisions to order.

2,700.00

4/30/2014

CS

3.00

Revised APA and finalized same.

2,700.00



5/8/2014

MMR

1.40

Review of Sun Times article regarding Oak Brook

store opening (.2); correspondence with Trustee

regarding issues related to same due to no lease

assignment (.2); conference with M. Fenton and

client regarding same (.5); revise form of lease

assignment (.3); phone conference with counsel for

Oak Brook to confirm agreement (.2).

910.00

5/8/2014

MMR

0.20

Review of closing documents received by M.

Fenton.

130.00

5/8/2014

MMR

0.20

Email with AmEx regarding payments.

130.00

5/9/2014

CS

0.30

Telephone conference with M. Fenton re motion

against CalPhoto.

270.00

5/9/2014

CS

0.30

Reviewed Purchaser's motion against CalPhoto.

270.00

5/9/2014

MMR

0.50

Conference with Purchaser regarding motion to

compel and post-closing complications (.2); review

of motion to compel (.3).

325.00

5/12/2014

MMR

0.50

Review of motion to compel (.2); email to M.

Fenton regarding hearing on same (.1); phone

conference with P. Siddiqui regarding same (.2).

325.00

5/14/2014

MM.R

0.20

Review of correspondence regarding access to

software issues and potential interruption of service.

130.00

5/14/2014

MMR

0.30

Phone call with M. Berkoff regarding concerns

raised with regard to motion to compel.

195.00

5/14/2014

MMR

0.50

Review of sales report (.2); coordinate with Hilco

regarding store closing issues (.3).

325.00

5/15/2014

CS

0.50

Responded to C&A Marketing's emails re computer

equipment and leases.

450.00

5/16/2014

MMR

0.20

Email communication with Hilco regarding store

closings and rejection issues.

130.00

5/19/2014

TDH

0.80

Prepared proposed motion to compel for ECF filing

(.4); ECF filed same via Court's CM/ECF system

260.00

5/20/2014

CS

0.20

Prepared report of sale.

180.00

5/20/2014

CS

0.50

Several telephone conferences with M. Fenton re

inter shop license.

450.00



6/11/2014

MMR

0.80

Phone conference with Purchaser and counsel

regarding multiple post-closing and case

administration issues.

520.00

6/16/2014

CS

0.20

Office conference with M. Root re computer issues

and C. Piekarski.

180.00

6/16/2014

MMR

0.30

Email correspondence with C&A Marketing

regarding data storage issues.

195.00

6/17/2014

CS

0.30

Telephone conference with M. Fenton and C.

Piekarski re data issues.

270.00

6/17/2014

CS

0.30

Telephone conference with M. Fenton and M. Root

re data issues.

270.00

6/17/2014

MMR

0.30

Phone conference with C. Steege and M. Fenton

regarding data issue.

195.00

6/18/2014

CS

0.20

Email correspondence with L. Berliner re email

lists.

180.00

6/19/2014

CS

0.30

Telephone conference with M. Fenton re computers.

270.00

6/19/2014

MMR

0.50

JFurther discussions with Fenton regarding computer issues (.3); correspond with vendors (.2).

325.00

6/20/2014

MMR

0.10

Email with vendor regarding data storage issue.

65.00

6/23/2014

CS

0.30

Telephone conference with M. Fenton re computer

data.

270.00

6/23/2014

MMR

Additional phone conference with M. Fenton

regarding computer data issue.

195.00

6/26/2014

CS

0.50

Telephone conference with M. Fenton re data.

450.00

6/26/2014

MMR

1.20

Phone conference with Fenton regarding data issue

(.5); draft email regarding same (.5); follow up with

Fenton and relay conversation to C. Steege (.2).

780.00

6/26/2014

MMR

0.20

Email communication with N. Miller regarding

Debtor's position on motion to modify order and

meeting.

130.00

6/27/2014

MMR

1.60

Meeting with N. Miller regarding hard drive and

intershop issue (.5); review of motion and response

regarding same (.8); follow up email

correspondence and phone call with N. Miller (.3).

1,040.00



6/27/2014

CS

0.50

Met with N. Miller re hard drive.

450.00

6/30/2014

MMR

0.70

Phone conference with M. Fenton regarding hard

"drive and related issues (.2); phone conference with

N. Miller on same (.1); confer with C. Steege

regarding position for hearing (.1); prepare for

hearing (.3).

455.00

6/30/2014

MMR

0.60

Review of reply filed by Debtor on motion to amend

order (.5) and conference with N. Miller on same

(.1).

390.00

6/30/2014

CS

0.30

Telephone conference with M. Fenton re hard drive

and computer program.

270.00

7/1/2014

MMR

0.20

Post-hearing conference with Berkoff and Fenton

regarding closing issues.

130.00

7/9/2014

MMR

1.00

Draft motion to compel performance with sale

agreement.

650.00

7/14/2014

CS

2.00

Revised motion re enforcement sale order.

1,800.00

7/14/2014

MMR

0.10

Phone conference with C. Steege regarding motion

to compel compliance with sale order.

65.00

7/15/2014

CS

0.50

Reviewed and revised memo to compel compliance

with sale order.

450.00

7/15/2014

CS

0.30

Telephone conference with H. Israel re motion to

compel.

270.00

7/15/2014

MMR

1.60

Review and revise motion for compliance with sale

order (1.0); phone call with Harold Israel (.3); locate

and send H. Israel relevant documents (.3).

1,040.00

7/21/2014

CS

0.50

Telephone conference with FT. Israel re motion to

compel.

450.00

7/21/2014

CS

1.50

Revised reply re motion to compel filed against

Green Tree.

1,350.00

7/21/2014

MMR

2.50

Review of response and objection to motion to

compel (.5); prepare reply to same (1.0); office

conference with C. Steege to discuss and revise

same (1.0).

1,625.00

7/22/2014

MMR

0.10

Phone conference with C. Steege regarding Hilco

numbers.

65.00


SECURED CREDITORS MATTER NUMBER- 10032

3/12/2014

MMR

0.30

Phone call with lender's counsel re status of case.

195.00

3/13/2014

MMR

0.50

Phone call with P. Siddiqui regarding lenders

position.

325.00

3/14/2014

MMR

1.50

Review of loan documents received from debtor's

counsel in anticipation of meeting with debtor.

975.00

3/18/2014

MMR

0.50

Phone call with lender's counsel.

325.00

3/20/2014

MMR

0.50

Review of UCC search.

325.00

3/24/2014

MMR

0.80

Review of loan documents for Redridge loan

facility.

520.00

3/24/2014

MMR

0.80

Review of motion for adequate protection by

insurance financer (.5) and confer with C. Steege on

same (.3).

520.00

3/25/2014

LSR

2.70

Conducted research on whether acceleration clause

is enforceable in bankruptcy.

1,566.00

3/25/2014

MMR

2.60

Research regarding enforceability of yield

maintenance fees/exit fees in bankruptcy (2.2)p

meeting with L. Raiford to discuss and assign

subsequent research (.4).

1,690.00

3/25/2014

MMR

0.20

Phone conferences with counsel for BankDirect

regarding request for adequate protection.

130.00

3/28/2014

MMR

0.30

Negotiate with insurance financer regarding terms

of stipulation.

195.00

3/31/2014

MMR

2.30

Negotiations with BankDirect regarding terms of an

agreed order on adequate protection (.5); review of

policies and revise stipulation (1.0); subsequent

calls with counsel for BankDirect (.8).

1,495.00

3/31/2014

CS

0.30

Telephone conference with insurance lawyer re

agreed order re adequate protection.

270.00

4/1/2014

MMR

1.00

Attend hearing on employee and plan motions and

on BankDirect's request for adequate protection (.5);

revise and circulate draft stipulation on BankDirect

motion (.5).

650.00


FEE PETITION MATTER NUMBER- 10059

3/14/2014

LSR

1.80

Drafted Jenner retention materials.

1,044.00

3/15/2014

LSR

1.50

Revised Jenner retention materials.

870.00

3/19/2014

MMR

0.20

Review and revise Jenner retention papers.

130.00

3/20/2014

MMR

0.70

Revise Steege affidavit and retention motion.

455.00

5/28/2014

CS

0.30

Prepared application to retain accountants.

270.00

5/28/2014

MMR

0.50

Review of correspondence to proposed accountant

and attachments (.2); revise and file motion to retain

same (.3).

325.00

10/28/2014

CS

1.50

Worked on fee petition.

1,350.00

6.50

PROFESSIONAL SERVICES

$4,444.00

MATTER 10059 TOTAI

$4,444.00



5/8/2014

CS

0.50

Email re Oak Brook operations and assumption.

450.00

5/8/2014

CS

0.50

Assigned Oak Brook lease and worked on papers.

450.00

5/8/2014

MMR

0.40

Conference with counsel for Sleepys regarding lease

negotiations (.2) follow up with R. Block regarding

same (.2).

260.00

5/9/2014

CS

0.10

Email to B. Young re lease assignment.

90.00

5/9/2014

MMR

0.80

Negotiations with B. Yong and with Sleepys

regarding Rush Street lease (.6); relay conversations

to C. Steege (.2).

520.00

5/12/2014

MMR

0.30

Discussions with R. Block regarding Rush Street

lease and negotiations with counsel.

195.00

5/13/2014

MMR

0.70

Attend hearing on lease rejection motions and

executory contracts.

455.00

5/13/2014

MMR

0.50

Email with purchaser regarding Cambridge lease

and FF&E issue (.2); review of lease schedule and

begin prep of rejection motions (.3).

325.00

5/14/2014

MMR

0.50

Review of research on shopping center issue (.4)

and phone call with B. Yong regarding D&K offer

(.1).

325.00

5/14/2014

MMR

0.40

Emails with PTilco regarding lease rejection issues.

260.00

5/14/2014

LSR

1.40

Conducted research on standard for shopping center

under section 365 in response to B. Yong's

argument that her store was a shopping center.

812.00

5/15/2014

MMR

1.40

Prepare motions to reject Cambridge and Rockville

leases (.5); correspondence with landlords on same

(.2); continued negotiations on Rush Street lease and

phone call with landlord counsel and Sleepy's

counsel on same (.7).

910.00

5/15/2014

TDH

1.50

Readied 2 rejection of lease motions for ECF filing

(.5); ECF filed same via Court's CM/ECF service

(.5); service of same (.5).

487.50

5/16/2014

MMR

0.20

Email correspondence with counsel for Sleepy's

regarding lease assumption.

130.00

5/18/2014

MMR

0.40

Revise assignment form (.3) and send same to

Sleepy's counsel (.1).

260.00



5/19/2014

CS

0.10

Email with M. Fenton re lease rejection and need for

Chaim to remove property.

90.00

5/19/2014

CS

0.30

Telephone conference with M. Berkhoff re lease

assignments.

270.00

5/19/2014

MMR

1.00

Phone call with counsel for San Diego regarding

rejection and calculation of stub rent (.3); phone call

with S. Lorber regarding San Francisco lease; (.1);

revise lease excel worksheet to reflect current

actions (.2); correspondence and negotiation with

Cambridge landlords regarding rejection issues (.3);

email with R. Fogal regarding rent calculation (.1).

650.00

5/20/2014

CS

1.00

Revised Rush Street lease assignment.

900.00

5/20/2014

MMR

0.80

Review and revise lease assignment papers.

520.00

5/20/2014

MMR

0.80

Attend hearing on rejection motions, motion to

compel.

520.00

5/21/2014

CS

0.70

Telephone conference with G. Catalano re Rush

Street lease.

630.00

5/21/2014

CS

0.20

Revised motion to answer and assign lease (.1);

email to M. Fenton (.1).

180.00

5/21/2014

MMR

3.00

Phone conference with Sleepy's regarding revisions

to assumption agreement (.7); revisions to

assumption agreement (.5); draft motion and order

on same (1.4); edlts to same (.4).

1,950.00

5/21/2014

MMR

0.50

Confer with Hilco regarding status of lease

marketing efforts and follow up on access issue

regarding Cherry Street lease.

325.00

5/21/2014

MMR

0.30

Prepare rejection motion for Cambridge parking lot

lease.

195.00

5/22/2014

MMR

1.00

Review of modifications to assignment agreement

(.5) and revise order for assignment (.5).

650.00

5/22/2014

MMR

0.50

Phone conference with 1). Folds regarding DC lease

(.1); follow up email on same (.1); discuss status of

leases with C. Steege and begin rejection

preparations for San Fran, Philly and DC (.3).

325.00



6/2/2014

MMR

0.40

Phone conference with C. Steege regarding Cherry

Street lease (.2); review of M. Desmond motion

relating to same (.2).

260.00

6/2/2014

CS

0.20

Telephone conference with M. Desmond re Chicago

lease.

180.00

6/2/2014

MMR

0.10

Phone call with B. Yong regarding outstanding issue

from closing of Sleepy's transaction.

65.00

6/3/2014

MMR

0.50

Revise lease worksheet and circulate same to C.

Steege.

325.00

6/3/2014

MMR

0.10

Email correspondence with San Diego landlord

regarding postpetition rent amount.

65.00

6/3/2014

MMR

0.10

Review of status update provided from R. Block

regarding marketing of leases.

65.00

6/3/2014

MMR

0.50

Attend hearing on lease rejections and other

motions.

325.00

6/4/2014

MMR

0.10

Discuss Cherry street lease issues with C. Steege.

65.00

6/4/2014

MMR

0.10

Email to R. Block regarding Sleepy's order.

65.00

6/4/2014

CS

0.30

Telephone conference with M. Desmond re property

inspection.

270.00

6/6/2014

MMR

0.10

Communicate with NY landlord regarding post

petition rent due.

65.00

6/6/2014

CS

0.20

Email M. Desmond re lease issues.

180.00

6/10/2014

MMR

0.20

Email with R. Block and landlord for LA ground

lease regarding potential deal.

130.00

6/11/2014

MMR

0.20

Correspond with Tyson's Corner landlord regarding

postpetition rent and pay same.

130.00

6/12/2014

MMR

0.10

Confer with C. Steege regarding postpetition rent at

San Diego.

65.00

6/12/2014

CS

0.30

Telephone conference with M. Berkoff re parking

lot lease.

270.00

6/13/2014

LSR

1.90

Responded to inquiries regarding rental rates for

sub-lessors.

1,102.00

6/13/2014

MMR

0.30

Correspond with R. Block regarding status of lease

negotiations.

195.00



6/16/2014

MMR

0.20

Locate and send lease information to R. Block and

communications on same.

130.00

6/18/2014

MMR

0.20

Email correspondence with R. Block regarding

Sleepy's lease/assignment.

130.00

6/18/2014

MMR

0.40

Office conference with C. Steege regarding

Escondido lease (.2); phone conference with M.

Gram (attorney for landlord) regarding same (.2).

260.00

6/19/2014

CS

0.20

Telephone conference with Hilco re lease sales.

180.00

6/19/2014

MMR

0.20

Phone conference with Elilco regarding lease issues.

130.00

6/23/2014

MMR

0.20

Correspond with New York landlord attorney

regarding timing of rejection/lease payments.

130.00

6/23/2014

MMR

0.30

Phone call to security team (.2) and emails to

Sleepy's/Landlord regarding access issue (.1).

195.00

6/24/2014

CS

0.10

Office conference with M. Root re Chicago lease.

90.00

6/24/2014

CS

0.20

Email with attorney for Chicago landlord re

settlement of claims.

180.00

6/24/2014

MMR

0.70

Confer with C. Steege regarding status of Chicago

lease and potential rejection of same (.2); further

conference with C. Steege regarding landlord

position and prepare motion to reject same (.5).

455.00

6/24/2014

MMR

0.50

Prepare for (.1) and attend hearing on motion to

compel regarding Goose Island (.4).

325.00

6/26/2014

CS

0.30

Revised lease objection motions.

270.00

6/26/2014

MMR

1.20

(Prepare and file motions to reject NY, oral parking

lot lease, and Chicago leases.

780.00

6/26/2014

MMR

0.30

Email to R. Block regarding status of lease

marketing (.1); review of lease rejection worksheet

and calculate costs of anticipated rejection of NY

lease (.2).

195.00

6/27/2014

MMR

0.50

Correspond with attorney for New York landlord

regarding amounts due for NY postpetition rent (.3)

and perform calculations based on spreadsheet data

(.2).

325.00



6/30/2014

MMR

0.70

Coordinate with Hilco to confirm receipt of keys for

TMY location (.2); phone conference with M.

Desmond regarding rejection claim for Chicago (.2)

review of landlord position in LA negotiations and

email to R. Block on same (.3).

455.00

6/30/2014

MMR

0.20

Review M. Desmond email regarding lease rejection

issue (.1); follow up with M. Patterson on same (.1).

130.00

6/30/2014

CS

0.30

Telephone conference with M. Desmond re Goose

Island lease.

270.00

6/30/2014

CS

0.20

Telephone conference with M. Root re Goose Island

position in court.

180.00

7/1/2014

CS

0.10

Telephone conference with M. Root re Goose Island

lease issue.

90.00

7/1/2014

MMR

0.80

Review of M. Desmond filing on lease rejection

issue and emails with C. Steege regarding same.

520.00

7/1/2014

MMR

0.70

Attend Calumet hearing on lease issues (.5); report

on same to C. Steege (.2).

455.00

7/2/2014

MMR

1.50

Prepare for hearing on lease rejection motion for

Cherry Street property, including review of cases

cited (.8); participate in hearing (.5); report on same

to C. Steege (.2).

975.00

7/7/2014

MMR

1.10

Email to Debtor's counsel regarding NY lease and

payment status (.1); confer with C. Steege regarding

Cherry street and motion for reconsideration (.2);

email correspondence with LA landlord attorney

regarding proposal and rent due (.1); review of

motion filed by LA landlord attorney (.2); phone

call with F. Buckely (.1); report on same to C.

Steege (.1); email to R. Block regarding status

update (.1); phone conference with C. Steege

regarding motion for reconsider (.2).

715.00

7/8/2014

MMR

0.40

Email correspondence with C. Steege and R. Block

regarding offer for LA (.1); convey offer to

landlord's counsel (.1); follow up regarding same

(.2).

260.00

7/8/2014

MMR

1.10

Draft and circulate motion for reconsideration

regarding Goose Island lease.

715.00



7/9/2014

MMR

0.40

Revisions to motion for reconsideration.

260.00

7/10/2014

MMR

0.70

Phone call with NY Landlord regarding lease and

review of calculation of admin claim (.5);

negotiations with LA landlord (.2).

455.00

7/10/2014

MMR

0.80

Revisions to motion for reconsideration (.4); phone

call with C. Steege and M. Desmond (.3); draft

email to M. Desmond (.1).

520.00

7/10/2014

CS

0.50

Telephone conference with M. Desmond re lease.

450.00

7/11/2014

MMR

1.50

Review of New York lease amounts owed and

communicate with Trustee on same (.2);

negotiations with LA landlord and emails with team

on same (.6); revise motion for extension of time on

leases and file (.7).

975.00

7/11/2014

CS

0.20

Telephone conference with California landlord re

settlement.

180.00

7/11/2014

CS

0.10

Emails re California landlord settlement.

90.00

7/14/2014

MMR

0.20

Prepare memo to C. Steege regarding NY lease and

calculation of admin rent (.2).

130.00

7/14/2014

MMR

0.70

Phone conference with F. Buckley regarding LA

deal (.1); research issue regarding subtenant rent

(.4); phone conference with F. Buckley regarding

motion to compel (.1); conference with A. Allen

regarding hearing (.1).

455.00

7/15/2014

AMA

1.00

Prepared for and attended hearing re extending time

to assume or reject lease.

580.00

7/15/2014

MMR

0.20

Correspond with F. Buckley regarding lease (.1) and

A. Allen regarding hearing (.1).

130.00

7/16/2014

CS

0.40

Revised motion to reconsider.

360.00

7/16/2014

MMR

0.70

Attend hearing on lease extension motion.

455.00

7/16/2014

MMR

0.80

Revise and file motion for reconsideration on Goose

Island lease.

520.00

7/16/2014

MMR

0.10

Respond to NY landlord attorney voice mail.

65.00

7/17/2014

MMR

0.10

Respond to NY landlord inquiry regarding lease.

65.00



7/31/2014

MMR

0.80

Follow up regarding LA lease rejection issues (.2);

prepare declaration for M. Gilligan (.6).

520.00

7/31/2014

LSR

0.80

Prepared LA sublease assignment motion for filing.

464.00

8/4/2014

MMR

0.20

Revise Gilligan declaration.

130.00

8/5/2014

MMR

0.40

Phone conference with School Green attorney

regarding security deposit (.3); review of SOFA for

same and email to E. Masters (.1).

260.00

8/7/2014

MMR

0.50

Review of lease assignment documentation

circulated by F. Buckley.

325.00

8/8/2014

MMR

0.80

Confer with Trustee regarding offer to settle lease

issue with C&A Marketing and prepare proposal for

same.

520.00

8/11/2014

MMR

0.50

Settlement communications and conference calls

with FI. Isreal regarding June rent issue.

325.00

8/11/2014

MMR

0.20

Phone conference with F. Buckley regarding lease

assignment issues.

130.00

8/13/2014

MMR

0.30

Email settlement communication to H. Israel.

195.00

8/13/2014

MMR

0.70

Revisions to form assignment and waiver circulated

by F. Buckley and discuss same with C. Steege.

455.00

8/14/2014

CS

0.20

Reviewed LA assignment documents.

180.00

8/14/2014

MMR

0.20

Correspond with F. Buckley regarding lease

assignment.

130.00

8/15/2014

MMR

1.10

Phone call to H. Israel regarding settlement (.1);

prepare and send discovery regarding June rent

issue (1.0).

715.00

8/18/2014

MMR

0.30

Teleconferences with II. Israel regarding settlement.

195.00

8/18/2014

MMR

0.20

Review of amended lease assignment documents

and phone call with F. Buckley on same.

130.00

8/18/2014

CS

0.20

Telephone conference with creditor re claim.

180.00

8/19/2014

MMR

0.60

Draft agreed order resolving June rent issue and

correspondence with H. Israel regarding same.

390.00

8/20/2014

MMR

0.50

Review of M. Desmond motion for admin claim

(.2); office conference with C. Steege on same (.2);

review UAL case (.1).

325.00



8/27/2014

MMR

1.30

Prepare for hearing on Goose Island motion for

admin claim (.6); attend hearing (.7).

845.00

8/27/2014

CS

0.20

Office conference with M. Root re Goose Island

motion.

180.00

8/28/2014

MMR

0.20

Review of order regarding June rent and email to H.

Israel regarding same.

130.00

9/16/2014

MMR

0.50

Review of discovery received from IAC Goose

island.

325.00

9/16/2014

MMR

0.20

Prepare settlement communication to M. Desmond.

130.00

9/17/2014

MMR

0.70

Settlement communications with M. Desmond (.3);

review of pre-petition payments and proof of claim

in light of preference exposure (.4).

455.00

9/22/2014

MMR

0.10

Phone call to M. Desmond regarding settlement

discussions.

65.00

9/23/2014

MMR

0.90

Phone conference with M. Desmond regarding

proposal and review of email incorporating same

(.3); research regarding market storage rates and

preparation of counter proposal (.6).

585.00

9/24/2014

MMR

0.80

Research regarding treatment of rent as admin

expenses pre 1984.

520.00

9/25/2014

MMR

1.50

Prepare draft discovery requests and 30(b)(6)

deposition notice to M. Desmond.

975.00

9/25/2014

MMR

0.40

Review of SOFA and lease in connection with

preference analysis (.3) and confer with L. Raiford

regarding the preparation of a complaint (.1).

260.00

9/25/2014

LSR

2.10

Drafted preference complaint against IAC Goose

Island.

1,218.00

9/26/2014

CS

1.30

Revised discovery re Cherry St. lease dispute.

1,170.00

9/26/2014

CS

0.70

Revised Cherry St. preference complaint.

630.00

9/26/2014

MMR

1.40

Review and edit preference complaint (1.3);

correspondence with M. Desmond regarding same

(.1).

910.00

9/26/2014

MMR

0.50

Review and revise discovery to M. Desmond.

325.00

9/26/2014

LSR

0.80

Edited IAC Goose Island preference complaint.

464.00



9/26/2014

TDH

0.30

Readied Complaint versus Cherry Street landlord

for ECF filing.

97.50

9/30/2014

MMR

0.80

Review of email from M. Desmond regarding

30(b)(6) exam and C. Steege response (.1); begin

work on discovery responses (.7).

520.00

10/3/2014

MMR

3.00

Research regarding § 502(d) as it relates to

administrative claims (.7); prepare motion

adjourning hearing on administrative claims motion

(.8); respond to Cherry Street landlord discovery

requests (1.5).

1,950.00

10/6/2014

CS

0.20

Office conference with M. Root re Cherry Street

discovery.

180.00

10/6/2014

MMR

0.70

Revise discovery responses to Cherry Street

discovery (.5); email correspondence with M.

Desmond regarding Rule 26(f) conference (.2).

455.00

10/7/2014

CS

0.40

Participated in conference with M. Desmond re

discovery.

360.00

10/7/2014

MMR

0.50

Prepare for (.1) and participate in meet and confer

with M. Desmond (.4).

325.00

10/7/2014

MMR

0.80

Review of caselaw regarding new value defense in

context of leases.

520.00

10/8/2014

MMR

0.50

Review of cases circulated by M. Desmond

regarding lease administrative claim.

325.00

10/9/2014

MMR

0.50

Prepare motion to adjourn November 12 trial date

(.4) and email correspondence with M. Desmond

regarding same (.1).

325.00

10/13/2014

CS

1.00

Revised answers to Cherry Street landlord

discovery.

900.00

10/13/2014

MMR

1.00

Review and revise discovery responses (.3); locate

and prepare documents for production (.7).

650.00

10/14/2014

CS

0.20

Reviewed Hilco subpoena.

180.00

10/14/2014

MMR

0.50

Review of documents to be produced.

325.00



10/15/2014

MMR

0.80

Office conference with L. Raiford regarding

Calumet hearing on continuance motion (.2); email

correspondence with M. Desmond on same (.1);

review of documents to be produced (.5).

520.00

10/16/2014

CS

0.50

Office conference with M. Desmond re settlement.

450.00

10/16/2014

MMR

0.70

Phone conference with M. Desmond regarding

potential settlement (.5^Jfollow up correspondence

with M.. Desmond regarding terms of agreement

(.2).

455.00

10/17/2014

MMR

0.60

Edit motion to approve global settlement with IAC

Goose Island.

390.00

10/20/2014

CS

0.50

Revised IAC Goose Island settlement agreement.

450.00

10/20/2014

MMR

0.30

Review of modifications to settlement proposed by

M. Desmond (.1) and respond to M. Desmond re

same (.2).

195.00

10/21/2014

MMR

0.60

Revised 9019 motion (.4) and coordinate filing of

same (.2).

390.00

10/28/2014

MMR

0.90

Review of settlement motion and attend Court

hearing on same (.7); follow up correspondence

with M. Desmond regarding timing of settlement

execution (.2).

585.00

10/29/2014

MMR

0.10

Email with M. Desmond regarding settlement

agreement.

65.00

127.80

PROFESSIONAL SERVICES

$81,497.50

MATTER 10083 TOTAL

$81,497.50


TERMINATION OF 401 (K) PLAN MATTER NUMBER- 10091

3/19/2014

MMR

0.50

Review of 401(k) issues.

325.00

3/20/2014

RDS

Conferred with M. Root re bankruptcy matter and

related 401(k) plan items (.2)j reviewed and studied

materials re same (1.3); conferred with HR contact

re same (.2).

1,105.00

3/20/2014

MMR

0.40

Phone call with R. Sinnappan regarding plan

termination issue (.2); review of plan termination

documents (.2).

260.00

3/21/2014

RDS

2.00

Continued work re bankruptcy matter and related

401 (k) plan termination items (.1); reviewed

materials and guidance and emails re same (1.6);

telephone conference with plan third party

administrator re same (.2); conferred with M. Root

re same (.1)

1,300.00

3/21/2014

MMR

0.50

Correspond with debtor regarding benefits issues.

325.00

3/24/2014

RDS

0.10

Continued work re plan termination and

communicated with M. Root re same.

65.00

3/24/2014

CS

0.10

Telephone conference with DOL Attorney re 401(k)

plan.

90.00

3/24/2014

MMR

1.00

Communications with company and employees

regarding 401 (k) plan termination issues.

650.00

3/25/2014

RDS

3.00

Continued work re retirement plan termination (. 1);

reviewed and studied plan materials re same (1.2);

communicated with third party administrator re

same (.2); conferred with C. Steege and M. Root re

same (.2); prepared plan documentation re plan

termination and plan trustee/administrator

designation changes (1.3).

1,950.00

3/26/2014

RDS

1.00

Continued work re retirement plan termination (.1);

finalized plan documentation re plan termination

and plan trustee/administrator designation changes

(.2); office meetings with C. Steege and M. Root re

same (.2); communicated and worked with third

party administrator re same (.5).

650.00



4/2/2014

LTYX

0.20

Attended to request for plan termination document.

65.00

4/2/2014

MMR

1.00

Meeting with Trustee to discuss issue relating audit

of plan in connection with termination (.2); drafting

motion to pay plan audit fees (.8).

650.00

4/2/2014

MMR

0.20

Establish voice-mail box for callers regarding plan

termination (.1) and revise script for same (.1).

130.00

4/2/2014

AMY

0.20

Filed motion re plan termination.

40.00

4/3/2014

RDS

1.20

Continued work re plan termination related items

and reviewed materials re same (.3); telephone

conferences with plan auditor re same (.2);

conferred with C. Steege re same (.1); reviewed and

provided comment re plan termination and plan fee

asset motion (.6).

780.00

4/3/2014

MMR

1.20

Prepare and revised plan termination motion (1.0);

incorporate feedback from R. Sinnappan regarding

benefits provisions (.2).

780.00

4/3/2014

LSR

0.40

Cite checked motion to liquidate 401k plan.

232.00

4/4/2014

RDS

0.50

Continued work re plan termination motion and

other items.

325.00

4/4/2014

MMR

0.90

Review of current draft of plan termination and fees

motion (.6); phone conference with C. Steege

regarding same (.2): review of case law supporting

plan termination motion (.1).

585.00

4/4/2014

CS

0.50

Revised motion re plan expenses.

450.00

4/5/2014

RDS

0.10

Communicated with C. Steege re plan termination

item.

65.00

4/6/2014

CS

0.10

Responded to email from employee re 401(k).

90.00

4/7/2014

RDS

0.30

Continued work re Calumet retirement plan

termination issues and materials.

195.00

4/8/2014

RDS

1.80

Drafted participant communication notice re

Calumet plan termination and needed distribution

elections (1.5); communicated with C. Steege re

same (.1); reviewed materials re same (.2).

1,170.00

4/8/2014

MMR

0.40

Review of decision in Mid-States regarding plan

termination issues.

260.00



6/12/2014

RDS

1.50

Continued work re plan termination and distribution

items (1.2), and communicated with Securian and

Millenium re same (.3).

975.00

6/13/2014

RDS

1.00

Prepared for and attended conference call with

Millenium re default rollover process.

650.00

6/16/2014

RDS

1.00

Continued work re plan termination, distribution

and administrative items.

650.00

6/17/2014

RDS

0.50

Continued work re plan termination, distribution

and administrative items.

325.00

6/19/2014

RDS

0.80

Continued work re finalization of plan distributions

and administration (.6), and communicated with

Securian and Millenium re same (.2).

520.00

6/20/2014

RDS

0.30

Continued work re plan matters.

195.00

6/23/2014

RDS

0.50

Continued work re plan audit by reviewing auditor

inquiries (.4) and communicated with K. Kyrk re

same (.1).

325.00

6/25/2014

RDS

1.30

Worked on participant communications re final

change to get distributions (.7); studied and prepared

materials re same (.6).

845.00

6/26/2014

RDS

1.50

Finalized participant notice materials re deadline to

make distribution elections and automatic rollovers

to Millenium.

975.00

6/30/2014

RDS

1.00

Continued work re plan distributions and audit items

(.8), and communicated with Securian and Sikich re

same (.2).

650.00

7/1/2014

RDS

0.50

Continued work re 401k plan administration and

termination (.4), and communicated with Securian

re same (.1).

325.00

7/2/2014

RDS

0.50

Continued work re 401k plan audit items.

325.00

7/7/2014

RDS

1.00

Continued work re administration and audit issues

and items re 401k plan (.7), and communicated with

plan auditors and plan participants re same (.3).

650.00



7/8/2014

RDS

4.00

Continued work re 401k plan audit (.1); finalized

participant communications and conferred with C.

Steege re same (.9); reviewed and studied 11R files

re requested participant forms and materials re same

(2.5); continued work re plan distributions and

communicated with Securian re same (.5).

2,600.00

7/8/2014

M.XP

Reviewed index and case files to pull boxes for R.

Sin nap pan.

60.00

7/9/2014

RDS

2.00

Continued work re 401k plan audit (.1); reviewed

and provided materials re requested information and

materials re same (1.9).

1,300.00

7/10/2014

RDS

1.50

Prepared for and attended conference call with

Securian re remaining steps to terminating plan and

5500 issues (.8); reviewed materials and

communicated with C. Steege re same (.7).

975.00

7/15/2014

RDS

0.70

Attended call with Sikich, 401k plan auditor, re

audit items.

455.00

7/16/2014

TDH

0.50

Located employee address information for R.

Sinnapan.

162.50

7/23/2014

RDS

0.20

Continued work re plan distributions from 401(k)

plan.

130.00

7/24/2014

RDS

2.00

Reviewed files and provided materials re items

required for 401k plan audit (1.0); reviewed auditor

engagement letter and conferred with C. Steege re

desired edits (1.0).

1,300.00

7/24/2014

CS

0.20

Reviewed auditor letter re plans.

180.00

7/28/2014

RDS

0.70

Continued work re plan administration items re plan

termination and audit.

455.00

7/28/2014

MXP

0.50

Researched for current mailing address for Philip J

Johnson, Juan Feliciano and Raymond J Kudra.

100.00

7/28/2014

TDH

0.70

Located employee address information for R.

Sinnapan.

227.50

7/29/2014

RDS

0.30

Continued work re plan wind-down items.

195.00



4/24/2014

UPS tracking# 1Z6134380192452743 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380192453242 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380192531836 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193197205 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193312259 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193323872 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193383772 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193427797 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193549129 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193588766 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193604078 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380193908964 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380194052949 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380194196786 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380194789225 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380194852843 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380194991854 Inv# 00000613438174

7.27

4/24/2014

UPS tracking# 1Z6134380190348860 Inv# 00000613438184

7.27

4/24/2014

UPS tracking# 1Z6134380194371952 Inv# 00000613438184

7.27

4/24/2014

UPS tracking# 1Z6134380194403917 Inv# 00000613438184

7.27

4/25/2014

Postage Nque

2.59

4/25/2014

Photocopy-NQue

.33

4/26/2014

UPS tracking# 1Z6134380194371952 Inv# 00000613438184

12.35

4/27/2014

Clerk of Court Fee; ELAN CORPORATE PAYMENT SYSTEMS;

04/27/2014; Fee for filing of Motion to Sell in USBC NDIL

176.00

4/28/2014

Color Network Printing

3.00

4/28/2014

Photocopy

21.89

4/28/2014

Photocopy-NQue

.66

4/28/2014

Postage Nque

.48

4/28/2014

UPS tracking# 292423P9GRE Inv# 00000613438184

7.30

4/29/2014

Postage Nque

1.44

4/29/2014

Photocopy

8.14

4/29/2014

Photocopy-NQue

.44

4/29/2014

UPS tracking# 1Z6134380194403917 Inv# 00000613438184

12.35

4/30/2014

Photocopy

4.73

4/30/2014

Lexis Researc

694.58

4/30/2014

Outside Professional Services-Document Technologies Inc:Job # 31975

Blow Back B&W 8.5x11 Requested by Susan Pripusich

.88

5/1/2014

Photocopy

.33

5/1/2014

Outside Professional Services-Document Technologies Inc:Job # 32036

Binding Requested by Catherine Steege

.51



5/22/2014

UPS tracking# 1Z6134380191177954 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380191338155 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380191514964 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380191515025 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380191734093 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380191833995 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380192522882 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193009917 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193043004 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193123105 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193163081 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193198133 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193350173 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193469975 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193578035 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193683180 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193729872 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193733894 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380193955127 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380194442983 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380194730117 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380194762904 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380194859140 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z6134380194875060 Inv# 00000613438224

6.99

5/22/2014

UPS tracking# 1Z613438NT90035167 Inv# 00000613438224

8.56

5/22/2014

UPS tracking# Q0146311088 Inv# 00000613438224

60.20

5/23/2014

Photocopy

152.35

5/23/2014

In-City Transportation; PETTY CASH; 05/23/2014 M. Patterson 5/22/14

cab fare from Debtor's office back to J&B

10.00

5/23/2014

Outside Professional Services-Document Technologies Inc:Job # 32509

Blow Back B&W 8.5x11 Requested by Toi Hooker

306.90

5/23/2014

UPS tracking# 1Z6134380193763585 Inv# 00000613438224

6.99

5/23/2014

UPS tracking# 1Z6134380194710577 Inv# 00000613438224

6.99

5/23/2014

UPS tracking# 1Z6134380197090214 Inv# 0000061343822,4

6.99

5/23/2014

Supplies; OFFICEMAX INCORPORATED; 05/23/2014

804.78

5/24/2014

In-City Transportation; US MESSENGER & LOGISTICS, INC.;

05/24/2014;MARC PATTERSON 900 W. BLISS ST, CHICAGO, IL

60642-4242 m. pattterson 14:30 05/22/14

51.45

5/24/2014

In-City Transportation; US MESSENGER & LOGISTICS, INC.;

05/24/2014; MARC PATTERSON 900 W. BLISS ST, CHICAGO, IL

60642-4242 undel 13:00 05/22/2014

52.50



5/28/2014

UPS tracking# 1Z613438O194071017 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134380194364086 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134380194411079 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134380194735096 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134380194844003 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134380194870976 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134380194958935 Inv# 00000613438224

6.99

5/28/2014

UPS tracking# 1Z6134381390391219 Inv# 00000613438224

232.17

5/28/2014

UPS tracking# 1Z6134381390596267 Inv# 00000613438224

22.51

5/28/2014

UPS tracking# 1Z6134381390751179 Inv# 00000613438224

35.99

5/28/2014

UPS tracking# 1Z6134381390919257 Inv# 00000613438224

16.30

5/28/2014

UPS tracking# 1Z6134381392460248 Inv# 00000613438224

30.72

5/28/2014

UPS tracking# 1Z6134381392804206 Inv# 00000613438224

231.36

5/28/2014

UPS tracking# 1Z6134381392819236 Inv# 00000613438224

58.25

5/28/2014

UPS tracking# 1Z6134381392884184 Inv# 00000613438224

38.23

5/28/2014

UPS tracking# 1Z6134381393891272 Inv# 00000613438224

8.33

5/28/2014

UPS tracking# 1Z6134381394435192 Inv# 00000613438224

75.34

5/28/2014

UPS tracking# 1Z6134381394596223 Inv# 00000613438224

58.25

5/28/2014

UPS tracking# 1Z613438NT91860148 Inv# 00000613438224

8.56

5/29/2014

Photocopy

4.40

5/29/2014

UPS tracking# 1Z6134381396943399 Inv# 00000613438224

96.18

5/29/2014

UPS tracking# 1Z6134380195637860 Inv# 00000613438234

37.13

5/29/2014

UPS tracking# 1Z6134381396943399 Inv# 00000613438234

14.30

5/31/2014

Westlaw Research

45.40

5/31/2014

Special Messenger Service; US MESSENGER & LOGISTICS, INC.;

5/31/2014

127.70

6/2/2014

In-City Transportation; PETTY CASH; 06/02/2014 A. Young 5/30/14 Cab

fare to and from Calumet Photographic

23.00

6/2/2014

Business Meals; PETTY CASH; 06/02/2014 A. Young 5/30/14 while at

Calumet Photographic

7.88

6/2/2014

In-City Transportation; PETTY CASH; 06/02/2014 A. Young 5/29/14 Cab

fare to Calumet Phot ographic

12.00

6/2/2014

Business Meals; PETTY CASH; 06/02/2014 A. Young 5/28/14 while at

Calumet Phot ographic

11.17

6/2/2014

In-City Transportation; PETTY CASH; 06/02/2014 J. Carreon 5/27/14 cab

fare to and from Calumet Photographic with Marc Patterson

20.50

6/2/2014

Business Meals; PETTY CASH; 06/02/2014 J. Carreon 5/29/14 while at

Calumet Ph otographic with Marc Patterson & Annette Young

54.55

6/2/2014

In-City Transportation; PETTY CASH; 06/02/2014 J. Carreon 5/29/14 cab

fare to Calumet Ph otographic with Marc Patterson & Anette Young

12.00

6/2/2014

Business Meals; PETTY CASH; 06/02/2014 J. Carreon 5/28/14 while at

Calumet Ph otographic with Marc Patterson & Annette Young

13.85



6/26/2014

UPS tracking# 1Z6134380197200907 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380197257320 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380197277764 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380198066703 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380198084667 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380198121812 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380198176399 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380198452750 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380198526420 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380198579445 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380198945656 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380198970271 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380199130864 Inv# 00000613438264

8.62

6/26/2014

UPS tracking# 1Z6134380199358486 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380199591170 Inv# 00000613438264

7.18

6/26/2014

UPS tracking# 1Z6134380199603808 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380199773385 Inv# 00000613438264

7.10

6/26/2014

UPS tracking# 1Z6134380199804912 Inv# 00000613438264

7.38

6/26/2014

UPS tracking# 1Z6134380197803588 Inv# 00000613438274

7.38

6/27/2014

Photocopy

14.32

6/28/2014

UPS tracking# 1Z6134380197803588 Inv# 00000613438274

12.35

6/28/2014

Special Messenger Service; US MESSENGER & LOGISTICS, INC.;

06/28/2014

5.25

6/30/2014

Westlaw Research

125.45

6/30/2014

Photocopy

2.86

6/30/2014

In-City Transportation; PETTY CASH; 06/30/2014;Annette Young, travel

to and from Calumet office 06/27/2014

23.00

7/1/2014

Photocopy

.44

7/2/2014

Photocopy

3.30

7/3/2014

Pacer Charges; PACER SERVICE CENTER; 07/03/2014 Period range

from 4/1/14-6/30/14

41.7

7/3/2014

Pacer Charges; PACER SERVICE CENTER; 07/03/2014 Period range

from 4/1/14-6/30/14

101.00

7/3/2014

Pacer Charges; PACER SERVICE CENTER; 07/03/2014 Period range

from 4/1/14-6/30/14

2.00

7/3/2014

Pacer Charges; PACER SERVICE CENTER; 07/03/2014

6.20

7/3/2014

Other -; PACER SERVICE CENTER; 07/03/2014; CHARGES FOR

4/1/2014-6/30/14.

1.00

7/3/2014

Other -; PACER SERVICE CENTER; 07/03/2014; CHARGES FOR

4/1/2014-6/30/14.

119.50



7/15/2014

UPS tracking# 1Z6134380193157810 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380193322962 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380193585956 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380194130882 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380194278018 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380194345838 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380194690803 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380194723027 Inv# 00000613438294

6.99

7/15/2014

UPS tracking# 1Z6134380194806134 Inv# 00000613438294

8.56

7/15/2014

UPS tracking# 1Z613438NT91531100 Inv# 00000613438294

117.04

7/16/2014

Photocopy

6.99

7/16/2014

UPS tracking# 1Z6134380195258654 Inv# 00000613438294

6.99

7/16/2014

UPS tracking# 1Z6134380199690241 Inv# 00000613438294

6.99

7/21/2014

Postage Nque

2.38

7/21/2014

Photocopy

.22

7/22/2014

Photocopy

1.98

7/23/2014

Photocopy

1.87

7/23/2014

Postage Nque

7.62

7/23/2014

UPS tracking# 1Z6134380193427233 Inv# 00000613438304

6.99

7/24/2014

Postage Nque

.69

7/24/2014

UPS tracking# 1Z6134381291766056 Inv# 00000613438304

6.31

7/26/2014

Special Messenger Service; US MESSENGER & LOGISTICS, INC;

07/26/2014

5.25

7/28/2014

Postage Nque

9.44

7/28/2014

Photocopy

1.32

7/28/2014

Postage Nque

19.99

7/31/2014

Photocopy

72.16

7/31/2014

Westlaw Research

11.69

7/31/2014

Lexis Research

422.46

7/31/2014

UPS tracking# 1Z6134380191708353 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380191765363 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380192133383 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380194440378 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195067977 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195129776 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195174164 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195453139 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195475115 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195620369 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195787985 Inv# 00000613438314

6.99

7/31/2014

UPS tracking# 1Z6134380195833460 Inv# 00000613438314

6.99



8/21/2014

UPS tracking# 1Z6134380199240987 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199330639 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199468116 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199523672 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199545470 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199565681 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199816856 Inv# 00000613438344

6.99

8/21/2014

UPS tracking# 1Z6134380199838814 Inv# 00000613438344

6.99

8/22/2014

Photocopy

55.88

8/26/2014

Color Network Printing

.50

8/27/2014

Postage Nque

10.76

8/31/2014

Westlaw Research

4.86

8/31/2014

Lexis Research

115.20

9/2/2014

Postage Nque

6.72

9/2/2014

Photocopy

3.85

9/3/2014

Postage Nque

3.57

9/3/2014

Outside Professional Services-Merrill Corporation:Job # 2467 Binding

(price includes cover Requested by Melissa Root

1.02

9/8/2014

Postage Nque

2.38

9/10/2014

Postage Nque

19.99

9/10/2014

UPS tracking# 1Z6134380190074432 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190075548 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190126573 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190259500 Inv# 00000613438374

8.52

9/10/2014

UPS tracking# 1Z6134380190266314 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190291564 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190514359 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190611226 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190834236 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190899186 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380190950299 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191074556 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191219284 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191250598 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191371369 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191499302 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191586477 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191766175 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380191875146 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380192054334 Inv# 00000613438374

6.96

9/10/2014

UPS tracking# 1Z6134380192154155 Inv# 00000613438374

6.96



9/22/2014

UPS tracking# 1Z6134381294951297 Inv# 00000613438394

6.28

9/23/2014

Postage Nque

5.95

9/24/2014

UPS tracking# 1Z6134380199465351 Inv# 00000613438394

6.96

9/29/2014

Photocopy

1.43

9/30/2014

Westlaw Research

18.60

10/7/2014

Pacer Charges; PACER SERVICE CENTER; 10/07/2014

6.60

10/7/2014

Pacer Charges; PACER SERVICE CENTER; 10/07/2014

87.10

10/7/2014

Pacer Charges; PACER SERVICE CENTER; 10/07/2014

2.10

10/7/2014

Pacer Charges; PACER SERVICE CENTER; 10/07/2014

4.00

10/7/2014

Pacer Charges; PACER SERVICE CENTER; 10/07/2014

27.1

10/7/2014

Pacer Charges; PACER SERVICE CENTER; 10/07/2014

13.50

10/8/2014

Postage Nque

7.19

10/9/2014

Postage Nque

.48

10/15/2014

Color Network Printing

1 54

10/15/2014

Photocopy

7.50

10/15/2014

Color Network Printing

1.87

10/15/2014

Photocopy

59.78

10/21/2014

Postage Nque

28.60

10/21/2014

Photocopy

11.00

10/23/2014

Photocopy

6.96

10/23/2014

UPS tracking# 1Z6134380190418221 Inv# 00000613438434

6.96

10/23/2014

UPS tracking# 1Z6134380192482247 Inv# 00000613438434

6 96

10/23/2014

UPS tracking# 1Z6134380193241237 Inv# 00000613438434

6.96

10/23/2014

UPS tracking# 1Z6134380195989703 Inv# 00000613438434

2.45

10/28/2014

Postage Nque

10.67

10/29/2014

Photocopy

700.32

10/31/2014

Westlaw Research

TOTAL DISBURSEMENTS

$31,029.53

MATTER 10067 TOTAL

$31,029.53




Summaries of

In re Calumet Photographic, Inc.

UNITED STATES BANKRUPTCY COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION
Dec 16, 2014
Case No. 14 B 08893 (Bankr. N.D. Ill. Dec. 16, 2014)
Case details for

In re Calumet Photographic, Inc.

Case Details

Full title:In re: CALUMET PHOTOGRAPHIC, INC, ET AL Debtor.

Court:UNITED STATES BANKRUPTCY COURT NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION

Date published: Dec 16, 2014

Citations

Case No. 14 B 08893 (Bankr. N.D. Ill. Dec. 16, 2014)