DONNELLY v. JOHNES et al.

P. S. Katzenbach, Jr., for complainant. David Harvey, Jr., for defendants William B. Crowther and others. Hawkins & Durand, for defendants Benjamin B. Pearce and others. Samuel A. Patterson, for defendants Charles P. Pridham and others. Howell Bros., for defendants Doyle & White. Claude V. Gerrin, for defendant Richard E. K. Rothfritz. Joseph McDermott, for defendant Charles McDermott. Stephen C. Cook, for defendants Ed. Kleinkauf and others. S. G. Naar, for defendant Richard Smith. Carroll Robbins, for defendants A. K. Leuckel & Co. and others.


(Syllabus by the Court.)

Bill by Richard A. Donnelly against Otis F. Johnes and others. Gen. Donnelly, the complainant, is the owner of a house and lot at Spring Lake, N. J. The house was built by the defendant Johnes under a contract dated the 1st day of October, 1896, and filed in Monmouth county clerk's' office. By the terms of the filed agreement, the contract price was to be paid in six installments, at different periods in the progress of the work. The contractor proceeded so far with the performance of the contract that he became entitled to receive the first five installments, all of which were paid to him by Gen. Donnelly, the last one on March 1, 1897, leaving only the final installment of $2,250 unpaid. The contractor, Johnes, now became financially embarrassed. A judgment was recovered against him by Charles Lewis, and execution and supplementary proceedings were taken thereon, and a restraint from payment was served on Gen. Donnelly on April 17, 1897; and in the latter part of May, 1897, Johnes abandoned the further prosecution of the work, leaving the house unfinished. Under the terms of the contract, the complainant's architect assumed charge, and finished, or nearly finished, the building, as it was stipulated he might, out of the contract price. The last work done on the building was that performed by one Reed, a plumber, employed by the complainant's architect, on August 4, 1897. On September 30, 1897, Gen. Donnelly accepted the building as completed, and directed the giving by his architect of a certificate of completion. Both before and after the failure of Johnes, the various subcontractors, and parties who furnished material or work to him, began to present to the owner notices to retain their moneys or orders from Johnes to pay them. The sum of all these claims exceeded the moneys due the contractor under the contract, and the complainant, having done a considerable amount of work on the building himself, directed his architect to certify the house to be finished,as stated, filed his bill of interpleader, and deposited the balance of the contract price in this court. No dispute is raised touching the expenditures by the complainant out of the contract price in finishing the building, and all the defendants admit that the $2,166.64 brought into court is the true sum remaining payable by the complainant under the contract. The defendants having filed their answers, none of them disputing the complainant's right, a decree for the complainant was taken that the defendants interplead, etc., and he was dismissed, with his costs of suit. Under the modern practice, these answers, which set up the various claims of the parties each against the other, will be taken to be their interpleadings, and the rights of the claimants on the fund will be determined upon the equities thus asserted. Hall v. Baldwin, 45 N. J. Eq. 866, 18 Atl. 976. At the hearing, all the parties agreed that the copies of notices set forth in the bill of complaint are correct, and that as to the time of the receipt of notices to, and orders on, the owner, the statements of the bill are to be taken as time, without further proof. They have been so used. Decree rendered.

P. S. Katzenbach, Jr., for complainant.

David Harvey, Jr., for defendants William B. Crowther and others.

Hawkins & Durand, for defendants Benjamin B. Pearce and others.

Samuel A. Patterson, for defendants Charles P. Pridham and others. Howell Bros., for defendants Doyle & White.

Claude V. Gerrin, for defendant Richard E. K. Rothfritz.

Joseph McDermott, for defendant Charles McDermott.

Stephen C. Cook, for defendants Ed. Kleinkauf and others.

S. G. Naar, for defendant Richard Smith.

Carroll Robbins, for defendants A. K. Leuckel & Co. and others.

GREY, V. C. (after stating the facts). The claims against the fund in court consist of four classes: First, stop notices served under the third section (now paragraph 38) of the mechanic's lien act; second, orders for payment given by Johnes, the contractor, upon Donnelly, the owner; third, a judgment entered April 12, 1897, and supplementary proceedings and a receivership thereunder, in the suit of Charles Lewis against Otis F. Johnes, the contractor, in Monmouth circuit court; and, fourth, an attachment issued out of the supreme court in the case of Harry A. Ashmore against Otis F. Johnes, on October 2, 1897.

The status of claims under orders (operating as equitable assignments) given by a contractor upon the contract moneys in the hands of the owner, in cases of building contracts which have been filed, etc., has been materially changed by the supplement to the mechanic's lien act (section 5) passed March 14, 1895. and to be found in 2 Gen. St. p. 2074, par. 41. This statute prescribes that, where the contract is filed, if the owner shall "for the purpose of avoiding the provisions of the act to which this is a supplement, or in advance of the terms of the contract, pay any money * * * on such contract, and the amount still due to the contractor after such payment has been made shall be insufficient to satisfy the notices served in conformity with the provisions of the act of which this is a supplement, such owner * * * shall be liable in the same manner as if no such payment had been made." The court of appeals, interpreting this act, has, in the case of Slingerland v. Binns, 56 N. J. Eq. 413, 39 Atl. 712, declared that this supplement changes the situation, and forbids the owner to pay any money in advance of the terms of the contract, if the effect may be that the amount unpaid will prove insufficient to satisfy notices served in conformity to the statute. The essential principle of this decision is its declaration that the effect of the supplement is to secure "to persons entitled to serve the statutory notice an inchoate lien upon the liability of the owner under the contract; such lien to become perfect on service of the notice before the liability matures, but to expire on such maturity if no notice has been given; for a notice served after maturity derives no aid from this provision. Of course, this inchoate lien does not impair the owner's right to protect himself against the consequences of any default upon the part of the contractor." In Leary v. Lamont, 42 Atl. 97, it was held in this court that the supplement of 1895, as expounded by the judgment of the court of appeals in the case of Slingerland v. Binns, had altered the previous operation of notices served under the old third section so that they no longer gave priority according to date of service, but, becoming inchoate liens as fast as the work was done or material furnished, they were perfected by service of notice, and chargeable on the fund pro rata, regardless of the order of priority of service of notice. In Association v. Williams, 42 Atl. 172, the supplement of 1895 and the judgment in Slingerland v. Binns were again discussed in this court. The construction declared in Leary v. Lamont, that noticing materialmen and laborers took pro rata and not in succession, according to date of service of notice, was approved. It was also held that there was no difference in equity between an order given by the contractor upon the owner for the price of material used in the building and a stop notice served by one who furnished material used in the building in conformity with the requirements of the third section of the original mechanic's lien act. On appeal, Association v. Williams was reversed (June Term, 1899; 43 Atl. 669), and the declaration in that case, and in Leary v. Lamont, that the stop notices should be paid pro rata, and not in full, according to order of service, was overruled. The court of appeals declared that, under the supplement of 1895, statutory stop notices still entitled the noticing partyto be paid in full in the order in which the notices were presented to the owner, as theretofore they had, and that the inchoate lien created by the operation of that supplement could be perfected only by serving the notice required by the provisions of the mechanic's lien act, and not by an order given on the owner by the contractor; that the inchoate lien attaches ab initio upon the liability of the owner to the contractor of a building for which workmen and materialmen furnish labor and material; that the lien becomes perfect only on service of the statutory notice before that liability matures, and expires on such maturity, if no notice be given.

The effect of this construction of the supplement of 1895, in cases where the contract price is payable by installments, is to require an ascertainment of the time when, under the terms of the contract, each payment comes to be due. Each person entitled under the lien act to serve a stop notice has an inchoate lien charged upon the contract price, which lien becomes complete on service of the stop notice before the liability on any installment matures, but expires on such maturity as to any claims on which no notice has been given. An owner, in order to protect himself, must therefore, as each installment comes to be due (if it is not needed to protect him from the contractor's default), apply it first to the payment of the moneys theretofore demanded by the stop notices served in conformity to the lien act, and, if any portion remains thereafter, he must apply that residue to the satisfaction of any equitable assignment which has been presented, or other lawful charge upon the funds in his hands, or pay it to the contractor.

Under the declaration of the law above recited, the workmen and materialmen obtained "an inchoate lien ab initio upon the liability of the owner to the contractor of the building." The liability of the owner to the contractor (subject to the performance of the agreement) begins with the delivery and filing of the contract, and therefore the agreed price must be held to stand, from the time of filing the contract (as to the workmen and materialmen who may furnish labor or material), as a fund charged to pay them for work or material supplied to the building, in case they serve on the owner the statutory notice before the installments mature, and discharged as to each installment that comes to maturity without such service of notice. If it were held that the lien of the workmen and material men arises only as each may furnish work or material to the building, then an order given by the contractor on the owner after the filing of the contract, but presented before the work was done, under which stop notices were subsequently served, would precede the inchoate lien of the workmen and materialmen, contrary to the purpose of the supplement of 1895, which is expounded by the court of appeals to intend that the contract price, until the time arrives when, by the terms of the contract, it becomes payable to the contractor, shall stand to respond, first to complete the contract, and next for the workmen and materialmen who serve the statutory notices. Almost all building contracts provide for payment in installments, which come to be payable, not at named calendar periods, but upon the completion of specified successive stages of the work. If the installment thus coming due next after the notices served satisfies them and leaves a residue, that residue is at the disposal of the contractor. If there be a deficiency, the unsatisfied notices will operate (with any others that may meanwhile be served) upon the next installment which comes to be due under the contract by the progress of the work, and so on until the final payment has been disposed of in the same manner.

Applying this interpretation of the supplement of 1895 to the case under consideration, it must be noted that the only installment affected is the last payment of $2,250; that the first charge against this is such sum as was necessary to secure the owner in completing the building under the terms of the contract. This sum has been expended, leaving a balance of $2,106.64, which has been paid into court in this cause. It is a matter of vital importance to ascertain the time when the liability of the owner in any installment sought to be applied by a notice matures, because it is only those notices which are served before that time that are effective. After maturity of the owner's liability, without notice served, the statutory inchoate lien expires as above stated. In the case under consideration, the terms of the contract prescribed that the final payment should be due (and thus matured the liability of the owner) "thirty days after completion and acceptance" of the building. It is shown without dispute, by the testimony of Gen. Donnelly, that the building was accepted as complete by a certificate of the architect to that effect, Issued on September 30, 1897. Thirty days after this period was October 30, 1897. The liability of the owner for the final payment matured on that day. All notices which perfected inchoate liens of workmen and materialmen must therefore have been served on or before October 30, 1897. Any residue remaining after satisfying these perfected liens became, on and after October 30, 1897, free from the operation of all liens under the statute, and applicable to the general use and direction of the contractor, by payment to him or to his order, or liable to charge as his property. A necessary consequence of this construction is that liens on the fund in favor of equitable assignees of the contractor and of his attaching creditors all fasten upon it as of the date on which they may respectively be lawfully charged, but subject to the superior rights of workmenand materialmen, whose Inchoate liens relate back to the beginning of the liability of the owner. These latter liens may be discharged (if perfected by proper notice) by payment out of the fund, or (if not so perfected) by the maturing of the liability of the owner. In either event, the residue of any matured portion of the fund becomes applicable to the payment of the charges upon it arising outside of the mechanic's lien act, in the order of their priority of service.

The claims by statutory notices, under the lien act, are quite numerous, and some of them are sharply disputed. As they are payable in the order of their service, they will be considered in that order. Those of them which have been efficiently served and sustained by proof will be directed to be paid in full from the fund, in their order of priority, treating them as superior liens which were a charge upon the fund. The residue of the fund, these superior liens being thus satisfied, will be applied to pay such other claims as may have been charged upon it. A notice to retain, to be in conformity with the provisions of the lien act, must be preceded by a demand upon, and a refusal of pay by, the contractor, it must be in writing, and must notify the owner of such demand and refusal, and of the amount due the noticing claimant, and the owner must be satisfied of the correctness of the demand. See 2 Gen. St. p. 2073, par. 38; Reeve v. Elmendorf. 38 N. J. Law, 125. The privilege of preferential payment out of the contract price fund is purely statutory. It becomes complete only when the statutory conditions are fulfilled. If these are not complied with, the owner has no right to pay, and the claimant no right to receive payment from him.

The first notice claimed to have been served on the owner, Gen. Donnelly, is that of Warren Balderson & Co., on December 29, 1896, by a notice in the form of a letter of that date, signed and sent by the claimant to him. The claim is so lacking in the requisites prescribed by the third section of the mechanic's lien act (now paragraph 38, p. 2073, 2 Gen. St.) that it cannot operate to retain any of the fund. The statute requires that the claimant shall make demand upon the contractor for payment of the money due him, and whenever he is refused he shall give notice in writing to the owner of such refusal, and of the amount due him and so demanded. This letter of Warren Balderson & Co. neither states a refusal of payment by the contractor, nor the amount demanded to be retained, nor is any proof made to support the claim. It must therefore be rejected.

The second notice claimed to have been served was that of Pullen and Wright, trading as Trenton Stair-Building Company. This notice fails because of the same defects noted in the claim of Balderson & Co., and also because the notice is that payment for future work then yet to be done would be demanded from Gen. Donnelly when it was finished. The statute contemplates a notice given after the work has been done, so that payment therefor might rightfully have been demanded. This claim is subsequently dealt with under another notice.

The third notice is claimed to have been served by William B. Crowther, Jr., on April 4, 1897, by a letter sent by mail to Gen. Donnelly. The nearest Mr. Crowther came to notifying Gen. Donnelly of the refusal required by the act is the statement in his note to him in these words: "I can't seem to get a settlement from Mr. Johnes, the builder." This phrase does not show any reason why he could not get a settlement. There may have been other reasons than a refusal of payment. Crowther may never have asked for a settlement. This letter certainly does not give any notice to Gen. Donnelly that Crowther had made a demand for payment upon Johnes, and received a refusal from him, and must be rejected as insufficient.

The next notice is claimed to have been served by Paul C. Taylor, by two letters sent by mail, one dated April 20, 1897. The other, of a somewhat later date, has been lost by the owner, Gen. Donnelly. The first letter on the subject is set forth in the bill, and is dated April 20, 1897, written by Taylor to Gen. Donnelly, who states in his bill that he received it about April 21, 1897. The letter is defective as a notice, because it gives no warning of any refusal of the contractor to pay upon demand made. The nearest phrase in this note to the statutory requirement is in these words: "Not having been paid in full as yet, thought I would drop you a line or so to inform you of the same." In the second letter Mr. Taylor inclosed his itemized bill, stating the amount due to be $34.95. When asked what was communicated with that itemized bill,—whether the letter communicated any statement to Gen. Donnelly,— he said he was not sure whether there was anything said. Then he stated that he thought he had told Gen. Donuelly in his second letter that he had demanded payment of Johnes, and had by him been referred to Gen. Donnelly. He declared he knew that he told Donnelly that Johnes had referred him (Taylor) to Donnelly for payment, and that he looked to the latter. These varying statements are the testimony of a witness in his own behalf, seeking to prove the contents of a lost letter which he claims operated as a notice that he had been refused payment on demand. I am unable to give them much weight, in view of their uncertainty and the interest of the witness. The second letter to Gen. Donnelly in all probability simply inclosed the itemized bill, as that was the only occasion for writing it. The varying statements of the witness are quite too uncertain to support a finding that the lost letter contained a notice to Donnelly of a refusal by Johnes to pay on demand.

The next notice was served by Doyle & White, on April 26, 1897, by letter, by mail,and notifies Gen. Donnelly that Johnes had given them an order on him for $450 for lumber furnished at his house, asking him to retain that amount from money due or to become due to Johnes, and to pay it to them (Doyle & White). No reference whatever is made to any demand or refusal by Johnes to pay. The letter amounts to no more than a notice that Johnes had given an order on Donnelly in favor of Doyle & White. This is in no sense such a notice as the statute requires, and this claim, as such, must be rejected. It is hereinafter considered as an equitable assignment.

The next notice was served on April 30, 1807, by Jacob Haberstick, by a letter by mail to Gen. Donnelly, dated April 28, 1897. This letter, like the last, gives no notice of any refusal by Johnes to pay on demand made. It simply states: "The amount due me on your cottage at Spring Lake, N. J., is $320. Please hold the amount for me,"—with a postscript as follows: "Mr. Johnes requested me to protect my claim." This letter is wholly insufficient to satisfy the requirement of the statute. Like the others, it gives no notice of any refusal or demand made upon the contractor for payment.

All of the above so-called notices were in fact letters sent by mail, in ordinary correspondence for the collection of money due, and in none of them is there any attempt to give notice of any refusal of Johnes to pay on demand made. At the time these letters were written there was no purpose that they should be statutory notices. Although they were in the style of business letters, yet, if the essential requirements of the statute did in fact appear in such correspondence received by Gen. Donnelly, the mere form of their expression would not have prevented the letters from operating as statutory notices. But they all lack these requirements, not only in form, but in substance. The claimants are now seeking to give to the correspondence an effect not contemplated by them when the letters were sent.

The next notice was served on Gen. Donnelly on the 30th day of April, 1897, by A. K. Leuckel & Co., for $760.23. This gives efficient notice to the owner of the amount of the debt due from Johnes for work and material done on the building in question, of demand made upon him for payment, and of his refusal, and the proofs made in behalf of these claimants show that the above amount of $700.23 is due to them under the provisions of the statute. This claim of A. K. Leuckel & Co., being the first efficient notice, is the first to be paid in full out of the fund in court.

The next notice is that of Charles Pridham, received by Gen. Donnelly by mail on May 13, 1897, demanding that he retain $232 for work done and materials furnished. The notice served complies with all the requirements of the statute. The claimant, when testifying in proof of his claim, stated that his contract was by parol; that he had served his notice on May 13, 1897; and in one part of his testimony he said that at that time he had not entirely completed the work. The claimant appears to be a truthful man, but is evidently unfamiliar with the giving of testimony, and his statements are somewhat confused. He afterwards explained that there was some extra work engaged, which he did, but that he had in fact completed his contract work before his notice was served; that the contractor acknowledged that he had more than finished it when he demanded his pay; and that the work which he did on the house after the original completion of his contract was some finishing and retouching of the floor, done "gratis," to please Mrs. Donnelly. I think the proofs offered fairly sustain the notice, and that Mr. Pridham is entitled to the $232 demanded by his notice. This is the second efficient notice and proof, and is to be secondly paid from the fund.

The next notice claims to have been served by Paul C. Taylor on June 12, 1897, for $34.95 for hardware. This is the same claim heretofore referred to as a letter received by Gen. Donnelly about April 21, 1897. When that letter was received, Gen. Donnelly requested Taylor to send him an itemized bill, which he did about June 12, 1897. This letter, containing the itemized bill, is not shown to have been any nearer to being a notification to the owner of a demand for payment from the contractor and his refusal to pay than was the first letter of April 20, 1897. Mr. Taylor testifies that he is not able to state clearly just what further he wrote, except that he told Gen. Donnelly that he was by Johnes referred to him, and that he should look to him for payment of the bill. As stated above, such correspondence, stating merely that the claimant was referred to an owner for payment, is not a notification of a demand and refusal.

The next claim is a notice served September 21, 1897. by Pullen and Wright, trading as Trenton Stair-Building Company, for $195 for work and materials, etc. The notice served sufficiently complies with the statutory requirements, and the proofs support it. This claim is entitled to be thirdly paid in full from the fund in court.

The next is the claim of Jonathan C. Ely, under a notice served October 4, 1897, for $180.31, stated to be for wages. The notice conforms to the statutes. This claimant is a carpenter, whose book was found not to be admissible, because lacking in essential incidents necessary to make it evidence. The claimant appears, by the type-written copy of his testimony, to have varied in his statements of the total amount of the partial payments made to him. When stating his items of work, price, and payments from his book, using it as a memorandum to refresh his memory, he is probably more accurate than when attempting to recall the matter by his

N. J.) unaided memory. Taking this part of his testimony as a guide, it shows that his account should be stated as follows:

114 1/4 days work, at $2.75 per day

$314 18

Deduct payments by Johnes on account

124 97

Actual balance due Jonathan G. Ely

$189 21

This sum ($189.21) was $2.90 more than he demanded. Though a demand for more than is due has been held to be fatal (Reeve v. Elmendorf, 38 N. J. Law, 133), a demand for less would seem to work no injury to any one but the claimant, who may be held to have waived the remainder due him. Mr. Ely is an illiterate man, and evidently made an error in his calculation in presenting his claim for a less sum than was due him. As this mistake led only to his own loss, his claim, as made for the lesser sum $186.31, should be admitted to payment. It is contended against its allowance that Ely had a private sub-agreement with Johnes, the contractor, whereby he (Ely) became a partner in Johnes' contract for building Gen. Donnelly's house. There appears to have been some talk of an agreement by which Ely should have part of Johnes' profits in the building contract, if there were any. The evidence is quite insufficient to show that there was any partnership, and too uncertain to sustain any contract, even for profit-sharing, as it appears there was neither perfected agreement between the parties nor arrangement as to how profits were to have been ascertained, nor what share either was to have received, nor any consideration for such an agreement. The profit-sharing seems to have been a discussed proposition rather than a contract. Moreover, it is expressly shown that there was a distinct agreement between Johnes and pay that the latter should receive $2.75 per day for his services. This claim of Jonathan G. Ely is entitled to be fourthly paid from the funds in court.

The next is the notice of Edward Ely, served October 4, 1897, for $50, stated to be for wages due him for carpenter work. The notice is in conformity to the requirements of the statute, and the proof shows demand made, and that there was a refusal to pay. This claimant also had an order given him by Johnes for the payment of this $50, which he presented to Gen. Donnelly on May 1, 1897. Under the supplement of 1895, above quoted, this order could only operate subject to such statutory notices as should be served. On October 4, 1897, Edward Ely served the notice above referred to, which is effective. This claim is entitled to be fifthly paid from the fund.

The notices of these two claims of Jonathan G. Ely and Edward Ely, served upon the owner and set forth in the bill, allege that the amounts, respectively, demanded, were due for wages earned as journeymen carpenters. The supplement of 1895, § 7 (2 Gen. St. p. 2075, par. 43), provides that the claims of journeymen or laborers shall have priority and preference over employers of labor, contractors, or materialmen for the payment of wages, without reference to the date of the service of notices. To secure this special statutory preference, the claimant must not only give the notice required by the act, but, when his claim is litigated, must prove by evidence that he is within the class of journeymen or laborers working for wages to which the statute gives this preference. The notices served to retain, etc., for these two claims, sufficiently notify the owner that they are within this specially preferred class. But the proof offered to support the claim.

: does not sufficiently show the claimants to have been, as alleged in the notices, journeymen claiming payment of wages. The result is that, while shown to be entitled to the position of workmen who have notice in conformity to the act, these two parties have not proven themselves entitled to the special.

; preference over employes, etc., given to those who are journeymen or laborers working for wages, etc., by the forty-third paragraph of the act (2 Gen. St. p. 2075). In this case this omission of proof happens to make no difference, as the fund is sufficiently large to pay in full all the workmen and materialmen who have served notices in conformity to the act.

The distribution of the fund in court, as above directed, stands at this stage as follows:

Claims above allowed, as noticed in conformity to the statute:

Fund in court $2,166 64 Deduct costs of this suit —— $

Claims above allowed, as noticed in conformity to the statute:

A. K. Leuckel & Co

$ 760 23

Charles Pridham

232 00

Jonathan G. Ely

186 31

Edward Ely

50 00

The foregoing are the only notices which appear to have conformed to the requirements of the statute, and to have become complete liens on the fund by service before the maturity, on October 30, 1897, of the liability of the owner under the contract, according to the construction of the supplement of 1895, as expounded by the court of appeals in Association v. Williams (June Term, 1899) 43 Atl. 669.

The residue of the fund, not necessary to pay these perfected liens, became, on October 30, 1897, free from all the inchoate liens under the mechanic's lien act, and was thereafter subject to such disposal as the contractor might make of it, and to the enforcement of such other liens or charges as his creditors might have established upon it. These other charges, thus relieved of the superior statutory liens, are, as against this residue of the fund, enforceable in the order of their priority, which I find to be as follows:

The first is the claim of Edward Kleinkauf under an order for $60 given by Johnes,the contractor, upon Gen. Donnelly, owner, and served upon him on April 1, 1897. This order operated by way of equitable assignment, subject to the statutory inchoate and subsequently perfected liens; which having been satisfied, this should be first paid out of the residue of the fund.

The next in point of date is the claim of Benjamin A. Pearce, receiver, under the supplementary proceedings on the judgment of Charles Lewis against Otis F. Johnes, the contractor, and execution thereunder issued April 12, 1897. This claim does not appear to be valid, under the construction given to the statute authorizing such proceedings. In Willson v. Salmon, 45 N. J. Eq. 257, 17 Atl. 815, the court of appeals held that, while the right of a judgment creditor to this relief against his debtor authorized the seizure of actually existing debts, money to become due by the future performance of a building contract is not such an existing debt. It is a mere inchoate right, upon which the statute does not operate. In that case, as in this, the supplementary proceedings were taken by a receiver to secure the final installment of a building contract before the contract had been performed. The court also held that, if a different conclusion had been reached, the receiver's claim could not have been superior to the noticing claimants under the lien law, because all the receiver could acquire was the right of the contractor, who was the debtor, in the judgment, and his right was subject to the superior charge of the noticing lien claimants. Under the first ground stated in the case of Willson v. Salmon, the receiver had no authority to attach the moneys not yet earned, and his claim must be rejected.

Then follow a number of orders drawn by Johnes, the contractor, and served upon Gen. Donnelly, the owner, each operating by way of equitable assignment, and payable out of the residue of the fund, in the order of their priority, as follows: O. E. Askew, for $65.80, served April 17, 1897; this should be secondly paid. Addison B. Johnes, for $45, served April 20, 1897; this should be thirdly paid. Richard H. Smith, for $60, served on April 23, 1897; this should be fourthly paid. Charles McDermott, for $200, served on April 25, 1897; this should be fifthly paid. Doyle and White, for $450, served on April 26, 1897; this should be sixthly paid.

The liens of the above notices served in conformity to the requirements of the mechanic's lien acts, and the other equitable charges upon the residue, above ascertained and established, are more than sufficient (with the costs of suits) to absorb the whole of the moneys paid into court in the cause.

There are several claims which are excluded from sharing in the fund, because the fund is insufficient to pay them. I do not deem it necessary to discuss these in detail. A decree will be advised in accordance with the views above expressed.


Summaries of

Donnelly v. Johnes

COURT OF CHANCERY OF NEW JERSEY
Aug 5, 1899
58 N.J. Eq. 442 (Ch. Div. 1899)
Case details for

Donnelly v. Johnes

Case Details

Full title:DONNELLY v. JOHNES et al.

Court:COURT OF CHANCERY OF NEW JERSEY

Date published: Aug 5, 1899

Citations

58 N.J. Eq. 442 (Ch. Div. 1899)
58 N.J. Eq. 442

Citing Cases

Stahl v. Walters

They personally worked on the building, but not as journeymen or laborers for wages, and are not entitled to…

Stahl v. Walters

The claims of Hecht and Oliver in this respect are conceded. Boerman had a subcontract for the plumbing work,…