Opinion
Index No. 161063/2019 MOTION SEQ. Nos. 004 005
09-16-2024
Unpublished Opinion
MOTION DATE 03/01/2024
PRESENT: HON. DAVID B. COHEN, Justice
DECISION + ORDER ON MOTION
DAVID B. COHEN, J.S.C.
The following e-filed documents, listed by NYSCEF document number (Motion 004) 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 129, 130, 131, 137 were read on this motion to/for JUDGMENT - SUMMARY.
The following e-filed documents, listed by NYSCEF document number (Motion 005) 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 125, 132, 133, 134, 135, 136 were read on this motion to/for JUDGMENT - SUMMARY.
In this Labor Law action, plaintiff moves (seq. 005), pursuant to CPLR 3212, for summary judgment against defendants on the issue of liability under Labor Law §§ 200, 240(1), and 241(6). Defendants move (seq. 004), pursuant to CPLR 3212, for summary judgment dismissing the complaint.
I. Factual and Procedural Background
This case arises from an incident on June 25, 2019, in which plaintiff was allegedly injured after a chisel struck him while working on a construction site located at 509 West 129 Street in Manhattan (premises) (NYSCEF Doc No. 1). The premises were owned by defendants The City of New York (City) and New York City School Construction Authority (SCA) (Doc No. 90 at 20).
Plaintiffs employer, non-party Whitestone Construction Corp., was the general contractor on the construction project at the premises, which involved remodeling a public-school building (Doc No. 90 at 18-20). Plaintiff commenced this action against defendants, alleging claims of violations of Labor Law §§ 200, 240(1), and 241(6) (Doc No. 12).
A. Plaintiffs testimony (NYSCEF 105)
At his deposition, plaintiff testified that he had been working on a five-level scaffold on the day of his accident. At approximately 6 p.m., plaintiff took a fifteen-minute break with two coworkers, and they sat on the scaffold platform on which they had been working, while work was being performed above them on the scaffold. During this break, a metal chisel allegedly fell down from above and hit plaintiff. He also testified that there was no netting above the scaffold at the time of the accident, and there was a one- to two-foot gap between the scaffold and the building.
Further, he was supervised at the premises only by Whitestone employees.
B. Whitestone 's affidavit (NYSCEF 116)
In an affidavit, Whitestone's project superintendent states that he was working at the site on the accident date, and that during the break, the entire Whitestone work crew stopped working and no work was performed during the duration of the break. The superintendent was on the second floor of the scaffold, performing a visual inspection of the facade, and he did not remember seeing any tools, materials or debris on the scaffold. Moreover, chisels were to be stored in buckets on the scaffold when not in use, and not left on the scaffold platform.
The superintendent learned about the accident after it happened from the shop steward, and he observed plaintiff sitting on the scaffold's sidewalk bridge. Plaintiff told the superintendent that a chisel had fallen on him from above and hit his shoulder. The superintendent then prepared an incident report, based entirely on what plaintiff told him had happened; he did not personally observe anything mentioned in the report, nor did he talk to anyone other than plaintiff.
Moreover, on the accident date, the scaffold had toeboards in place to prevent objects from being kicked off of the platform, netting on every level to keep objects from falling, and a four-foot-high parapet wall to keep objects from falling from the sidewalk bridge.
The superintendent reiterated that plaintiff and other Whitestone employees were supervised only by Whitestone. Employees were not supposed to be sitting on the bridge or scaffold during their breaks.
C. S.C. A Injury Report and Site Safety Observation Report (NYSCEF Doc Nos. 93 and 95)
An SCA injury report describes an unnamed individual kicking the chisel "through a gap between the underside of the toeboard and the platform deck" (NYSCEF Doc No. 93).
In a site safety observation report prepared eight days prior to the accident, toeboards were noted to be missing from the scaffold in required areas and netting was observed to be damaged in multiple areas (NYSCEF Doc No. 95 at 10, 19-20). The report further depicts unsecured debris close to the edge of the scaffold in numerous places (Id. at 4, 6-7, 12-13).
II. Legal Analysis and Conclusions
Plaintiff and defendants move for summary judgment on plaintiffs Labor Law §§ 200, 240(1), and 241(6) claims.
On a motion for summary judgment, the movant must "establish his cause of action or defense sufficiently to warrant the court as a matter of law in directing judgment in his favor" (Zuckerman v City of New York, 49 N.Y.2d 557, 562 [1980]; Alvarez v Prospect Hosp., 68 N.Y.2d 320, 324 [1986]). After this showing has been made, "the burden shifts to the party opposing the motion for summary judgment to produce evidentiary proof in admissible form sufficient to establish the existence of material issues of fact which require a trial of the action" (Alvarez, 68 N.Y.2d at 324; see also Zuckerman, 49 N.Y.2d at 562).
Labor Law § 200 "codifies an owner's or general contractor's common-law duty of care to provide construction site workers with a safe place to work" (Cappabianca v Skanska USA Bldg. Inc., 99 A.D.3d 139, 143 [1st Dept 2012]; Perrino v Entergy Nuclear Indian Point 3, LLC, 48 A.D.3d 229, 230 [1st Dept 2008]). "Claims for personal injury under the statute and the common law fall into two broad categories: those arising from an alleged defect or dangerous condition existing on the premises and those arising from the manner in which the work was performed" (Cappabianca, 99 A.D.3d at 143-44; Ruisech v Structure Tone Inc., 208 A.D.3d 412, 414 [1st Dept 2022]). Different standards exist for each of these two categories (Cappabianca, 99 A.D.3d at 144; Ruisech, 208 A.D.3d at 414-15).
While plaintiff contends that he was injured due to a dangerous condition, the falling chisel was not a defect "inherent in the property" (Ruisech, 208 A.D.3d at 415 [characterizing uncleaned debris as resulting from the means and methods]; Dalanna v City of New York, 308 A.D.2d 400 [same related to protruding bolt]), but rather resulted from the means and methods of plaintiffs work.
As it is undisputed that defendants neither controlled nor supervised plaintiffs work, his Labor Law § 200 claim against them is dismissed.
"Labor Law § 240(1) imposes a nondelegable duty and absolute liability upon owners and contractors for failing to provide safety devices necessary for workers subjected to elevation-related risks in circumstances specified by the statute" (Soto v J Crew Inc., 21 N.Y.3d 562, 566 [2013] [citations omitted]; see Healy v EST Downtown, LLC, 38 N.Y.3d 998, 999 [2022]).
A plaintiff seeking summary judgment on the issue of liability "must establish that the statute was violated and that such violation was a proximate cause of his injury" (Barreto v Metropolitan Transp. Auth., 25 N.Y.3d 426, 433 [2015]; see Villanueva v 114 Fifth Ave. Assoc. LLC, 162 A.D.3d 404, 405 [1st Dept 2018]). "[F]or section 240(1) to apply, a plaintiff must show more than simply that an object fell causing injury to a worker. A plaintiff must show that the object fell, while being hoisted or secured, because of the absence or inadequacy of a safety device of the kind enumerated in the statute" (Narducci v Manhasset Bay Assoc., 96 N.Y.2d 259, 268 [1st Dept 2001]; Harsanyi v Extell 4110 LLC, 220 A.D.3d 528, 529 [1st Dept 2023]).
Here, plaintiff contends that the chisel that struck him should have been secured, and that the failure to do so constitutes a violation of section 240(1). Defendants argue that because there was no work being done immediately prior to the accident, there can be no liability, which plaintiff denies is apposite precedent in the First Department.
While plaintiff is correct that it is irrelevant in the First Department that the accident occurred during a break in the work (see Hoyos v NY-1095 Ave. of the Americas, LLC, 156 A.D.3d 491 [1st Dept 2017] [finding "no merit to (defendant's) contention that plaintiff was not actually engaged in work involving a gravity-related risk . . . We have held that injuries sustained while a worker was on site, although entering or exiting the site, or on a break, come within the protections of Labor Law § 240(1)"]; see also Payne v NSH Community Svces., Inc., 203 A.D.3d 546 [1st Dept 2022] [summary dismissal of 240(1) claim properly denied where plaintiff injured while exiting garage during coffee break]), there are nevertheless numerous issues of fact that preclude summary judgment in any party's favor, including whether the chisel could and should have been secured (compare Rincon v New York City Hous. Auth., 202 A.D.3d 421 [1st Dept 2022] [plaintiff entitled to summary judgment as he was injured when wrench slipped out of coworker's hand and fell on him, and evidence showed wrench could have been tethered to worker]), and whether defendants had taken sufficient safety precautions, including installing and maintaining toeboards, netting, and a parapet wall around the scaffolding to protect against falling objects.
Labor Law § 241(6) imposes a nondelegable duty on premises owners and contractors at construction sites to provide reasonable and adequate safety to workers. To establish a claim under the statute, a plaintiff must show that a specific, applicable Industrial Code regulation was violated, and that the violation caused the complained-of injury (Cappabianca v Skanska USA Bldg. Inc., 99 A.D.3d 139 [1st Dept 2012]).
In his bill of particulars, plaintiffs Labor Law § 241(6) claim is predicated on violations of numerous Industrial Code provisions. However, he only addresses Code sections 23-1.15(c), 23-2.1(a)(2), and 23-5.l(j)(1) in his motion papers, and has thus abandoned any others (see Rodriguez v Dormitory Auth. of the State of N.Y., 104 A.D.3d 529, 530-531 [1st Dept 2013]; Cardenas v One State St., LLC, 68 A.D.3d 436, 438 [1st Dept 2009]).
Code section 23-2.1(a)(2) requires that "[m]aterial and equipment shall not be placed or stored so close to any edge of a floor, platform or scaffold as to endanger any person beneath such edge." As defendants rely on the superintendent's testimony that no equipment was stored or placed on the scaffold immediately before plaintiffs accident, and as plaintiff did not observe from where and how the chisel fell, defendants demonstrate this Code section is inapplicable.
Although Industrial Code §§ 23-1.15(c) and 23-5.1 (j)(1) did not appear in plaintiff s bill of particulars, plaintiff contends he should be allowed to amend to add them. Defendants respond that they are inapplicable and leave to amend should therefore not be granted.
Industrial Code §§ 23-1.15(c) and 23-5. l(j)(1), read together, require a toeboard of certain specifications on scaffold platforms "except when such safety railing is installed at grade or ground level or is not adjacent to any opening, pit or other area which may be occupied by any person."
Plaintiff maintains that these sections, when taken together, require a toeboard of certain specifications to be flush on scaffold platforms, and the fact that the chisel fell on him proves that such a toeboard, to the extent it was existed at the premises, was improperly installed. Because a properly-installed toeboard would have prevented the chisel from falling, plaintiff argues that the violation of the Code was the proximate cause of his injuries.
Plaintiffs and defendants' experts provide differing opinions as to whether the toeboards at the site complied with the requisite specifications and whether they were built and/or installed defectively, thus creating an issue of fact as to these Code violations.
Moreover, as there is possible merit to plaintiffs claims related to these Code sections, and defendants claim no surprise or prejudice in having to defend against them, plaintiffs motion for leave to amend his bill of particulars to add these violations is granted (McCaskey, Davies &Assocs., Inc. vNew York City Health &Hosps. Corp., 59 N.Y.2d 755, 756 [1983]; Walker v Metro-North Commuter R.R., 11 A.D.3d 339, 340-41 [1st Dept 2004]).
III. CONCLUSION
Accordingly, it is hereby:
ORDERED that defendants' motion for summary judgment (seq. 004) and plaintiffs motion for partial summary judgment (seq. 005) are granted solely to the extent of:
(1) severing and dismissing plaintiff s Labor Law § 200 and common-law negligence claims;
(2) granting plaintiff s motion for leave to amend his bill of particulars to add violations of Industrial Code sections 23-1.15(c) and 23-5. l(j)(1); and
(3) upon such amendment, dismissing all of plaintiffs cited Industrial Code violations except sections 23-1.15(c) and 23-5.1(j)(1); and is otherwise denied; and it is further
ORDERED, that the parties appear for a trial scheduling/status conference on January 29, 2024, at 9:30 a.m., at 71 Thomas Street, Room 305, New York, New York.