From Casetext: Smarter Legal Research

Courtright v. Design Irrigation

Michigan Court of Appeals
May 12, 1995
210 Mich. App. 528 (Mich. Ct. App. 1995)

Summary

In Courtright, a woman sustained an ankle injury while attempting to shut off a broken valve of a sprinkler system near her condominium.

Summary of this case from Insight Teleservices, Inc. v. Zip Mail Servs., Inc.

Opinion

Docket No. 161658.

Submitted March 22, 1995, at Lansing.

Decided May 12, 1995, at 9:30 A.M.

Reeves Jones, P.C. (by Timothy D. Reeves and Donald L. Jones), for Cheryl and Gerald Courtright.

Foster, Swift, Collins Smith, P.C. (by William R. Schulz), for Design Irrigation, Inc.

Before: MURPHY, P.J., and MICHAEL J. KELLY and SAAD, JJ.


Plaintiffs appeal as of right an order of the circuit court granting defendant Design Irrigation, Inc., summary disposition under MCR 2.116(C)(10). We reverse.

On December 14, 1990, plaintiff Cheryl Courtright slipped and broke her ankle while attempting to shut off a broken valve of a sprinkler system near her condominium. Defendant Manhatten Condominium Association, Inc., owned the condominium complex in which plaintiffs resided, and defendant P.M. One, Ltd., managed the complex. Defendant Design Irrigation, Inc., was under contract with P.M. One to drain and winterize the sprinkler system.

Throughout this opinion, the term "plaintiff" in the singular will be used to refer to plaintiff Cheryl Courtright.

At the time of the plaintiff's accident, Design Irrigation had begun the drainage job but had not finished it, leaving some water in the pipes. Freezing temperatures caused some of the pipes to burst, resulting in a small flood. Plaintiff slipped and fell while wading through the water on her way to reach the shut-off valve. Design Irrigation had made no attempt to discover whether P.M. One or Manhatten Condominium Association had finished draining the pipes. Although disputed, there was evidence that Design Irrigation failed to inform P.M. One that it had left the drainage work incomplete.

At issue is whether the evidence presented by plaintiffs created a triable issue of fact regarding Design Irrigation's liability in tort for plaintiff's injuries, especially where the alleged breach of duty may be characterized as a breach of contract with P.M. One. In determining whether plaintiffs have a tort action under these circumstances, we note that Michigan law distinguishes between misfeasance and nonfeasance. Hart v Ludwig, 347 Mich. 559, 564; 79 N.W.2d 895 (1956); Freeman-Darling, Inc v Andries-Storen-Reynaert Multi Group, Inc, 147 Mich. App. 282, 285-286; 382 N.W.2d 769 (1986). Misfeasance is negligence during performance of a contract. While performing a contract, a party owes a separate, general duty to perform with due care so as not to injure another. Breach of this duty may give rise to tort liability. Clark v Dalman, 379 Mich. 251, 261; 150 N.W.2d 755 (1967). The duty to act with due care encompasses the duty to prevent injury from a peril created during performance. See Hart, supra at 565. In contrast, failure to perform a contract altogether constitutes nonfeasance and gives rise only to a suit for breach of contract. Id.

The distinction between misfeasance and nonfeasance is somewhat "difficult to make." Id. at 564. This is particularly true where, as here, a party begins performance of a contract but does not complete it. Relying in part on Hart, supra, and Freeman-Darling, supra, the trial court found Design Irrigation's failure to complete the contract indicative of nonfeasance. We disagree.

On this point, § 324A of the Second Restatement of Torts has been accepted as a correct statement of Michigan law. McMiddleton v Otis Elevator Co, 139 Mich. App. 418, 427-428; 362 N.W.2d 812 (1984). That section provides:

One who undertakes, gratuitously or for consideration, to render services to another which he should recognize as necessary for the protection of a third person or his things, is subject to liability to the third person for physical harm resulting from his failure to exercise reasonable care to protect his undertaking, if

(a) his failure to exercise reasonable care increases the risk of such harm, or

(b) he has undertaken to perform a duty owed by the other to the third person, or

(c) the harm is suffered because of reliance of the other or the third person upon the undertaking. [2 Restatement Torts, 2d, § 324A, p 142.]

Here, Design Irrigation clearly undertook to perform the service of draining the sprinkler system for P.M. One. This maintenance work was deemed necessary for the protection of the tenants and their property. Moreover, there was evidence that Design Irrigation failed to inform P.M. One that the drainage job was incomplete once it stopped work on the pipes. Whether the drainage work had been completed was a fact not readily ascertainable by P.M. One. Under these circumstances, P.M. One could assume that the work was complete. These facts fit within § 324A(c). See also 2 Restatement Torts, 2d, § 324A, comment e, illustration 4, p 141. They are also analogous to the facts in Talucci v Archambault, 20 Mich. App. 153; 173 N.W.2d 740 (1969), where the defendant failed to remove ice and snow from the walkway of a business, as required by contract. The Court held that the defendant had undertaken to remove the snow and that its failure to do so could be deemed a failure to exercise due care. Id. at 160-161.

Hart, supra, which involved incomplete performance of a contract, is distinguishable. There, the defendant repudiated a contract to maintain an orchard. He did so after completing one season's work and shortly after beginning the next season's work. 347 Mich. 560. The defendant plainly refused to perform, rather than letting it appear that the job was complete when it was not. Unlike the drainage of underground pipes, the Hart defendant's failure to maintain the orchard was plainly visible. In short, the plaintiffs there could hardly rely on the defendant to complete performance after the defendant announced his repudiation of the contract.

Freeman-Darling, supra, is also distinguishable. That case involved a delay in performance, not an abandonment of performance that was not readily apparent and that resulted in a hidden danger. 147 Mich. App. 288.

The trial court erred in concluding as a matter of law that plaintiffs could not establish a case of misfeasance.

Reversed.


Summaries of

Courtright v. Design Irrigation

Michigan Court of Appeals
May 12, 1995
210 Mich. App. 528 (Mich. Ct. App. 1995)

In Courtright, a woman sustained an ankle injury while attempting to shut off a broken valve of a sprinkler system near her condominium.

Summary of this case from Insight Teleservices, Inc. v. Zip Mail Servs., Inc.
Case details for

Courtright v. Design Irrigation

Case Details

Full title:COURTRIGHT v DESIGN IRRIGATION, INC

Court:Michigan Court of Appeals

Date published: May 12, 1995

Citations

210 Mich. App. 528 (Mich. Ct. App. 1995)
534 N.W.2d 181

Citing Cases

Insight Teleservices, Inc. v. Zip Mail Servs., Inc.

As the primary case on which Insight relies clearly indicates, Michigan law distinguishes between misfeasance…

Roskam Baking Co. v. Lanham Machinery Co., Inc.

See Sutherland v. Kennington Truck Serv., Ltd., 454 Mich. 274, 286, 562 N.W.2d 466, 471 (1997). The Michigan…